:on 750519,analysis of Reactor Bldg Vent & Main Stack Charcoal & Particulate Filters for Wk of 750513-20 Revealed Release Rates of Halogens & Particulates Exceeding Tech Spec Limits by 23%
ML20206K665
Person / Time
Site: 05000000, Pilgrim
Issue date: 05/29/1975
From: Martin S, James Smith
BOSTON EDISON CO.
To:
Shared Package
ML20204E974 List:
References
FOIA-86-58 LER-75-014, LER-75-14, NUDOCS 8606300154
Download: ML20206K665 (3)


LER-1975-014, on 750519,analysis of Reactor Bldg Vent & Main Stack Charcoal & Particulate Filters for Wk of 750513-20 Revealed Release Rates of Halogens & Particulates Exceeding Tech Spec Limits by 23%
Event date:
Report date:
0001975014R00 - NRC Website

text

_

LICENSEE EVENT REPOFLT 75-14 J

CONTROL BtOCK:l[ lWRT" - PREVIOUS REPORT DATE {~ \\Y 20, 1975

" UPDATE l

l l

l l

(PLEASE PRmT ALL OLErulRE3 WFORMAT903 '

1 6

NAME LCENSE NUMBER YPE T

8 lMlAlPlPlSlIl lOl0l-l0lOlOlOlOl-l0l0l l 4 l 1 l1l1l 1l lOl1l 7 89 14 15 25 26 30 31 32 T7PE Wu i

CATEGOAV DOCKET NUM0ER EVENT DATE AEPOAT DATE

@ CON'T lM l T l lO l5 lO l-l 0 l Pl Ol 3l l Ol 5l 1l ol 'ii 5 l l Ol5 12 l9 17 l5 7 8 57 58 59 60 61 68 69 74 75 BC

EVENT DESCRIPTION

@B 1 l

l 7 89 An analysis of charcoal and particulate filters from the Beactor Building Vent anu 8c EE l the Main Staek for the one week reriod of May 13, through May PO,1975 revealed the l

7 89 release rates of halogens and particulates with half lives greater than eight days, eC II I released to' the environs a s rart of airborne effluents, exceeded the 1.mit set forth l 7 89 in PIIPS Technical Specification section 3.8.B.2 by approximately 23 percent.

80

$I l

7 89 80

@l (AO-75-6) " Airborne Effluents"

[

7 89 g,yg go 1

C E CODE COMPONENT CODE R

MANUFAC f A VIOLATON l

@ I rl 31 LaJ Izi zi zi zl viz i Izl Izl919191 lN I

]

7 89 10 11 12 17 43 44 47 48 j

CAUSE DESCRIPTION j

Dl l The main contributor to this event was radioactive airborne effluents from the l

l l

7 89 80 bl rahaste trocess buildinc ventilntion system.

l 7 89

[

80 DE I l

i 7 89 80 FACut y METHOO OF STAfus

% POWER OfHEA STATUS DISCOVERY DISCOVEAY CESCRPTION i

d lO l5 lO l l NA l d l

Routine Surveillance l

7 8 9

10 12 13 44 45 46 80 AEL E ASE D OF AELEASE AMOUNT Or ACTIVif y 8

I,I Ld i

O.O!A9 mri s i

I vent to Atmosphere 1

LOCATON OF RELEASE 7 8 9

10 11 44 45 80 PERSONNEL EXPOSURES 2

NUVt!F W TYPE D ESCAIP h04 3 lOlOlOl yl NA l

7 89 11 12 13 80 PERSONNEL INJURIES Nt1M6f n DE SCAWTON b l0!Olnl l

'TA l

7 89 11 12 80 OFFSITE CONSEQUENCES (Probable Consequences)

@l None l

7 89 LOSS On DAMAGE TO FACILITY 80

@ (tvPELj l NA DESCAPTON l

7 89 10 80 PUBLICITY 6

4 860613 3l No press release by BEco.

BURNSTEIB6-58 g

7 89 PDR i

80 ADDITIONAL FACTORS b [_

l.

Renctor power was reduced from 70% to 60% on May 18,1975 and further reduced l

]

7 u9 from 60% to ';Oh on May 19,19'/').

80 i

b P.

