Description | The inspectors identified a Green NCV of TS 5.4.1, Procedures, because PPLs emergency operating procedure step for terminating injection sources during a rapid depressurization required for an anticipated transient without scram (ATWS) was inadequate to ensure that cold unborated water was not injected into the core. Specifically, PPLs emergency operating procedure (EOP) does not terminate injection from the high pressure coolant injection (HPCI) system during the transient and procedural guidance is insufficient to ensure that operators will maintain level in the prescribed ATWS band while injecting with HPCI. In addition to entering the issue into the CAP as CRs 1708885 and 1745775, PPLs immediate corrective actions included issuance of Operations Directive 13-02 which states that HPCI must be controlled, up to and including overriding injection, to ensure that reactor pressure vessel water level is maintained in the prescribed ATWS band during the duration of the rapid depressurization. Planned corrective actions include requiring termination of HPCI injection prior to initiation of a rapid depressurization (Action Request 1719605). The performance deficiency is more than minor because it was associated with the procedure quality attribute of the Mitigating Systems cornerstone and affected the objective to ensure the availability, reliability and capability of systems that respond to initiating events to prevent undesirable consequences (i.e., core damage). Specifically, the inadequate procedure for terminating injection prior to rapidly depressurizing the reactor during an ATWS could have resulted in operators failing to control level in the prescribed EOP band, potentially resulting in cold unborated water being injected into the core. In accordance with IMC 0609.04, Initial Characterization of Findings, and Exhibit 2 of IMC 0609, Appendix A, The Significance Determination Process for Findings At-Power, the inspectors determined that this finding is of very low safety significance (Green) because the performance deficiency was not a design or qualification deficiency, did not involve an actual loss of safety function, did not represent actual loss of a safety function of a single train for greater than its Technical Specification (TS) allowed outage time, and did not screen as potentially risk-significant due to a seismic, flooding, or severe weather initiating event. The finding is related to the cross-cutting area of problem identification and resolution (PI&R), in that PPL did not identify a performance issue completely, accurately, and in a timely manner commensurate with the safety significance. Specifically, PPL failed to identify that guidance in EOP basis document was insufficient to ensure that operators maintained level in the EOP band. |
Site: | Susquehanna ![]() |
---|---|
Report | IR 05000387/2013004 Section 1R11 |
Date counted | Sep 30, 2013 (2013Q3) |
Type: | NCV: Green |
cornerstone | Mitigating Systems |
Identified by: | NRC identified |
Inspection Procedure: | IP 71111.11 |
Inspectors (proximate) | J Greives A Turilin K Mangan S Kennedy J Laughlin P Finney F Bower E Burket |
Violation of: | Technical Specification - Procedures Technical Specification |
CCA | P.1, Identification |
INPO aspect | PI.1 |
' | |