05000361/LER-1982-132, Forwards LER 82-132/03L-0.Detailed Event Analysis Submitted

From kanterella
Jump to navigation Jump to search
Forwards LER 82-132/03L-0.Detailed Event Analysis Submitted
ML20069P163
Person / Time
Site: San Onofre Southern California Edison icon.png
Issue date: 11/19/1982
From: Ray H
SOUTHERN CALIFORNIA EDISON CO.
To: Engelken R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
Shared Package
ML20069P166 List:
References
NUDOCS 8212070379
Download: ML20069P163 (2)


LER-2082-132, Forwards LER 82-132/03L-0.Detailed Event Analysis Submitted
Event date:
Report date:
3612082132R00 - NRC Website

text

-

? QED ucc Southern California Edison Company ..

S k" S AN ONOFRE NUC LE A R GENER A TING S T A TION f, P.O. B O X 128 h S AN C LEMEN TE. C A LIF ORNI A 92672 H. B. R AY Ehgg/j ,

November 19, 1982 %y,t,,noy, an-"a U. S. Nuclear Regulatory Commission Office of Inspection and Enforcement Region V 1450 Maria Lane, Suite 210 Walnut Creek, California 94596-5368 Attention: Mr. R. H. Engelken, Regional Administrator

Dear Sir:

t

Subject:

Docket No. 50-361 30-Day Report Licensee Event Report No.82-132 San Onofre Nuclear Generating Station, Unit 2 This submittal is in accordance with the reporting requirements of Section 6.9.1.13b of Appendix A to Facility Operating License NPF-10.

It describes a reportable occurrence involving Limiting Condition for Operation (LCO) 3.3.4 associated with the Turbine Overspeed Protection System (T0PS). A completed copy of LER 82-132 is enclosed.

While in Mode 1, on October 23, 1982, turbine generator voltage regulator testing in accordance with Startup Procedure 2PA-611-01 was in progress.

Due to failure of turbine stop valve 2VV-2200E to close fully, the valve was declared inoperable at 1545 and LC0 3.3.4 Action Statement a was invoked. As required by this Action Statement, the valve was secured in its closed position, isolating the turbine from the affected steam lead.

The inability of the valve to close fully was investigated and the problem was identified as failure of the electro-hydraulic servo-mechanism which controls the actuation of the valve. This assembly was replaced and the valve was declared operable in accordance with S023-3-3.34 at 1355 on October 24, 1982.

8212070379 821119 PDR ADOCK 05000361 S PDR MA

$2 -4%L

R. H. Engelken November 19, 1982 This was an isolated event and no other corrective action is warranted at this time.

Since the turbine was immediately isolated from the affected steam lead, there was no impact on the health and safety of plant personnel or the public.

If there are any questions regarding the above, please contact me.

Sincerely, HD $ /rY % 4 l

Enclosure:

LER 82-132 cc: A. E. Chaffee (USNRC Resident Inspector, San Onofre Unit 2)

U. S. Nuclear Regulatory Commission Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Office of Management Information and Program Control Institute of Nuclear Power Operations.