| | Q | CCA | Title |
|---|
| 05000387/FIN-2012004-03 | 2012Q3 | H.5 | Failure to Implement Risk Management Actions |
| 05000387/FIN-2012004-02 | 2012Q3 | H.13 | Inadequate Troubleshooting Results in Loss of Secondary Containment and Protected Equipment |
| 05000387/FIN-2012004-01 | 2012Q3 | P.1 | Inadequate Procedure for Acts of Nature |
| 05000387/FIN-2012009-01 | 2012Q3 | H.8 | Inadequate Compensatory Actions for Inadequate MOV Grease Analysis Procedures |
| 05000387/FIN-2012009-02 | 2012Q3 | P.2 | Failure to Identify and Correct a CAQ Associated with a SAFETY-RELATED Battery Maintenance Procedure |
| 05000387/FIN-2012009-03 | 2012Q3 | P.3 | Failure to Identify and Correct a CAQ Associated with Reactor Recirculation Valve Exercising Surveillance Procedure |
| 05000387/FIN-2012005-05 | 2012Q4 | | Concerns Regarding Ppls Program for Conducting Biennial Medical Examinations for Licensed Operators and Reporting Changes in Medical Conditions |
| 05000387/FIN-2012005-01 | 2012Q4 | P.2 | FAILURE TO DEMONSTRATE EFFECTIVE PREVENTIVE MAINTENANCE UNDER 50.65(a)(2) |
| 05000387/FIN-2012005-03 | 2012Q4 | P.1 | Failure of FULL-SCALE Drill Critique to Identify an RSPS Weakness |
| 05000387/FIN-2012005-04 | 2012Q4 | | Improper Stress Intensification Factor Results in RCS Pressure Boundary Leak |
| 05000387/FIN-2012007-01 | 2012Q4 | | Adequacy of Secondary Containment and Standby Gas Treatment System Testing |
| 05000387/FIN-2012005-06 | 2012Q4 | | Failure to Make a Timely Report for a Valid Actuation of RPS |
| 05000387/FIN-2012005-02 | 2012Q4 | | Failure to Report COMMON-CAUSE Inoperability of Independent Trains |
| 05000388/FIN-2013007-01 | 2013Q1 | H.5 | Failure to Maintain Adequate Feedwater Procedures |
| 05000387/FIN-2013002-05 | 2013Q1 | | Inadequate Procedure for Control Room Cooling Fan Train Failure |
| 05000387/FIN-2013002-04 | 2013Q1 | H.10 | Inaccurate Uswc PI Data Submittal |
| 05000387/FIN-2013002-03 | 2013Q1 | | Inadequate 10 CFR 50.59 Screening of TS Bases Change |
| 05000387/FIN-2013002-02 | 2013Q1 | H.12 | Inadequate Restoration from Clearance Order Results in Degradation of Main Condenser Vacuum and Plant Downpower |
| 05000387/FIN-2013002-01 | 2013Q1 | H.2 | Cumbustible Storage in Restricted Areas Without Approval |
| 05000388/FIN-2013007-03 | 2013Q1 | P.1 | Failure to Implement the Corrective Action Process |
| 05000388/FIN-2013007-02 | 2013Q1 | H.7 | Failure to Establish and Implement Written Procedures for Operating Plant Equipment |
| 05000387/FIN-2013003-04 | 2013Q2 | | Implementation of Enforcement Guidance Memorandum (EGM) 11-003, Revision 1 |
| 05000387/FIN-2013403-01 | 2013Q2 | H.14 | Security |
| 05000387/FIN-2013013-02 | 2013Q2 | | Failure to Follow RCA Egress Requirements |
| 05000387/FIN-2013013-01 | 2013Q2 | | Unauthorized Movement of a High Radiation Area Boundary |
| 05000387/FIN-2013008-02 | 2013Q2 | P.2 | Failure to Establish and Implement Written Procedures for Operating Plant Equipment Failure to Provide Complete and Accurate Medical Information for Licensed Operator Applications |
| 05000387/FIN-2013008-01 | 2013Q2 | P.2 | Failure to Restrict Operators from Performing Licensed Duties with Medically Disqualifying Conditions and Failure to Notify the NRC within 30 Days of Discovering Changes in Medical Conditions |
| 05000387/FIN-2013003-03 | 2013Q2 | P.3 | Inadequate Procedure to Control and Monitor RCS Heatup Rate |
| 05000387/FIN-2013003-02 | 2013Q2 | P.3 | Unacceptable Preconditioning of RPS and EOC-RPT Time Response Test |
| 05000387/FIN-2013003-01 | 2013Q2 | P.2 | Inadequate Operability Assessment of Synchroscope Switch |