05000361/LER-1982-140, Forwards LER 82-140/03L-0.Detailed Event Analysis Submitted

From kanterella
Jump to navigation Jump to search
Forwards LER 82-140/03L-0.Detailed Event Analysis Submitted
ML20069P138
Person / Time
Site: San Onofre Southern California Edison icon.png
Issue date: 11/24/1982
From: Ray H
SOUTHERN CALIFORNIA EDISON CO.
To: Engelken R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
Shared Package
ML20069P140 List:
References
82-425, NUDOCS 8212070369
Download: ML20069P138 (2)


LER-2082-140, Forwards LER 82-140/03L-0.Detailed Event Analysis Submitted
Event date:
Report date:
3612082140R00 - NRC Website

text

'

flECE ~O 1:no Southern California Edison Company S AN ONOFRE NUC LE AR GENFR A TING ST A TION cy p WO y

S AN C LEMEN T C. C A LIF OR NI A 92672

$7 ATION M AN AGE R 173414,2F700 November 24, 1982 l

U. S. Nuclear Regulatory Co.nmission Office of Inspection and Enforcement Region V 1450 Maria Lane, Suite 210 Walnut Creek, California 94596-5368 Attention: Mr. R. H. Engelken, Regional Administrator

Dear Sir:

Subject:

Docket No. 50-361 30-Day Report Licensee Event Report No.82-140 San Onofre Nuclear Generating Station, Unit 2 This submittal is in accordance with the reporting requirements of Section 6.9.l.13b of Appendix A to Facility Operating License NPF-10. It describes a reportable occurrence involving Limiting Condition for Operation (LCO) 3.3.1 associated with the Reactor Protection System (RPS). A completed copy of LER 82-140 is enclosed.

While in Mode 1 and operating at 20%, on October 26, 1982, operator inspection revealed a mismatch in power indication between Channel B and Channels A, C and D, indicating a failure of circuitry associated with Channel B power calculation. Since this circuitry provides input for calculation of Channel B Linear Power Density (LPD) and Departure from Nucleate Boiling Ratio (DNBR), Channel B LPD and DNBR were declared inoperable at 1451 and the Action Statement associated with LC0 3.3.1 was invoked. As required by this Action Statement (Table 3.3-1, Action 2), Channel B LPD and DNBR were put in the bypassed condition within one hour.

Subsequent investigation revealed that the problem was attributable to the gain setting drift in the linear amplifier that processes the lower excore signal for the Channel B Core Protection Calculator (CPC). The g2070369821124 s ADOCK 05000361 PDR f6 M 82 'IAS

9 v

R. H. Engelken November 24,1982 printed circuit board containing the amplifier was replaced and Channel B LPD and DNBR were declared operable in accordance with S023-3-3.25 at 2012 on October 25, 1982.

As a result of our investigation, this has been detennined to be an isolated event and no other corrective action is planned at this time.

Sint. the RPS contains 4 channels for determination of high LPD and low DNBR and only 3 channels (all of which remained functional throughout the event) are required for operability, there was no impact on health and safety of plant personnel or the public.

If there are any questions regarding the above, please contact me.

Sincerely,

/

Enclosure:

LER 82-140 cc: A. E. Chaffee (USNRC Resident Inspector, San Onofre Unit 2)

U. S. Nuclear Regulatory Commission Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Office of Management Information and Program Control Institute of Nuclear Power Operations l