Category:LICENSEE EVENT REPORT (SEE ALSO AO RO)
MONTHYEARRBG-44727, LER 98-S01-00:on 981021,identified That Contract Employee with Temporary Access Authorization Failed to Disclose Complete Criminal & Employment History.Individual Denied Access to Plants for Five Years.With1998-11-17017 November 1998 LER 98-S01-00:on 981021,identified That Contract Employee with Temporary Access Authorization Failed to Disclose Complete Criminal & Employment History.Individual Denied Access to Plants for Five Years.With RBG-44243, LER 97-S03-00:on 970911,contract Employee Was Granted Temporary Access After Failing to List Prior Employment Termination & Access Denial.Caused by Employee Failure to Provide Accurate Info.Updated Info Re Employee1997-10-13013 October 1997 LER 97-S03-00:on 970911,contract Employee Was Granted Temporary Access After Failing to List Prior Employment Termination & Access Denial.Caused by Employee Failure to Provide Accurate Info.Updated Info Re Employee RBG-44204, LER 97-S02-00:on 970717,contract Employee Failed to List Prior Employment Termination Due to Positive Drug Test & Was Granted Temporary Access.Caused by Incomplete Info Provided by Licensee.Deleted Employee'S Key Card1997-09-11011 September 1997 LER 97-S02-00:on 970717,contract Employee Failed to List Prior Employment Termination Due to Positive Drug Test & Was Granted Temporary Access.Caused by Incomplete Info Provided by Licensee.Deleted Employee'S Key Card RBG-44187, LER 97-S01-00:on 970514,contract Employee Did Not Identify Criminal Background & Was Granted Temporary Access.Caused by Inaccurate & Incomplete Info Provided by Employee.Employee'S Key Card Was Suspended1997-08-28028 August 1997 LER 97-S01-00:on 970514,contract Employee Did Not Identify Criminal Background & Was Granted Temporary Access.Caused by Inaccurate & Incomplete Info Provided by Employee.Employee'S Key Card Was Suspended 05000458/LER-1993-0161993-08-27027 August 1993 LER 93-016-00:on 930727,HPCS Sys Actuation Occurred Due to Improperly Prepared Rev to Surveillance Test Procedure. Changed Surveillance Procedure STP-051-4811.W/930827 Ltr 05000458/LER-1993-0121993-08-26026 August 1993 LER 93-012-01:on 930603,deficiency in Plant Surveillance Test Procedures Identified.Caused by Inattention to Detail During Initial Procedure.Surveillance Test Procedures revised.W/930826 Ltr 05000458/LER-1993-0151993-08-23023 August 1993 LER 93-015-00:on 930723,discovered Time Response Testing of Isolation Instrumentation for RWCU & RCIC Sys Not Performed at Intervals Required by Tss.Caused by Scheduling Error & Misinterpretation of Ts.Schedule revised.W/930824 Ltr 05000458/LER-1993-0101993-08-16016 August 1993 LER 93-010-01:on 930514,SDC Loss for Three Minutes When SDC Suction Valves Closed.Caused by Failure to Identify Need for Compensatory Measures.Revised Procedural Guidance Clarifying Valve isolation.W/930816 Ltr 05000458/LER-1990-0221990-06-18018 June 1990 LER 90-022-00:on 900518,HPCS Sys Declared Inoperable & 14-day Shutdown Limiting Condition for Operation Entered Due to Inoperative Suppression Pool Level Transmitter.Caused by Personnel Error.Reactor Operators trained.W/900618 Ltr 05000458/LER-1987-001, Corrected LER 87-001-00:on 870108,discovered That Main Plant & Fuel Bldg Exhaust Radiation Monitor Particulate & Iodine Samplers Isolated Since 870107.Caused by Operator Error. Operator Aid Issued1987-02-0909 February 1987 Corrected LER 87-001-00:on 870108,discovered That Main Plant & Fuel Bldg Exhaust Radiation Monitor Particulate & Iodine Samplers Isolated Since 870107.Caused by Operator Error. Operator Aid Issued 05000458/LER-1986-009, Corrected LER 86-009-00:on 860114,radwaste Liquid Effluent Monitor Sample Pump Not Started During Radioactive Liquid Discharge.Caused by Miscommunication & Procedure Ambiguities.Procedures Revised1986-02-13013 February 1986 Corrected LER 86-009-00:on 860114,radwaste Liquid Effluent Monitor Sample Pump Not Started During Radioactive Liquid Discharge.Caused by Miscommunication & Procedure Ambiguities.Procedures Revised 1998-11-17
