| Q | CCA | Title |
---|
05000260/FIN-2013002-02 | 2013Q1 | H.12 | Failure to Follow Operating Procedure Guidance Resulted in Unit 2 Reactor Scram |
05000259/FIN-2013002-01 | 2013Q1 | H.5 | Failure to Implement Preventive Maintenance Program |
05000259/FIN-2013003-01 | 2013Q2 | H.5 | Failure to Implement Preventive Maintenance Program |
05000259/FIN-2013003-03 | 2013Q2 | | Residual Heat Removal (RHR) Heat Exchanger (HX) excessive fouling |
05000259/FIN-2013003-02 | 2013Q2 | | LER 05000296/2013-003-00 and 05000259/2013-002-00 |
05000259/FIN-2013405-01 | 2013Q2 | | Security |
05000259/FIN-2013007-05 | 2013Q2 | | Security |
05000259/FIN-2013007-04 | 2013Q2 | P.2 | Failure to Adequately Identify, Evaluate, and Correct the EECW Strainers Degraded/Nonconforming Condition |
05000259/FIN-2013007-03 | 2013Q2 | | Failure to Use Worst Case 4160 VAC Bus Voltage in Design Calculations |
05000259/FIN-2013007-02 | 2013Q2 | | Failure to Evaluate the Effects of the Failure of Non-Class 1E Load Center Transformer Cooling Fans on the Class 1E 4160-480V Load Center Transformers and 480V Shutdown Boards |
05000259/FIN-2013007-01 | 2013Q2 | | Failure to Verify the Capability of HPCI to Achieve Required Flow and Pressure within 30 Seconds Under Accident Conditions |
05000259/FIN-2013011-16 | 2013Q2 | P.5 | Failure to Establish Qualified Ultrasonic Examination Procedures |
05000259/FIN-2013011-15 | 2013Q2 | P.1 | Deficient Design Control for RHR Service Water Freeze Protection |
05000259/FIN-2013011-14 | 2013Q2 | P.2 | Failure to Implement an Adequate Test Program for RHRSWS and EECS |
05000259/FIN-2013011-12 | 2013Q2 | H.7 | Deficient Acceptance Criteria for Main Battery Bank 1 |
05000259/FIN-2013011-02 | 2013Q2 | H.5 | Failure to Follow Procedure during Implementation of Plant Modifications to the Residual Heat Removal and Core Spray Systems |
05000259/FIN-2013011-03 | 2013Q2 | H.13 | Failure to Perform 10 CFR 50.59 Evaluation Intergranular Stress Corrosion Cracking Examination on ASME Code Class 1 Piping Weld |
05000259/FIN-2013011-04 | 2013Q2 | H.12 | Two BFN Assistant Unit Operators Closed and Danger Tagged the A1 RHRSW Pump Manual Discharge Valve Instead of the Required A2 RHRSW Pump Discharge Valve |
05000259/FIN-2013011-05 | 2013Q2 | H.7 | Maintenance Personnel Not Following Clearance Procedure Violation |
05000259/FIN-2013011-06 | 2013Q2 | H.5 | Conduct of Operations Procedure Violation |
05000259/FIN-2013011-01 | 2013Q2 | H.14 | Failure to Perform Evaluation of Nonconforming Material during Commercial Grade Dedication of Safety-Related Bearings |
05000259/FIN-2013011-07 | 2013Q2 | H.8 | Failure to Adequately Implement Procedure 3-SR-3.3.8.2.1(B) |
05000259/FIN-2013011-08 | 2013Q2 | H.5 | Failure to Manage Emergent Risk Condition during A1 and A2 RHRSW Inoperability |
05000259/FIN-2013011-09 | 2013Q2 | H.8 | Failure to control a modification to the seismically mounted control room ceiling light diffusers |
05000259/FIN-2013011-10 | 2013Q2 | H.7 | Requirements for Concurrent Verification, Independent Verification, and Peer Checks |
05000259/FIN-2013011-11 | 2013Q2 | P.2 | Inadequate Corrective Actions to Address Programmatic Procedure Quality Issue |
05000259/FIN-2013011-13 | 2013Q2 | | Failure To Translate The Design Into Procedure 3-SR-3.3.8.2.1(B) |
05000259/FIN-2013004-04 | 2013Q3 | P.2 | Failure to Properly Screen and Classify Corrective Action Program, Problem Evaluation Reports |
05000259/FIN-2013004-02 | 2013Q3 | H.6 | Failure to Clean the Safety Related Pump Pit Once per Two Cycles |
05000259/FIN-2013004-01 | 2013Q3 | H.8 | Failure to enter Technical Specification for Residual Heat Removal Service Water Maintenance |
05000259/FIN-2013005-01 | 2013Q4 | H.8 | Failure to Document Service Water Freeze Protection Deficiencies |
05000259/FIN-2013005-05 | 2013Q4 | P.1 | Failure to Maintain Emergency Diesel Room Floor Drains |
05000260/FIN-2013005-06 | 2013Q4 | | Failure to report a condition prohibited by Technical Specifications |
05000259/FIN-2013005-02 | 2013Q4 | P.2 | Failure to Maintain Emergency Response Staffing Levels |
05000259/FIN-2013010-01 | 2013Q4 | | Inadequate Compensatory Actions to Minimize the Effects of Impaired Fire Protection Equipment on Fire Safe Shutdown |
05000259/FIN-2013010-02 | 2013Q4 | | Inadequate Evaluation of Combustible Material Control Fire Protection Program Change |
05000259/FIN-2013010-03 | 2013Q4 | | (SECURITY) Failure to Meet the Requirements of Large Fire and Explosion Mitigation Strategies |
05000259/FIN-2013005-03 | 2013Q4 | | Inaccurate Information Provided Concerning Onsite Emergency Response Organization Staffing Requirements |
05000259/FIN-2013005-04 | 2013Q4 | | Inappropriate Amendment of License Conditions |