Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML20209B74130 June 1999Proposed Tech Specs Section 3.8.5, DC Sources - Shutdown, Correcting LCO & Braidwood TS Section 3.8, Electrical Power Systems, Deleting Various References to At&T BatteriesSafe Shutdown
Battery sizing
ML20211C33130 April 1999Rev 2.0 to Generic ODCM for Dresden,Quad Cities,Zion, Lasalle,Byron & BraidwoodOffsite Dose Calculation Manual
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
Process Control Program
Deep Dose Equivalent
ML20204H97823 March 1999Proposed Tech Specs,Revising Sections 3.7.15,3.7.16,4.3.1 & 4.3.3 to Support Installation of New Boral high-density SFP Storage Racks at Byron & Braidwood StationsNondestructive Examination
Earthquake
ML20204H42922 March 1999Proposed Tech Specs 3.9.3,allowing Use of Gamma-Metrics post-accident Neutron Monitors to Provide Neutron Flux Info During Operational Mode 6Anticipated operational occurrence
ML20202G93630 January 1999Rev 1.4 to Chapter 10, Radioactive Effluent Treatment & Monitoring, Rev 1.6 to Chapter 11, Radiological Environ Program & Rev 1.6 to Chapter 12, Radioactive Effluent Technical Standards (Rets), for Odcm,Byron AnnexGrab sample
Offsite Dose Calculation Manual
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
Process Control Program
B.5.b Mitigating Strategies
Deep Dose Equivalent
Power change
ML20198N34729 December 1998Proposed ITS Tables 3.3.1-1 & 3.3.2-1,revising Twelve Allowable ValuesSafe Shutdown
ML20198N20429 December 1998Revised Tech Specs Change,Page 3/4 3-54,providing Early Implementation of Containment Floor Drain Sump Water Level Instrumentation RequirementsReactor Vessel Water Level
ML20198A08114 December 1998Proposed Rev T to Improved Tech Specs Section 3.4, Reactor Coolant SysGrab sample
Power Operated Valves
ML20196G66130 November 1998Proposed Rev to Improved Tech Specs Section 3.1
ML20155J2055 November 1998Proposed TS Converting to Its,Rev R
ML20155J00430 October 1998Proposed Tech Specs Section 5.6.2, Fuel Storage Drainage, to Identify Sf Pool Level Sufficient to Ensure SRP Acceptance Criteria
ML20154S50118 October 1998Proposed Rev N to Improved TS Section 3.7Safe Shutdown
Ultimate heat sink
Anticipated operational occurrence
Power Operated Valves
Power change
ML20154M52815 October 1998Revisions K,O & P of 961213 ITS Submittal
ML20154A8882 October 1998Proposed Rev L to Improved Tech Specs Section 3.8 Closeout
ML20153G43325 September 1998Revs J & M to Tech Specs Sections 3.6 & 5.0,converting to Improved Tech Specs (Its),Final Closeout Package
ML20236W58531 July 1998Proposed Rev G to Sections 3.1 & 3.2 of Improved Tech Specs
ML20237B63930 July 1998Proposed Rev H to Section 3.5 of Improved Tech Specs
ML20237E99721 July 1998Rev I to Proposed Improved Tss,Section 3.9 Re Final Closeout
ML20237B7029 July 1998Proposed Improved TS (ITS) Section 3.3 Issued as Result of Removing Generic Change Traveler TSTF-135,Rev E from ITS Submittal
ML20236H6532 July 1998Rev F to 961213 Improved TS Submittal,Containing Final Package Closeout for Improved TS Sections 1.0,2.0 & 3.0
ML20248M1491 June 1998Proposed Tech Specs Bases Page B 3.8-58b,converting to Improved Tech Specs
ML20248K73631 May 1998Commonwealth Edison Bnps Unit 1 Cycle 9 Startup ReptVT-2
ML20248C55129 May 1998Proposed Tech Specs Bases Section 3/4.4.4, Relief Valves, Specifically Crediting Automatic Function of PORVs to Provide Mitigation for Inadvertent Operation of ECCS at Power AccidentMaintenance Rule Program
Pressure Boundary Leakage
Backfit
ML20217Q8521 May 1998Rev 9 to Bzp 310-2, Nuclear Accident Reporting Sys Form (Primary Responsibility - Station Director). W/Notes & CommentsNuclear Accident Reporting System
ML20216D9439 April 1998Modified Proposed TS Pages Re 980324 Request for Amends to Licenses NPF-37 & NPF-66
ML20217E18924 March 1998Proposed Tech Specs Surveillance Sections & Bases Allowing Util to Defer 10CFR50,App J,Type a Testing of Byron Unit 2 Containment Until Next Refuel Outage in 1999
ML20217B26814 February 1998Proposed Rev D to ITSHigh Radiation Area
Annual Radiological Environmental Operating Report
Process Control Program
ML20199J75831 December 1997Rev 1 to IST Plan Pumps & Valves Byron Nuclear Generating Station,Units 1 & 2Boric Acid
Ultimate heat sink
Stroke time
Weld Overlay