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARRBG-45144, Monthly Operating Rept for Sept 1999 for River Bend Station. with1999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for River Bend Station. with ML20216G1201999-09-0909 September 1999 Rev 3 to Rbs,Cycle 9 Colr RBG-45110, Monthly Operating Rept for Aug 1999 for River Bend Station, Unit 1.With1999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for River Bend Station, Unit 1.With RBG-45087, Special Rept:On 990510,LPCI a & LPCS Injected Into Rv for Less than Two Minutes.Caused by Electrical Transient in One of ECCS Power Supplies.Operators Verified Reactor Cavity Level & Closed Injection Valves to Stop Injection1999-08-0606 August 1999 Special Rept:On 990510,LPCI a & LPCS Injected Into Rv for Less than Two Minutes.Caused by Electrical Transient in One of ECCS Power Supplies.Operators Verified Reactor Cavity Level & Closed Injection Valves to Stop Injection ML20210K4721999-08-0303 August 1999 SER Accepting Licensee 180-day Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves RBG-45091, Monthly Operating Rept for July 1999 for River Bend Station, Unit 1.With1999-07-31031 July 1999 Monthly Operating Rept for July 1999 for River Bend Station, Unit 1.With ML20210C6391999-07-0202 July 1999 Rev 2 to River Bend Station,Cycle 9 Colr RBG-45055, Monthly Operating Rept for June 1999 for River Bend Station, Unit 1.With1999-06-30030 June 1999 Monthly Operating Rept for June 1999 for River Bend Station, Unit 1.With ML20196J8031999-06-24024 June 1999 Rev 1 to Rbs,Cycle 9 Colr RBG-45028, Monthly Operating Rept for May 1999 for River Bend Station, Unit 1.With1999-05-31031 May 1999 Monthly Operating Rept for May 1999 for River Bend Station, Unit 1.With RBG-45016, Monthly Operating Rept for Apr 1999 for River Bend Station, Unit 1.With1999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for River Bend Station, Unit 1.With ML20206A2111999-04-21021 April 1999 Safety Evaluation Authorizing Pump Relief Request PRR-001 & Valve Relief Request VRR-001 & Denying Valve Relief Request VRR-002 RBG-44969, Monthly Operating Rept for Mar 1999 for River Bend Station, Unit 1.With1999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for River Bend Station, Unit 1.With ML20205S0601999-03-31031 March 1999 Rept on Status of Public Petitions Under 10CFR2.206 with Status Change from Previous Update,990331 ML20205D5481999-03-26026 March 1999 SER Accepting Util Proposed Alternative to Exam Weld AA with Weld Volume Coverage of 62 Percent for First 10-year Insp Interval Pursuant to 10CFR50.55a(a)(3)(ii) & 10CFR50.55a(g)(6)(ii)(A)(5) RBG-44930, Monthly Operating Rept for Feb 1999 for River Bend Station, Unit 1.With1999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for River Bend Station, Unit 1.With RBG-44826, Monthly Operating Rept for Dec 1998 for River Bend Station Unit 1.With1998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for River Bend Station Unit 1.With ML20198K2701998-12-22022 December 1998 Rev 1 to RBS Cycle 8 Colr RBG-44773, Monthly Operating Rept for Nov 1998 for River Bend Station, Unit 1.With1998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for River Bend Station, Unit 1.With RBG-44727, LER 98-S01-00:on 981021,identified That Contract Employee with Temporary Access Authorization Failed to Disclose Complete Criminal & Employment History.Individual Denied Access to Plants for Five Years.With1998-11-17017 November 1998 LER 98-S01-00:on 981021,identified That Contract Employee with Temporary Access Authorization Failed to Disclose Complete Criminal & Employment History.Individual