Category:LICENSEE EVENT REPORT (SEE ALSO AO RO)
MONTHYEARRBG-44727, LER 98-S01-00:on 981021,identified That Contract Employee with Temporary Access Authorization Failed to Disclose Complete Criminal & Employment History.Individual Denied Access to Plants for Five Years.With1998-11-17017 November 1998 LER 98-S01-00:on 981021,identified That Contract Employee with Temporary Access Authorization Failed to Disclose Complete Criminal & Employment History.Individual Denied Access to Plants for Five Years.With RBG-44243, LER 97-S03-00:on 970911,contract Employee Was Granted Temporary Access After Failing to List Prior Employment Termination & Access Denial.Caused by Employee Failure to Provide Accurate Info.Updated Info Re Employee1997-10-13013 October 1997 LER 97-S03-00:on 970911,contract Employee Was Granted Temporary Access After Failing to List Prior Employment Termination & Access Denial.Caused by Employee Failure to Provide Accurate Info.Updated Info Re Employee RBG-44204, LER 97-S02-00:on 970717,contract Employee Failed to List Prior Employment Termination Due to Positive Drug Test & Was Granted Temporary Access.Caused by Incomplete Info Provided by Licensee.Deleted Employee'S Key Card1997-09-11011 September 1997 LER 97-S02-00:on 970717,contract Employee Failed to List Prior Employment Termination Due to Positive Drug Test & Was Granted Temporary Access.Caused by Incomplete Info Provided by Licensee.Deleted Employee'S Key Card RBG-44187, LER 97-S01-00:on 970514,contract Employee Did Not Identify Criminal Background & Was Granted Temporary Access.Caused by Inaccurate & Incomplete Info Provided by Employee.Employee'S Key Card Was Suspended1997-08-28028 August 1997 LER 97-S01-00:on 970514,contract Employee Did Not Identify Criminal Background & Was Granted Temporary Access.Caused by Inaccurate & Incomplete Info Provided by Employee.Employee'S Key Card Was Suspended 05000458/LER-1993-0161993-08-27027 August 1993 LER 93-016-00:on 930727,HPCS Sys Actuation Occurred Due to Improperly Prepared Rev to Surveillance Test Procedure. Changed Surveillance Procedure STP-051-4811.W/930827 Ltr 05000458/LER-1993-0121993-08-26026 August 1993 LER 93-012-01:on 930603,deficiency in Plant Surveillance Test Procedures Identified.Caused by Inattention to Detail During Initial Procedure.Surveillance Test Procedures revised.W/930826 Ltr 05000458/LER-1993-0151993-08-23023 August 1993 LER 93-015-00:on 930723,discovered Time Response Testing of Isolation Instrumentation for RWCU & RCIC Sys Not Performed at Intervals Required by Tss.Caused by Scheduling Error & Misinterpretation of Ts.Schedule revised.W/930824 Ltr 05000458/LER-1993-0101993-08-16016 August 1993 LER 93-010-01:on 930514,SDC Loss for Three Minutes When SDC Suction Valves Closed.Caused by Failure to Identify Need for Compensatory Measures.Revised Procedural Guidance Clarifying Valve isolation.W/930816 Ltr 05000458/LER-1990-0221990-06-18018 June 1990 LER 90-022-00:on 900518,HPCS Sys Declared Inoperable & 14-day Shutdown Limiting Condition for Operation Entered Due to Inoperative Suppression Pool Level Transmitter.Caused by Personnel Error.Reactor Operators trained.W/900618 Ltr 05000458/LER-1987-001, Corrected LER 87-001-00:on 870108,discovered That Main Plant & Fuel Bldg Exhaust Radiation Monitor Particulate & Iodine Samplers Isolated Since 870107.Caused by Operator Error. Operator Aid Issued1987-02-0909 February 1987 Corrected LER 87-001-00:on 870108,discovered That Main Plant & Fuel Bldg Exhaust Radiation Monitor Particulate & Iodine Samplers Isolated Since 870107.Caused by Operator Error. Operator Aid Issued 05000458/LER-1986-009, Corrected LER 86-009-00:on 860114,radwaste Liquid Effluent Monitor Sample Pump Not Started During Radioactive Liquid Discharge.Caused by Miscommunication & Procedure Ambiguities.Procedures Revised1986-02-13013 February 1986 Corrected LER 86-009-00:on 860114,radwaste Liquid Effluent Monitor Sample Pump Not Started During Radioactive Liquid Discharge.Caused by Miscommunication & Procedure Ambiguities.Procedures Revised 1998-11-17
