05000387/FIN-2016002-03
From kanterella
Jump to navigation
Jump to search
Finding | |
---|---|
Title | Failure of B EDG to Reach Rated Frequency within 10 Seconds |
Description | A self-revealing finding of very low safety significance (Green) and associated NCV of TS 5.4.1.a, Procedures, was identified when Susquehanna failed to implement procedures for loading EDGs promptly following extended unloaded operation. Specifically, Susquehanna did not load the B EDG promptly following over 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> of unloaded operation which resulted in the slow starting time during the subsequent surveillance test due to insufficient fuel delivery caused by clogged fuel injectors. The failure was entered into the CAP as CR-2016-13220 and the EDG was run loaded for an extended period to ensure any unburned fuel had been removed from the machine. The finding was more than minor because it was associated with the Equipment Performance attribute of the Mitigating Systems Cornerstone and affected the objective to ensure the reliability of systems that respond to initiating events to prevent undesirable consequences (i.e. core damage). Specifically, the failure to load the B EDG following extended operation unloaded resulted in the slow starting time of the EDG during subsequent surveillance testing due to clogged fuel injectors. The inspectors evaluated the finding in accordance with Exhibit 2 of IMC 0609, Appendix A, The SDP for Findings At-Power, dated June 19, 2012 and determined that it was of very low safety significance (Green) because it did not affect the design or qualification of the EDG, did not represent a loss of system function, and did not represent a loss of a single train for greater than its TS allowed outage time. The finding is related to the cross-cutting area of Human Performance, Consistent Process, because Susquehanna did not use a consistent, systematic approach to make decisions which incorporated risk insights. Specifically, Susquehanna did not appropriately coordinate the loaded run of the B EDG with maintenance on the C EDG to ensure B EDG availability was not unnecessarily challenged. |
Site: | Susquehanna |
---|---|
Report | IR 05000387/2016002 Section 1R22 |
Date counted | Jun 30, 2016 (2016Q2) |
Type: | NCV: Green |
cornerstone | Mitigating Systems |
Identified by: | Self-revealing |
Inspection Procedure: | IP 71111.22 |
Inspectors (proximate) | C Graves D Schroeder E Gray J Grieves L Dumont N Embert P Meier T Daun |
Violation of: | Technical Specification - Procedures |
CCA | H.13, Consistent Process |
INPO aspect | DM.1 |
' | |