Forwards LER 98-016-00,re Failure to Test Valves 1SX013D/E/F IAW in-service Testing Program.Commitments Made within Ltr, Listed
ML20249A407
Person / Time
Site: Clinton Constellation icon.png
Issue date: 06/11/1998
From: Walter MacFarland
ILLINOIS POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20249A408 List:
References
U-603024, NUDOCS 9806160408
Download: ML20249A407 (2)


LER-2098-016, Forwards LER 98-016-00,re Failure to Test Valves 1SX013D/E/F IAW in-service Testing Program.Commitments Made within Ltr, Listed
Event date:
Report date:
4612098016R00 - NRC Website

text

!!hnoig Power Cornpany Clinton Power Station

- c. P.O. Box 678 T ,f Cienton,IL 61727 7,

l_

Tel 217 0354623 i

  • Fax 217 9354 632 Walter G. MacFarland IV

.c Senior Vice President and Ctnef Nuclear Officer

-ILLINSIS P9WER fcig24 An Illinova Company June 11, 1998-Docket No. 50-461 10CFR50.73 Document Control Desk Nuclear Regulatory Commission Washington, D.C. 20555

Subject:

Clinton Power Station - Unit 1 Licensee Event Report No.98-016.;09

Dear Madam or Sir:

Enclosed is Licensee Event Report (LER) No. 98-016-00: Failure to Test Valves 1 SX013D/E/F in Accordance with the In-Service Testina Program Due to Personnel Error. This report is being submitted in accordance with the requirements of 10CFR50.73. /

This Licensee Event Report contains the following commitments: [

confirm its capability to perform its safety functions prior to entering Modes 1, 2, or M )i '

3.

  • . Updated Safety Analysis Report (USAR) Table 3.9-5, " Balance of Plant (BOP)  ;

Active Valves and Pumps," will be revised to include ISX013D / E / F. l

,o ,

, , \ , u '*

  • 9806160408 HB0611 f' PDR ADOCK 05000461i S PDR t i

~

U-603024 Page 2 e 'A review of safety related valves whose safety functions were downgraded to passive at the time of this event will be performed to ensure that their active safety functions have been properly identified.

Sincerely yours, -

4 Walter G. MacFarland, IV Senior Vice President and ChiefNuclear Officer JRF/mlh Enclosure cc: NRC Clinton Licensing Project Manager NRC Resident Office, V-690 Regional Administrator, Region III, USNRC Illinois Department ofNuclear Safety l