Denied Access to Plants for Five Years.With ML20195C4841998-11-0606 November 1998 SER Accepting QA Program Change to Consolidate Four Existing QA Programs for Arkansas Nuclear One,Grand Gulf Nuclear Station,River Bend Station & Waterford 3 Steam Electric Station Into Single QA Program ML20155H3491998-11-0303 November 1998 Safety Evaluation Granting Requests for Relief RR2-0001, RR2-0002 & RR2-0003 RBG-44719, Monthly Operating Rept for Oct 1998 for River Bend Station, Unit 1.With1998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for River Bend Station, Unit 1.With ML20155C1351998-10-26026 October 1998 Rev B to Entergy QA Program Manual RBG-44677, Monthly Operating Rept for Sept 1998 for River Bend Station, Unit 1.With1998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for River Bend Station, Unit 1.With ML20154E2171998-09-28028 September 1998 Follow-up Part 21 Rept Re Defect with 1200AC & 1200BC Recorders Built Under Westronics 10CFR50 App B Program. Westronics Has Notified Bvps,Ano & RBS & Is Currently Making Arrangements to Implement Design Mods ML20151S5421998-09-0303 September 1998 Safety Evaluation Opposing Licensee Thermal Model as Currently Implemented.Evaluation Recommended to Be Used in Any follow-up Site Insp RBG-44629, Monthly Operating Rept for Aug 1998 for River Bend Station, Unit 1.With1998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for River Bend Station, Unit 1.With ML20236X2351998-08-0505 August 1998 Part 21 Rept Re Defect Associated W/Westronics 1200AC & 1200BC Recorders Built Under Westronics 10CFR50,App B Program.Beaver Valley,Arkansas Nuclear One & River Bend Station Notified.Design Mod Is Being Developed RBG-44600, Monthly Operating Rept for July 1998 for River Bend Station1998-07-31031 July 1998 Monthly Operating Rept for July 1998 for River Bend Station RBG-44564, Monthly Operating Rept for June 1998 for River Bend Station, Unit 11998-06-30030 June 1998 Monthly Operating Rept for June 1998 for River Bend Station, Unit 1 ML20249A6431998-06-12012 June 1998 SER Accepting 980427 Request for Change to River Bend QA Manual Program Description,Per 10CFR50.54(a)(3) RBG-44539, Monthly Operating Rept for May 1998 for River Bend Station, Unit 11998-05-31031 May 1998 Monthly Operating Rept for May 1998 for River Bend Station, Unit 1 RBG-44501, Monthly Operating Rept for Apr 1998 for River Bend Station, Unit 11998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for River Bend Station, Unit 1 ML20217M8951998-04-30030 April 1998 QA Program Manual ML20217P8281998-04-0707 April 1998 Safety Evaluation Accepting Relief Authorization for Alternative to Requirements of ASME Section Xi,Subarticle IWA-5250 Bolting Exam for Plants,Per 10CFR50.55a(a)(3)(i) RBG-44458, Monthly Operating Rept for Mar 1998 for River Bend Station, Unit 11998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for River Bend Station, Unit 1 RBG-44423, Monthly Operating Rept for Feb 1998 for River Bend Station Unit 11998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for River Bend Station Unit 1 ML20203L6631998-02-11011 February 1998 Rev 0 to River Bend Station,1998 Emergency Preparedness Exercise RBG-44385, Monthly Operating Rept for Jan 1998 for River Bend Station, Unit 11998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for River Bend Station, Unit 1 RBG-44353, Monthly Operating Rept for Dec 1997 for River Bend Station, Unit 11997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for River Bend Station, Unit 1 RBG-44460, Forwards Annual Radiological Environmental Operating Rept, for Period Jan-Dec 19971997-12-31031 December 1997 Forwards Annual Radiological Environmental Operating Rept, for Period Jan-Dec 1997 ML20203H9891997-12-12012 December 1997 Part 21 Rept Re Potential Manufacturing Defect of Enterprise DSR-4 & DSRV-4 Edgs.Cooper Energy Svcs