Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML20217D12130 September 1999Monthly Operating Repts for Sept 1999 for Lgs,Units 1 & 2. with
ML20217A16922 September 1999Part 21 Rept Re Engine Sys,Inc Controllers,Manufactured Between Dec 1997 & May 1999,that May Have Questionable Soldering Workmanship.Caused by Inadequate Personnel Training.Sent Rept to All Nuclear Customers
ML20212A88613 September 1999Safety Evaluation Authorizing First & Second 10 Yr Interval Inservice Insp Plan Requestss for Relief RR-01Hydrostatic
Nondestructive Examination
VT-2
Incorporated by reference
Liquid penetrant
Pressure boundary leak
ML20212A44831 August 1999Monthly Operating Repts for Aug 1999 for Limerick Generating Station,Units 1 & 2.With
ML20211E98920 August 1999LGS Unit 2 Summary Rept for 970228 to 990525 Periodic ISI Rept Number 5Hydrostatic
VT-2
EVT-1
ML20210L70531 July 1999Monthly Operating Repts for July 1999 for Limerick Generating Station,Units 1 & 2.With
ML20209G02130 June 1999GE-NE-B13-02010-33NP, Evaluation of Limerick Unit 2 Shroud Cracking for at Least One Fuel Cycle of Operation
ML20209D77430 June 1999Monthly Operating Repts for June 1999 for Limerick Generating Station,Units 1 & 2
ML20207H83331 May 1999Non-proprietary Rev 0 to 1H61R, LGS - Unit 2 Core Shroud Ultrasonic ExamNondestructive Examination
ML20195G46531 May 1999Monthly Operating Rept for May 1999 for Lgs,Units 1 & 2
ML20209D77931 May 1999Revised Monthly Operating Repts for May 1999 for Limerick Generating Station,Units 1 & 2
ML20195B3026 May 1999Rev 0 to PECO-COLR-L2R5, COLR for Lgs,Unit 2 Reload 5 Cycle 6Minimum Critical Power Ratio
ML20206N29030 April 1999Monthly Operating Repts for Apr 1999 for Limerick Generating Station,Units 1 & 2.With
ML20195G47630 April 1999Revised Monthly Operating Repts for Apr 1999 for Lgs,Units 1 & 2Coast down
ML20206D89722 April 1999Rev 2 to PECO-COLR-L1R7, COLR for Lgs,Unit 2 Reload 7, Cycle 8Anticipated operational occurrence
Feedwater Controller Failure
ML20205N8341 April 1999Part 21 Rept Re Automatic Switch Co Nuclear Grade Series X206380 & X206832 Solenoid Valves Ordered Without Lubricants That Were Shipped with Std Lubrication to PECO & Tva.Affected Plants Were Notified
ML20205N93131 March 1999Monthly Operating Repts for Mar 1999 for Limerick Generating Station,Units 1 & 2.WithCoast down
ML20204G98511 March 1999Safety Evaluation Re Revised Emergency Action Levels for Limerick Generating Station,Units 1 & 2Safe Shutdown
Reactor Vessel Water Level
Pressure Boundary Leakage
ML20207J74628 February 1999Monthly Operating Repts for Feb 1999 for Limerick,Units 1 & 2.WithCoast down
ML20199G23731 January 1999Rev 0 to NEDO-32645, Limerick Generating Station,Units 1 & 2 SRV Setpoint Tolerance Relaxation Licensing ReptReactor Vessel Water Level
Anticipated operational occurrence
Feedwater Controller Failure
Fuel cladding
ML20199L53019 January 1999Special Rept:On 981214,seismic Monitor Was Declared Inoperable.Caused by Spectral Analyzer Not Running.Attempted to Reboot Sys & Then Sent Spectral Analyzer to Vendor for Analysis & Rework.Upgraded Sys Will Be Operable by 990331Earthquake
B110078, Rev 1 to GE-NE-B1100786-01, Surveillance Specimen Program Evaluation for Limerick Generating Station,Unit 131 December 1998Rev 1 to GE-NE-B1100786-01, Surveillance Specimen Program Evaluation for Limerick Generating Station,Unit 1
ML20205K03831 December 1998PECO Energy 1998 Annual Rept. with
ML20199F96131 December 1998Monthly Operating Repts for Dec 1998 for Limerick Generating Station.With