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARRBG-45144, Monthly Operating Rept for Sept 1999 for River Bend Station. with1999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for River Bend Station. with ML20216G1201999-09-0909 September 1999 Rev 3 to Rbs,Cycle 9 Colr RBG-45110, Monthly Operating Rept for Aug 1999 for River Bend Station, Unit 1.With1999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for River Bend Station, Unit 1.With RBG-45087, Special Rept:On 990510,LPCI a & LPCS Injected Into Rv for Less than Two Minutes.Caused by Electrical Transient in One of ECCS Power Supplies.Operators Verified Reactor Cavity Level & Closed Injection Valves to Stop Injection1999-08-0606 August 1999 Special Rept:On 990510,LPCI a & LPCS Injected Into Rv for Less than Two Minutes.Caused by Electrical Transient in One of ECCS Power Supplies.Operators Verified Reactor Cavity Level & Closed Injection Valves to Stop Injection ML20210K4721999-08-0303 August 1999 SER Accepting Licensee 180-day Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves RBG-45091, Monthly Operating Rept for July 1999 for River Bend Station, Unit 1.With1999-07-31031 July 1999 Monthly Operating Rept for July 1999 for River Bend Station, Unit 1.With ML20210C6391999-07-0202 July 1999 Rev 2 to River Bend Station,Cycle 9 Colr RBG-45055, Monthly Operating Rept for June 1999 for River Bend Station, Unit 1.With1999-06-30030 June 1999 Monthly Operating Rept for June 1999 for River Bend Station, Unit 1.With ML20196J8031999-06-24024 June 1999 Rev 1 to Rbs,Cycle 9 Colr RBG-45028, Monthly Operating Rept for May 1999 for River Bend Station, Unit 1.With1999-05-31031 May 1999 Monthly Operating Rept for May 1999 for River Bend Station, Unit 1.With RBG-45016, Monthly Operating Rept for Apr 1999 for River Bend Station, Unit 1.With1999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for River Bend Station, Unit 1.With ML20206A2111999-04-21021 April 1999 Safety Evaluation Authorizing Pump Relief Request PRR-001 & Valve Relief Request VRR-001 & Denying Valve Relief Request VRR-002 RBG-44969, Monthly Operating Rept for Mar 1999 for River Bend Station, Unit 1.With1999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for River Bend Station, Unit 1.With ML20205S0601999-03-31031 March 1999 Rept on Status of Public Petitions Under 10CFR2.206 with Status Change from Previous Update,990331 ML20205D5481999-03-26026 March 1999 SER Accepting Util Proposed Alternative to Exam Weld AA with Weld Volume Coverage of 62 Percent for First 10-year Insp Interval Pursuant to 10CFR50.55a(a)(3)(ii) & 10CFR50.55a(g)(6)(ii)(A)(5) RBG-44930, Monthly Operating Rept for Feb 1999 for River Bend Station, Unit 1.With1999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for River Bend Station, Unit 1.With RBG-44826, Monthly Operating Rept for Dec 1998 for River Bend Station Unit 1.With1998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for River Bend Station Unit 1.With ML20198K2701998-12-22022 December 1998 Rev 1 to RBS Cycle 8 Colr RBG-44773, Monthly Operating Rept for Nov 1998 for River Bend Station, Unit 1.With1998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for River Bend Station, Unit 1.With RBG-44727, LER 98-S01-00:on 981021,identified That Contract Employee with Temporary Access Authorization Failed to Disclose Complete Criminal & Employment History.Individual Denied Access to Plants for Five Years.With1998-11-17017 November 1998 LER 98-S01-00:on 981021,identified That Contract Employee with Temporary Access Authorization Failed to Disclose Complete Criminal & Employment History.Individual Denied Access to Plants for Five Years.With ML20195C4841998-11-0606 November 1998 SER Accepting QA Program Change to Consolidate Four Existing QA Programs for Arkansas Nuclear One,Grand Gulf Nuclear Station,River Bend Station & Waterford 3 Steam Electric Station Into Single QA Program ML20155H3491998-11-0303 November 1998 Safety Evaluation Granting Requests for Relief RR2-0001, RR2-0002 & RR2-0003 RBG-44719, Monthly Operating Rept for Oct 1998 for River Bend Station, Unit 1.With1998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for River Bend Station, Unit 1.With ML20155C1351998-10-26026 October 1998 Rev B to Entergy QA Program Manual RBG-44677, Monthly Operating Rept for Sept 1998 for River Bend Station, Unit 1.With1998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for River Bend Station, Unit 1.With ML20154E2171998-09-28028 September 1998 Follow-up Part 21 Rept Re Defect with 1200AC & 1200BC Recorders Built Under Westronics 10CFR50 App B Program. Westronics Has Notified Bvps,Ano & RBS & Is Currently Making