Supplied 1A-7840 Adjusting Screw to Affected Utils & Sites.River Bend Station Replaced W/Acceptable Assemblies ML20202E9941997-12-0101 December 1997 ISI Plan Second Ten-Yr Interval (Dec 1,1997-Nov 30,2007) ML20199K9741997-11-30030 November 1997 Brief Aerial Photography Analysis of RBS at St Francisville,LA:1996-1997 RBG-44337, Monthly Operating Rept for Nov 1997 for River Bend Station, Unit 11997-11-30030 November 1997 Monthly Operating Rept for Nov 1997 for River Bend Station, Unit 1 ML20202F0191997-11-28028 November 1997 Safety Evaluation Approving Transfer of License NPF-47 for River Bend Station,Unit 1 ML20199H3711997-11-19019 November 1997 SER Accepting Approving Request Relief from Requirements of Section XI, Rule for Inservice Insp of NPP Components, of ASME for Current or New 10-year Inservice Insp Interval IAW 50.55(a)(3)(i) of 10CFR50 RBG-44295, Monthly Operating Rept for Oct 1997 for River Bend Station Unit 11997-10-31031 October 1997 Monthly Operating Rept for Oct 1997 for River Bend Station Unit 1 RBG-44243, LER 97-S03-00:on 970911,contract Employee Was Granted Temporary Access After Failing to List Prior Employment Termination & Access Denial.Caused by Employee Failure to Provide Accurate Info.Updated Info Re Employee1997-10-13013 October 1997 LER 97-S03-00:on 970911,contract Employee Was Granted Temporary Access After Failing to List Prior Employment Termination & Access Denial.Caused by Employee Failure to Provide Accurate Info.Updated Info Re Employee 1999-09-09
[Table view] |
Text
__-______
Ent:rgy operctions,Inc.
River Font 10tatr;n 5485 il S H 9 hway 61
- &~~) ro aci. m niergy ww-r.. w4 cas se Rick J King o..u u N 3C 4 W $3f oty & NeQJIdhFy AH&49 September 11,1997 U.S. NRC Document Control Desk, OF1 17 Washington, D.C. 20555
Subject:
River Bend Station Unit 1 Docket No. 50-458 License No. NPF-47 Safeguards Event Report 50-458/97 S02-00 File Nos. 09.5, G9.25.1.3 RBG-44204 RBF197-0336 Ladies and Gentlemen:
In accordance with 10CFR73.71(b)(1), enclosed is the subject security event report.
Sincerely, p1 -=
IUK/WJF/mbp enclosure L
1 rl ? (' l' G 9709170196 970911 PDR ADOCK 05000458 S PM _
Safeguards Event Report 50-458/97.S02 00 Septernber 11,1997 '
RilO-44204 RilF197 0336 Page 2 of 2 i
- cc: U. S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 400 Arlington.TX 76011 l- NRC Sr. Resident inspector P. O. Box 1050 St. Francisville, LA 70775 INPO Records Center 700 Galleria Parkway Atlanta, GA 30339-3064 l Mr. Glenn Dishong Public Utility Commission of Texas 1701 N. Congress Ave.
Austin. TX 78711 3326 Louisiana Department of Environmental Quality Radiation Protection Division P.O.130x 82135 11aton Rouge, LA 70884 2135-ATTN: Administrator
'k l
f
NRCf ORM 364 U.S NUCLEAR REGULATORY COMMISS6ON
. (sMi APPROVED BY OMB NO. 31604)104 EXPIRES 04/30/98 LICENSEE EVENT REPORT (LER) Ws'a'qi?g'[&,!Msi'.PJWs"WaWM!pl
^
h T U $ ~ 6 % d E n ly[",$t 3 j $ Y!g y (See reverse for required number of digits / characters for each block)
Q ,b g g fy y g a g g g 5pg v g H' g g g ffi MAWENbNokUmu wAssNotoN ocM YXt'!LTfr Nm m -i avma m rm m River Bend Station 05000 4 58 1 of 2 inuuo Contract Employee Failed to 1.ist Prior Employment TermirYation And Was Gran;ed Temporary Access EVENT DATE (5) LER NUmm (5) ntruni DATE (7) wun m PAY TLM TLAR 51 H MUN T H DAT OTHEM FACILiista INVOLVED (5)
YLAR I ALEHT lWAL puvu 1 NUldpL R N/A 05000 07 17 97 97 - 502 - 00 09 11 97 F ALLUT NAML MM I NN H N/A 05000 gp j THI5 ncruni I5 56-,1 itu PUI 15UANT ID THE REQUI ttutNT5 QF 10 be n j; (Ghe(A one or true) (11) 20 2201(b) 20 UQ3(aKZ)(v) 50 73(aX2)(i) 50 73(a)(2)(viii) uwA 090 20 22o3(a)(1) 20 2203(ex3xi) so 73(ex2)(n) so 73(a)(2Xx) 20 up3(a)(2)(i) 20 RQ3(aX3)(li) 50 73(sXZXm) X 73 71 20 2203(ax2Xh) 20 2203(aK4) so 73(a)(2Xiv) OTHER
~
20 44WJ(aK2Xiii) 50 35(c)(1) 50 73(a)(4Xv) SDe b sci ow 20 4tv4(a)(ZXiv) 50 35(c)(2) 50=73(a)(2)(vii)