ML20198C71510 December 1998Rev 1 to COLR for LGS Unit 1,Reload 7,Cycle 8
ML20198A38710 December 1998Safety Evaluation Supporting Licensee Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power- Operated Gate ValvesPower-Operated Valves
Backfit
ML20206N40630 November 1998Monthly Operating Repts for Nov 1998 for Limerick Generating Station,Units 1 & 2.With
ML20199E32823 November 1998Rev 2 to PECO-COLR-L2R4, COLR for Lgs,Unit 2,Reload 4,Cycle 5
ML20195C97731 October 1998Monthly Operating Repts for Oct 1998 for Limerick Generating Station,Units 1 & 2.With
ML20154H56930 September 1998Monthly Operating Repts for Sept 1998 for Limerick Generating Station,Units 1 & 2.With
ML20151X35131 August 1998Monthly Operating Repts for Aug 1998 for Limerick Generating Station Units 1 & 2.With
ML20237F02927 August 1998Special Suppl Rept:On 960425,one Loose Part Detection Sys (Lpds) Was Identified to Be Inoperable.Initially Reported on 960531.Caused by Loose Parts Detector Module.Repairs Performed & Intermittent Ground No Longer Present
ML20237D10417 August 1998Books 1 & 2 of LGS Unit 1 Summary Rept for 960301-980521 Periodic ISI Rept 7
ML20237A77610 August 1998SER Accepting Licensee Response to NRC Bulleting 95-002, Unexpected Clogging of RHR Pump Strainer While Operating in Suppression Pool Cooling ModeForeign Material Exclusion
ML20236X76431 July 1998Rev 0 to SIR-98-079, Response to NRC RAI Re RPV Structural Integrity at Lgs,Units 1 & 2
ML20237B47131 July 1998Monthly Operating Repts for July 1998 for Limerick Generating Station,Units 1 & 2
ML20236N6759 July 1998Part 21 & Deficiency Rept Re Notification of Potential Safety Hazard from Breakage of Cast Iron Suction Heads in Apkd Type Pumps.Caused by Migration of Suction Head Journal Sleeve Along Lower End of Pump Shaft.Will Inspect Pumps
ML20151Z48830 June 1998GE-NE-B1100786-02, Surveillance Specimen Program Evaluation for Limerick Generating Station,Unit 2
ML20236P97830 June 1998Monthly Operating Repts for June 1998 for Limerick Generating Station,Units 1 & 2
ML20196K18030 June 1998Annual 10CFR50.59 & Commitment Rev Rept for 970701-980630 for Lgs,Units 1 & 2. withSafe Shutdown
Loop seal
Offsite Dose Calculation Manual
Fire Barrier
Stroke time
Post Accident Monitoring
Temporary Modification
Process Control Program
Severe Accident Management Guideline
Fuel cladding
ML20249B35011 June 1998Rev 1 to PECO-COLR-L2R4, COLR for LGS Unit 2 Reload 4,Cycle 5Minimum Critical Power Ratio
ML20249A53331 May 1998Monthly Operating Repts for May 1998 for Limerick Units 1 & 2
ML20247M70714 May 1998Safety Evaluation Supporting Amend 128 to License NPF-39Coatings
ML20217Q5104 May 1998Safety Evaluation Supporting Amend 127 to License NPF-39
ML20247H50730 April 1998Monthly Operating Repts for Apr 1998 for Limerick Generating Station
ML20216F36031 March 1998Monthly Operating Repts for Mar 1998 for Limerick Generating Station,Units 1 & 2
ML20217M07931 March 1998Safety Evaluation Supporting Amends 125 & 89 to Licenses NPF-39 & NPF-85,respectively
ML20217D57020 March 1998Part 21 Rept 40 Re Governor Valve Stems Made of Inconel 718 Matl Which Caused Loss of Governor Control.Control Problems Have Been Traced to Valve Stems Mfg by Bw/Ip.Id of Carbon Spacer Should Be Increased to at Least .5005/.5010
ML20216F94728 February 1998Monthly Operating Repts for Feb 1998 for Limerick Generating Station,Units 1 & 2
ML20216F34728 February 1998Revised Monthly Operating Rept for Feb 1998 for Limerick Genrating Station,Unit 1