| Q | CCA | Title |
---|
05000282/FIN-2015001-03 | 2015Q1 | P.2 | Untimely Resolution of Environmental Qualification Issues |
05000282/FIN-2015001-02 | 2015Q1 | H.5 | Failure to Follow Foreign Material Exclusion Procedure during Reactor Coolant Pump Seal Replacement |
05000306/FIN-2015001-01 | 2015Q1 | H.4 | Failure to Perform Immediate Operability Determination for 14 CFCU as Required by Procedure |
05000282/FIN-2015002-03 | 2015Q2 | | Failure to Make an 8-Hour Report Required by 10 CFR 50.72(b)(3)(ii)(B) |
05000282/FIN-2015002-04 | 2015Q2 | | Design Control Measures not Implemented to Ensure Group E Pressurizer Heaters Remain Operational Post-Fire |
05000282/FIN-2015002-02 | 2015Q2 | P.3 | Failure to Correct #12 Battery Nonconformance |
05000282/FIN-2015002-01 | 2015Q2 | |
- 12 Battery Charger Design Control
|
05000282/FIN-2015007-01 | 2015Q3 | H.1 | 4160 Vac Switchgear Preventive Maintenance Procedure Failed to Provide Adequate Resistance Values and Acceptance Criteria |
05000282/FIN-2015007-02 | 2015Q3 | | Inadequate Calculations for Motor-Operated Valve Thermal Overload Relays |
05000282/FIN-2015007-03 | 2015Q3 | | Replacement Containment Fan Cooling Unit Component Not Designed in Accordance with ASME Section III |
05000282/FIN-2015003-01 | 2015Q3 | H.13 | Failure to Determine Compensatory Measures |
05000282/FIN-2015003-02 | 2015Q3 | H.11 | Improper Operability Determination |
05000282/FIN-2015008-03 | 2015Q4 | | Failure to Establish Procedures to Verify RHR is Full of Water Following Maintenance Outages |
05000282/FIN-2015008-05 | 2015Q4 | H.12 | Failure to Identify a Continuous Gas Intrusion into RHR |
05000282/FIN-2015008-04 | 2015Q4 | | Failure to Manage Potential Gas Accumulation Due to SI Isolation Check Valve Leakage Following Maintenance Outages |
05000306/FIN-2015004-01 | 2015Q4 | H.1 | Failure to Meet ANSI N14.6 Section 5.3.1 Requirements |
05000282/FIN-2015008-02 | 2015Q4 | | Failure to Manage Gas Accumulation at the RHR Train Credited for Emergency Core Cooling in MODE 4 |
05000306/FIN-2015008-01 | 2015Q4 | P.2 | Failure to Correct an NCV Associated with Inadequate Gas Monitoring of Inaccessible RHR Gas Susceptible Locations |
05000282/FIN-2015004-02 | 2015Q4 | | Failure to Adequately Calibrate Liquid Effluent Monitors |