| Title | Failure to Specify and Maintain Safety-Related Quality Standards and Materials Essential for Reactor Core Isolation Cooling |
| Description | The team identified a Green non-cited violation of Title 10 of the Code of Federal Regulations (CFR), Part 50, Appendix B, Criterion III, Design Control, for the failure to classify and maintain reactor core isolation cooling (RCIC) system components as safety-related as specified by Updated Final Safety Analysis Report Table 3.2-1 and Section 7.1.1. Specifically, although Talen, the operator of Susquehanna Steam Electric Station, classified the RCIC system as safety-related, this classification did not extend to the Unit 1 and Unit 2 RCIC barometric condenser relief valves. The team determined failure of the non-safety related barometric condenser relief valves could result in a loss of RCIC lube oil cooling and failure of RCIC to perform its design basis safety function. Talen entered the issue into the corrective action program as condition report 2016-23615 and performed an immediate operability determination, which concluded RCIC remained operable. The finding was more than minor because it was associated with the Design Control attribute of the Mitigating Systems cornerstone, and adversely affected the cornerstone objective of ensuring the availability, reliability, and capability of systems that respond to initiating events to prevent undesirable consequences. The team evaluated this finding using IMC 0609, Attachment 4, Initial Characterization of Findings, and IMC 0609, Appendix A, The Significance Determination Process for Findings At-Power, Exhibit 2 - Mitigating System Screening Questions. The team determined the finding screened as very low safety significance (Green), because the finding was a design deficiency which did not result in an actual loss of functionality of the RCIC system. This finding was not assigned a cross-cutting aspect because the performance deficiency occurred during original plant design and did not reflect current licensee performance. |
| Site: | Susquehanna |
|---|---|
| Report | IR 05000387/2016007 Section 1R21 |
| Date counted | Dec 31, 2016 (2016Q4) |
| Type: | NCV: Green |
| cornerstone | Mitigating Systems |
| Identified by: | NRC identified |
| Inspection Procedure: | IP 71111.21 |
| Inspectors (proximate) | C Baron D Kern F Arner G Crespo J Brand M Gray N Floyd S Kobylarz |
| Violation of: | 10 CFR 50 Appendix B 10 CFR 50 Appendix B Criterion III, Design Control |
| INPO aspect | |
| ' | |