Arrangements to Implement Design Mods ML20151S5421998-09-0303 September 1998 Safety Evaluation Opposing Licensee Thermal Model as Currently Implemented.Evaluation Recommended to Be Used in Any follow-up Site Insp RBG-44629, Monthly Operating Rept for Aug 1998 for River Bend Station, Unit 1.With1998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for River Bend Station, Unit 1.With ML20236X2351998-08-0505 August 1998 Part 21 Rept Re Defect Associated W/Westronics 1200AC & 1200BC Recorders Built Under Westronics 10CFR50,App B Program.Beaver Valley,Arkansas Nuclear One & River Bend Station Notified.Design Mod Is Being Developed RBG-44600, Monthly Operating Rept for July 1998 for River Bend Station1998-07-31031 July 1998 Monthly Operating Rept for July 1998 for River Bend Station RBG-44564, Monthly Operating Rept for June 1998 for River Bend Station, Unit 11998-06-30030 June 1998 Monthly Operating Rept for June 1998 for River Bend Station, Unit 1 ML20249A6431998-06-12012 June 1998 SER Accepting 980427 Request for Change to River Bend QA Manual Program Description,Per 10CFR50.54(a)(3) RBG-44539, Monthly Operating Rept for May 1998 for River Bend Station, Unit 11998-05-31031 May 1998 Monthly Operating Rept for May 1998 for River Bend Station, Unit 1 RBG-44501, Monthly Operating Rept for Apr 1998 for River Bend Station, Unit 11998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for River Bend Station, Unit 1 ML20217M8951998-04-30030 April 1998 QA Program Manual ML20217P8281998-04-0707 April 1998 Safety Evaluation Accepting Relief Authorization for Alternative to Requirements of ASME Section Xi,Subarticle IWA-5250 Bolting Exam for Plants,Per 10CFR50.55a(a)(3)(i) RBG-44458, Monthly Operating Rept for Mar 1998 for River Bend Station, Unit 11998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for River Bend Station, Unit 1 RBG-44423, Monthly Operating Rept for Feb 1998 for River Bend Station Unit 11998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for River Bend Station Unit 1 ML20203L6631998-02-11011 February 1998 Rev 0 to River Bend Station,1998 Emergency Preparedness Exercise RBG-44385, Monthly Operating Rept for Jan 1998 for River Bend Station, Unit 11998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for River Bend Station, Unit 1 RBG-44353, Monthly Operating Rept for Dec 1997 for River Bend Station, Unit 11997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for River Bend Station, Unit 1 RBG-44460, Forwards Annual Radiological Environmental Operating Rept, for Period Jan-Dec 19971997-12-31031 December 1997 Forwards Annual Radiological Environmental Operating Rept, for Period Jan-Dec 1997 ML20203H9891997-12-12012 December 1997 Part 21 Rept Re Potential Manufacturing Defect of Enterprise DSR-4 & DSRV-4 Edgs.Cooper Energy Svcs Supplied 1A-7840 Adjusting Screw to Affected Utils & Sites.River Bend Station Replaced W/Acceptable Assemblies ML20202E9941997-12-0101 December 1997 ISI Plan Second Ten-Yr Interval (Dec 1,1997-Nov 30,2007) ML20199K9741997-11-30030 November 1997 Brief Aerial Photography Analysis of RBS at St Francisville,LA:1996-1997 RBG-44337, Monthly Operating Rept for Nov 1997 for River Bend Station, Unit 11997-11-30030 November 1997 Monthly Operating Rept for Nov 1997 for River Bend Station, Unit 1 ML20202F0191997-11-28028 November 1997 Safety Evaluation Approving Transfer of License NPF-47 for River Bend Station,Unit 1 ML20199H3711997-11-19019 November 1997 SER Accepting Approving Request Relief from Requirements of Section XI, Rule for Inservice Insp of NPP Components, of ASME for Current or New 10-year Inservice Insp Interval IAW 50.55(a)(3)(i) of 10CFR50 RBG-44295, Monthly Operating Rept for Oct 1997 for River Bend Station Unit 11997-10-31031 October 1997 Monthly Operating Rept for Oct 1997 for River Bend Station Unit 1 RBG-44243, LER 97-S03-00:on 970911,contract Employee Was Granted Temporary Access After Failing to List Prior Employment Termination & Access Denial.Caused by Employee Failure to Provide Accurate Info.Updated Info Re Employee1997-10-13013 October 1997 LER 97-S03-00:on 970911,contract Employee Was Granted Temporary Access After Failing to List Prior Employment Termination & Access Denial.Caused by Employee Failure to Provide Accurate Info.Updated Info Re Employee 1999-09-09
[Table view] |
Text
_ _ _
+
e Ent:rgy Operations. Inc.