Refer to LER 75-5 "Undate Report" for additional infa..ation relative to this l

I 80 subject.

80 NAME:

R E. Martin PHONE: 1"b17~7bb"790b va ess.ser

. - ~ _

1 go

/O - Q A gg,7g.

f, _ g - 7 S-i Action Co,n,1rol Form grort n of occurrence.:

Action bv necordn and Flien (telegraim or facsint Jc transmi:. :f onn only) 1.

Complete reproduction of 15 copien (9 copi s for Telephone Reports) 2.

Deternine RO:1 internal distribution from the latest RO:1 assignments list t

(enter namen below) i c' *

/

3 /Our L3

'roject Inspector (5 copies) plus senior (1 copy) and 1

a.

Brancl Chie (1 copy) b.

Direct,or's Office (1 copy) t i

i c.

Records and Files (original,plus 6 copies for c:d tlal distribution) 3.

Facility I:ane (enter here):

e,d,<

C I cIm -

/

]

4.

Determine license or docket ntImber: 50 - ;7 9 L Occu[rence !!o: YF-/ /

5.

11and carry copics of the report to the distribution determined in item A.2 above; hand carry this form to the Project Inspector.

B.

Action b-Proj ec t inspector (all reportr of occ"rrened i

1.

Verify License or Dochet De,tirc:ine a !!If-$ame ffr th tv occurrence:[ lee a,.a /- (!! umber, itc

//.

2.

~~

< [1, 8/h.

l

[%

r1 M L lca 13 -

A fe n.

t9

/4 2s'

.a 1~

> applicabic regulatiot/ under which atdachet$ r'eport was made (check j

3.

Determi 3

one); it c'ntify attached report.md any follow-up reports expected (enter dates):

10 CIh 20.402; Immid.

30 day, other 10 CFR 20.403(a);

+Immed.

,_ 30 day, other

{

10 CFR 20.403(b);

24 i.r, 30 day, others 10 CFR 20.405; 30 day, other 10 CFR 50.55(c);

_ 30 day, other 1

V j

10 CFR 50.71; 24 hr, _

10 day,

/

other 10 CFR 70.52; Prompt.

other j

10 CFR 73.42(b);

Immed.

15 day, other j

Other

_ First, Second other j

4.

Identify if any previous reports uere made on this occurrence, telephone i

telecommunications, letter.

}

5.

{

Designate Branch (if any)

  • .o receive 3 extra copies of report R6EP [g]

11&PP i i

6.

!!o PDR distribdtion i

i 7.

Your name, if not shown in item A.2.a above:

8.

lland carry this forn to Records and Files, j

9.

The report constitutes both a 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> and 10 day notification:

L Q No Yes C.

_ Action by Records and Files 1.

Complete standard transmittals (consider item B.9 above) and preparc.for l

cta i ling.

SAME DAY !!AILI::C IS REQUIRED.

(check here) l 2.

Ent<:r data f rom this form (items A4, B2, B3 into the occurrence report file l

(check here)

{

3.

File this form in ACF chr iological flic.

(telegram, facsimile, or telephonc j

reports only) 3 C-I3

}

RO:I rorm 39 (revised)

June 74 4

d

{

{

May 29, 1975 i

Director, Division of Reactor Licensing Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Cocunission Washington, D.C.

20555 Docket. Number 50-293 License DPR-35 Licensee Event Report 75 Airborne Effluents " Update Report" Gentlemen:

In accordance with Pilgrim Nuclear Power Station Tecluical Specification 6.6.B.3 ve hereby submit Licensee Event Report 75-14, " Update Report".

i l

This report conforms to the requirements of regulatory guide 1.16, l

Revision 2, and was completed within the intent of the Licensee Event Report i

instruction booklet COE-SS-001, dated October 1974, revised December 24, 1974.

i Respectfully submitted, i

I

/

.} 4[,p pd I j.A. Smith

~*"

Pilgrim Division llead Nuclear Operations

Attachment:

A.

LER 75-14 (AO-75-6)

Courtesy Copy to:

Director, Inspection and Enforcessent Region I U.S. Nuclear Regulatory Commission 631 Park Avenue Ring of Prussia, Pennsylvania 19406