Lr,tN5th GONTACT r UM TH15 LER (12)
NAML TELL FHUNE NUMULM ptiude Alea gode)
D. N. Lorfing, Supervisor Licensing 504 381-4157 cubt suitu Gv-r tit ONE LINE L Usevra.Ni FUM EACH GUMFONENT FAILUME vt:burmu IN THI5 neroMI (13)
MANUF AGTUIRR < L 4AVEL &Tb1LM GBAFUNL NI MANUI AGTURIR H v I 5 JPPLeutNTA L nervMT uruvi tu (14) ur tu i tu MONTH DA( YEAR SUBMISSION YE5 DATE (15)
(if yes, complete EXPECTED SUBMISSION DATE)- X NO As 5IMAGT (Limit to 1400 spaces. i e , approximately 15 Single-spaced typewritten hnes) (15)
On September 5,1997, with the plant in mode 1 at 90% power, River Bend Station (RBS) received background investigation results on a contract employee which reflected termination from a prior employer due to positive drug test results. The individual had been granted temporary unescorted access on July 17,1997, in accordance with RBS procedures. This discrepancy is reportable pursuant to 10CFR73.71(b)(1),
immediate actions included deletion of the employee's key card. The contract em ployee was interviewed and stated that the information was not disclosed because the employee felt unescorted access would be denied. The cause of this event was incomplete information provided by the employee RBS programs and procedures functioned as expected in detecting and resolving this issue.
During the time in which the employee had access to the RBS protected Area, primary responsibilities included building a tool trailer and inventorymg tools. A check of the employce's keycard access history showed no entry to vital areas of the plant. Therefore, this condition had no safety sigmficance.
C . _ .. . . . .. - - . . . . -
Nac tonM mA u.s. NUCLEAR REGULATORY COMMIS&lON on>
LICENSEE EVENT REPORT (LER)
TEXT CONTINUATION FACILITY NAME (1) DOCKET LEN NUMBER (6) PAGE (3)
River Bend Station 05000 4 58 a MMP TJ,5 97 - S02 - 00 2 of 2 BACKGROUND On July 17,1997, a contract employee was granted temporary unescorted access, based upon satisfactorily completing the initial RUS access processing requirements. The RBS process for granting temporary access includes among other things an employment check for the last year, a credit check, identity verification through one photo identification (e.g. driver's lleense), and passing a psychological evaluation. The primary i responsibilities of the contract employee included construction of a tool trailer and inventory of tools. The trailer and tools are to be used on the Turbine floor during the upcoming refueling outage, scheduled to begin on l September 12th. l l
l REPORTED CONDITION On September 5,1997, with the plant at 90% power in mode 1 (power operation), RBS received background investigation results for the contract employee which tellected termination from a prior employer due to positive drug test results. The employee's access was immediately deleted. This event is reportable pursuant to 10CFR73.7)(b)(1).
INVESTIGATION The individual was on site when the background investigation results were received on September 5th and was brought in and inteniewed. During the interview, the employee stated the information was not disclosed because the employee felt that unescorted access would be denied. The individual's access to RBS has been removed.
ROOT CAUSE The cause for this event was the contract employee's failure to provide accurate and complete infonnation.
CORRECTIVE ACTIONS TO PREVENT RECURRENCE RBS programs and procedures functioned as expected. No actions are necessary to prevent recurrence.
SAFETY ASSESSMENT During the time in which the employee had access to the RBS Protected Area, responsibilities included building a tool trailer and inventorying tools. A check of the employee's keycard access history showed no entry to vital areas of the plant. Therefore, this condition had no safety significance.