Fhver Dond Stahon 54 5 S 'ghway 01 St Francisvil:e. LA 70775 Tel 504 336 0225 Fav 504 635 $068 Rick J. King D w tor IIJCleef Safety 6 Rego'awy Af',ws August 28,1997 U.S. Nuclear Regulatory Commission Document Control Desk, OPI-17 Washington, D.C. 20555
Subject:
River Bend Station - Unit 1 Docket No. 50-458 License No. NPF-47 Safeguards Event Report 50-458/97-S01-00 File Nos. G9.5, G9.25.1.3 RBG-44187 RBF1-97-0314 Gentlemen:
In accordance with 10CFR73,71(b)(1), enclosed is the subject security event report.
Sincerely, RJK/WJF/mbp enclosure
, g q! '
/
6 C:,0C65
\'\
97090500/-1 970828 ;
PDR ADOCK 05000458 .
S PDR i
- Safeguards Event Report 50-458/97-S01-00
- August 28,1997
- RBO-44187 r RBF1-97-0314
' Page 2 of 2 i
cc: ' U. S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 400
- Arlington,TX 76011 NRC Sr. Resident Inspector P. O. Box 1050 St. Francisville, LA 70775 INPO Records Center 700 Galleria Parkway Atlanta, GA 30339-3064 Mr. Glenn Dishong Public Utility Commission of Texas 1701 N. Cong:ess Ave.
. 1 Austin, TX- 78711-3326 Louisiana Department of Environmental Quality Radiation Protection Division -
P.O. Box 82135 Baton Rouge, LA 70884-2135 ATTN: Administrator i
~
'NRC FORM 366 U.S. NUCLEAR REAULATORY COMMIS$10N (4-H) APPROVED BY OMB NO. 315o 01o4 EXPIRES 04/30/98 L*4Wl?dTMTdWu%) 58"i2!"7#o"&"o'Ml80 LICENSEE EVENT REPORT (LER) E"'fo%"s'A"I W*E 'c"Sa'*E'"A//^ES Was (See reverse for re9uired number of 3N NGYAENSISN AS i 0001 AND TO THE PAP RWORK REDUCTION PROJECT (3150-0104), OF FICE i
digits / characters for each block) OF MANAGEMENT ANC UDGET. WASHINGTON DC 20503 i
FAGIUTT NAME p)
UUW i NVynn p) PAGE p)
River Bond Station 05000 4 58 1 of 2 riftE m Contract Employee Did Not identify Criminal Background And Was Granted Temporary Access EVENT DATE (5) LER NUMutR (5) REPORT DATE (7) uvNm DAT YLAR YLAN OTHER FACILilits INVOLVED (5)
M Ip RE N MUNm DAY YLAM F ACILUY NAMc UOW I NUMULR N/A 05000 5 14 97 97 -
501 -
00 08 28 97 FAGILHY NAML UUW I NMLR N/A 05000 M7 2 THis "tPOr.1 is 5UsMi t I tu PUI 15UANT r0 THE REQUI (LMENT5 OF 10 RR j; (Check one or more) (11) 20 2201(b) 20.2203(ax2xv) 50 73(a)(2)(i) 50.73(a)(2xvm) um 1% 20 22o3(axi) 20.22o3(ex3xi) so 73(ex2xn) so.73(ax2xx) 20.2203(a)(2)(i) 20 2203(a)(3)(u) 7311 50.73(ax2)(su) X
- 20 2203(a)(2xn) 20.22o3(ax4) so.73(a)(2xw) OTHER 20.2203(ax2)(iii) 50 36(c)(1) 50 73(a)(2)(v) gi ad below 20.2203(a)(2)(iv) 50.36(c)(2) 50 73(a)(2)(vu)
LIGEN5EE CONTAGT FOR THIS LER (12)
NAML TELLPHUNL NUMULM (imivde Arce Code)
D. N. Lorfing, Supervisor - Licensing 504-381 4157 cAust GOMPLLIt ONE LINE FOR EACH COMPONENT FAILURE DEUGRIBED IN THIS MtVORT (13)
>Y b i t M c0MPUNLN T MANUF ACTUMLR H UN L LAUbL bYbILM GUMPUNLNT MANUF AMUHLH H U 1 E 5 JPPLEMENTA L REPORT LAPlmi tu (14) EXP Witu MONTH DA( YEAR SUBMISSION DATE (15)
YE5 NO
, (if yes. complete EXPECTED SUBMISSION DATEL K AS41RACT (Limit to 1400 spaces, i e., approximately 15 single-spaced typewntien lines) (15) 1 On July 29,1997, with the plant in mode 2 at 1% power, River Bend Station (RBS) received Federal Bureau of 4
Investigation (FBI) fmgerprint results on a contract employee which reflected several arrests and convictions.
