| Q | CCA | Title |
---|
05000306/FIN-2014004-01 | 2014Q3 | H.4 | Failure to Perform Operability Determination as Required by Procedure |
05000282/FIN-2014004-02 | 2014Q3 | H.1 | Failure to have Adequate Procedures to Address Low Bus Voltage Conditions |
05000282/FIN-2014004-03 | 2014Q3 | | D1 EDG Reverse Power Trip |
05000282/FIN-2014005-01 | 2014Q4 | H.14 | Failure to Implement the Winter Plant Operation Procedure |
05000282/FIN-2014005-03 | 2014Q4 | H.12 | Failure to Follow Procedures during EDG 24 Hour Load Test |
05000282/FIN-2014406-01 | 2014Q4 | | Security |
05000282/FIN-2014005-02 | 2014Q4 | H.2 | Unqualified Reactor Vessel Examination Procedures |
05000306/FIN-2015001-01 | 2015Q1 | H.4 | Failure to Perform Immediate Operability Determination for 14 CFCU as Required by Procedure |
05000282/FIN-2015001-02 | 2015Q1 | H.5 | Failure to Follow Foreign Material Exclusion Procedure during Reactor Coolant Pump Seal Replacement |
05000282/FIN-2015001-03 | 2015Q1 | P.2 | Untimely Resolution of Environmental Qualification Issues |
05000282/FIN-2015002-01 | 2015Q2 | |
- 12 Battery Charger Design Control
|
05000282/FIN-2015002-02 | 2015Q2 | P.3 | Failure to Correct #12 Battery Nonconformance |
05000282/FIN-2015002-04 | 2015Q2 | | Design Control Measures not Implemented to Ensure Group E Pressurizer Heaters Remain Operational Post-Fire |
05000282/FIN-2015002-03 | 2015Q2 | | Failure to Make an 8-Hour Report Required by 10 CFR 50.72(b)(3)(ii)(B) |