Cold shutdown justification
Power-Operated Valves
Power Operated Valves
Scaffolding
ML20198C31830 December 1997Proposed Tech Specs 3.7.1.3 Re Condensate Storage TankUltimate heat sink
ML20203M59217 December 1997Proposed Tech Specs,Rev C Changes Improved TSs 3.0,3.3,3.7, 3.8 & 5.0 as Result of Removing Generic Change Traveler TSTF-115 from Improved TS SubmittalSafe Shutdown
Anticipated operational occurrence
Battery sizing
Offsite Circuit
ML20203D0369 December 1997Proposed Tech Specs Pages Correcting Errors Discovered in Current TS W/Regards to Total RCS Volume & Correction to Increase in RCS Volume Associated W/Unit 1 Replacement SGs Accounting for Hot ConditionsLoop seal
ML20199A4757 November 1997Proposed Tech Specs Pages Revising TS Surveillance Sections 4.6.1.1.c,4.6.1.2.a,4.6.1.2.c & Bases to Allow Performance of 10CFR50 App J,Type a Testing
ML20216H82431 October 1997Revs to OCDM for Byron Station,Including Rev 1.3 to Chapter 10,rev 1.5 to Chapters 11 & 12 & Rev 1.3 to App FGrab sample
Offsite Dose Calculation Manual
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
Process Control Program
Deep Dose Equivalent
Power change
ML20198M26231 October 1997Revs to Offsite Dose Calculation Manual,Consisting of Rev 1.5 to Chapter 11 & Rev 1.5 to Chapter 12Offsite Dose Calculation Manual
ML20217K44621 October 1997Proposed Tech Specs Re Boron Credit in SFPHigh Radiation Area
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
Process Control Program
ML20202F45610 October 1997Proposed Tech Specs,Deleting Lower Flow Rate Requirement Associated W/Nonaccessible Area Exhaust Filter Plenum & Fuel Handling Bldg Ventilation SysShutdown Margin
Process Control Program
ML20211D94224 September 1997Proposed Tech Specs Revising Allowable Time Interval for Performing Turbine Throttle Valve & Turbine Valve SRs Requirements from Monthly to Quarterly
ML20216G8548 September 1997Proposed Tech Specs Change to TS 4.5.2.b & Associated Bases Bringing Byron Unit 1 & Braidwood Unit 1 Requirement in Conformance W/Unit 2 Requirements Approved by NRC in
ML20217H6077 August 1997Proposed Tech Specs Pages,Revising Bases for Proposed Improved TS SR 3.8.6.1 & 3.8.6.3,to Indicate That Correction for Level Is Not Required When Battery Charging Current Is Less than 2 Amps for Gould & Less than 3 Amps for C&D
ML20148P77230 June 1997Proposed Tech Specs,Revising TS 3.9.11,5.6.1.1 & 6.9.10 to Allow Util to Permanently Take Credit for Soluble B in Spent Fuel Storage Pool Water to Maintain Acceptable Margin of SubcriticalityShutdown Margin
ML20141F30824 June 1997Proposed Tech Specs,Changing TS for ECCS Venting
ML20141B77817 June 1997Proposed Tech Specs Revising TS Sections 3/4.6.1.6,4.6.1.2, 6.8.4 & 6.9.1.11 to Support New Requirements in 10CFR50.55a, Which Requires Utils to Update Existing Containment Vessel Structural Integrity Programs
ML20148J3239 June 1997Proposed TS Reflecting Latest Rev of Waste Gas Decay Tank Rupture Accident Dose Calculation
ML20140D00831 May 1997Proposed Tech Specs,Revising TS Surveillance Requirement Re ECCS Pump Casings & Discharge Piping High Points Outside of Containment
ML20141K89924 May 1997Proposed Tech Specs Revising TS Surveillance Requirement 4.5.2.b to Encompass non-operating ECCS Pumps & Discharge Piping Which Are Provided W/High Point Vent Valves
ML20141K33823 May 1997Proposed Tech Specs Requesting Enforcement Discretion from Compliance W/Ts 4.5.2.b.1 Requirements of Venting of Emergency Core Cooling Sys Pump Casings & Discharge Piping High Points Outside of ContainmentEnforcement Discretion
ML20141K00121 May 1997Proposed Tech Specs Relocating Reactor Vessel Surveillance Program Capsule Withdrawal Schedules IAW GL 91-01Offsite Dose Calculation Manual
Stroke time
Anticipated operational occurrence
Post Accident Monitoring
Hydrostatic
Pressure and Temperature Limits Report
Pressure Boundary Leakage
Power change
ML20148B6156 May 1997Proposed Tech Specs,Revising TS 3/4.7.5, Ultimate Heat Sink & Associated Bases to Support SG Replacement & Incorporate Recent UHS Design EvaluationsUltimate heat sink
ML20196G05025 April 1997Proposed Tech Specs Revising Primary Containment & Reactor Coolant Sys Volume Associated W/Unit 1 Steam Generator Replacement
ML20137S5347 April 1997Proposed Tech Specs 3/4.8.2 Re D.C. Sources