The individual had been granted temporary unescorted access on May 14,1997, in accordance with RBS procedures. This discrepancy is reportable pursuant to 10CFR73.71(b)(1).
Immediate actions included suspension of the employ and stated that no felony convictions were included his record. m,Theee's keyofcard.
cause Thewas this event contract employee determined to be was 1
inaccurate and incomplete information provided by the employee. RBS programs and procedures functioned as expected in detecting and resolving this issue.
During the time in which the employee had access to the RBS protected area, responsibilities included moving furniture and changing light bulbs. The employee did not have access to or enter vital areas of the plant.
j Therefore, this condition had no safety significance, i
ARC FDidt 366A U.S. NUCLEAR REGULATORY COMMISSION
, (4 95)
LICENSEE EVENT REPORT (LER)
TEXT CONTINUATION FACILITY NAME (1) DOCKET LER NUMBER (6) PAGE (3)
River Bond Station 05000 4 58 ^^a ",m"Ja* ",%;7,"
97 - So1 - 00 2 of 2 HACKGROUND On March 6,- 1997, a contract employee was fingerprinted as part of the initial River Bend Station (RBS) processing for unescorted access. The fingerprints were submitted for background verification on the same day.
On May 14,1997, the employee was granted temporary unescorted access, based upon satisfactorily completing the initial RBS access processing requirements. The RBS process for granting temporary access includes -
among other things - an employment check for the last year, a credit check, identity verification through one photo identification (e.g. driver's license), and passing a psychological evaluation. The responsibilities of the contract employee included moving furniture and occasionally changing light bulbs, REPORTED CONDITION On July 29,1997, with the plant at 1% power in mode 2 (start-up), RBS received Federal Bureau of Investigation (FBI) fingerprint results listing several arrests and convictions for the employee, beginning in IE 72. The employee's access was immediately suspended. This event is reportable pursuant to 10CFR73.71(b)(1).
INVESTIGATION The individual was on-site when the FBI fingerprint results were received on July 29th, and was brought in and interviewed. During the interview, the employee stated that he was not aware that any of the charges constituted felonies and that, to the best of his knowledge, all of them were misdemeanors. RBS has not been able to substantiate thus far that felony convictions are not included. Also, the individual has not provided information to show that no felonies are included. The individual's access to RBS has been denied.
ROOT CAUSE The cause for this event was the contract employee's failure to provide accurate and complete information.
CORRECTIVE ACTIONS TO PREVENT RECURRENCE RBS programs and procedures functioned as expect. Jo actions are necessary to prevent recurrence.
SAFETV ASSESSMENT '
During the time in which the employee had access to the RBS protected area, responsibility included moving fumiture and changing light bulbs. His keycard allowed general protected area access only. The employee did not have access to radiological controlled areas or vital areas of the plant. Therefore, this condition had no safety significance.