Quarter | Site | Title | Topic | |
---|---|---|---|---|
05000482/FIN-2018003-01 | 2018Q3 | Wolf Creek | Failure to Correct Degraded Performance of a Safety-Related Tornado Damper | Condition Adverse to Quality |
05000275/FIN-2018008-03 | 2018Q2 | Diablo Canyon | Failure to Promptly Identify and Correct Emergency Diesel Generator 1-1 Cardox System Inoperability | |
05000483/FIN-2018002-04 | 2018Q2 | Callaway | Failure of an Analysis of the Impact of Changes to Emergency Action Levels to Demonstrate the Changes Did Not Reduce the Effectiveness of the Emergency Plan | |
05000313/FIN-2017003-01 | 2017Q3 | Arkansas Nuclear | Failure to Maintain Service Water Train Separation | Unanalyzed Condition Past operability Significance Determination Process |
05000275/FIN-2017002-04 | 2017Q2 | Diablo Canyon | Failure to Follow Procedures Results in Partial Loss of Cooling Flow to Shutdown Cooling | Significance Determination Process |
05000416/FIN-2017008-01 | 2017Q2 | Grand Gulf | Untimely Corrective Action | Safe Shutdown Multiple Spurious Operation Significance Determination Process |
05000254/FIN-2017002-03 | 2017Q2 | Quad Cities | Failure to Justify MSIV Maintenance Deferral | Significance Determination Process |
05000482/FIN-2017007-01 | 2017Q2 | Wolf Creek | Failure to Maintain Effectiveness of the Emergency Plan upon Loss of Containment High Radiation Monitoring | |
05000382/FIN-2017002-04 | 2017Q2 | Waterford | Failure to Perform a Post Maintenance Test on a Main Steam Isolation Valve Solenoid Valve | Significance Determination Process Maintenance Rule Program |
05000397/FIN-2017007-01 | 2017Q1 | Columbia | Failure to Evaluate and Control Nonconforming SSCs | |
05000397/FIN-2016009-08 | 2017Q1 | Columbia | Failure to Transfer Byproduct Material to a Disposal Facility in Accordance with the Terms of the Facilitys License | |
05000397/FIN-2016009-01 | 2017Q1 | Columbia | Shipment of a Type B Quantity of Radioactive Material in a Type A Package | Significance Determination Process |
05000382/FIN-2016008-01 | 2016Q4 | Waterford | Failure to Control Nonconforming Parts | |
05000498/FIN-2016407-01 | 2016Q4 | South Texas | Security | |
05000482/FIN-2016008-02 | 2016Q2 | Wolf Creek | Failure to Promptly Identify and Correct a Condition Adverse to Quality Associated with the Emergency Diesel Generator B Excitation System Diodes | Condition Adverse to Quality Significance Determination Process |
05000483/FIN-2016002-01 | 2016Q2 | Callaway | Failure to Account for Water Hammer Stresses in Essential Service Water System Calculations | Significance Determination Process Maintenance Rule Program |
05000483/FIN-2016002-02 | 2016Q2 | Callaway | Failure to Meet Applicable ASME Code Requirements for Repairs to Components in the Essential Service Water System | Significance Determination Process Maintenance Rule Program |
05000483/FIN-2016002-03 | 2016Q2 | Callaway | Failure to Adequately Evaluate Operability for a Degraded Condition | Significance Determination Process Maintenance Rule Program |
05000298/FIN-2016002-01 | 2016Q2 | Cooper | Failure to Meet Technical Specification Requirements for Traversing In-Core Probe B Ball Valve ( | Significance Determination Process |
05000254/FIN-2016002-01 | 2016Q2 | Quad Cities | Failure to Maintain Parameters within Limits of TS 3.6.2.5 and 3.6.3.1 | Significance Determination Process |
05000530/FIN-2016001-01 | 2016Q1 | Palo Verde | Failure to use adequate engineering and radiological controls resulting in two unplanned intakes | Significance Determination Process Substantial potential for overexposure |
05000313/FIN-2016007-03 | 2016Q1 | Arkansas Nuclear | Inadequate Operating Experience Evaluations | Internal Flooding Significance Determination Process |
05000313/FIN-2016007-04 | 2016Q1 | Arkansas Nuclear | Inadequate Control of Monitoring for Wall Loss in the Service Water System | Significance Determination Process |
05000458/FIN-2015010-04 | 2016Q1 | River Bend | Failure to Accomplish an Operability Determination In Accordance With Procedures | Significance Determination Process Maintenance Rule Program |
05000458/FIN-2016009-04 | 2016Q1 | River Bend | Failure to Adequately Assess Risk During Motor Generator Set Unavailability | Significance Determination Process Incremental Core Damage Probability Deficit |
05000275/FIN-2016007-03 | 2016Q1 | Diablo Canyon | Failure to Ensure Safety-Related Alternating Current and Direct Current Equipment Functionality at Maximum Allowable Voltages | Significance Determination Process |
05000498/FIN-2016007-06 | 2016Q1 | South Texas | Failure to Correct Conditions Adverse to Quality Associated with the Eagle 21 System | Significance Determination Process |
05000498/FIN-2016001-01 | 2016Q1 | South Texas | Failure to Identify and Correct Faulty NI-36 Channel | Condition Adverse to Quality Significance Determination Process |
05000416/FIN-2015004-02 | 2015Q4 | Grand Gulf | Failure to Timely Enter Technical Specification Surveillance Requirement 3.0.1 | Significance Determination Process Maintenance Rule Program |
05000275/FIN-2015004-02 | 2015Q4 | Diablo Canyon | Failure to Identify a Cause and Implement Actions to Prevent Recurrence of a Significant Condition Adverse to Quality | Condition Adverse to Quality |
05000482/FIN-2015004-03 | 2015Q4 | Wolf Creek | Failure to Perform an Adequate Operability Determination and Consider Design Basis Events | Functionality Assessment Significance Determination Process |
05000483/FIN-2015009-04 | 2015Q4 | Callaway | Two Examples of a Failure to Properly Designate the Significance Level of Callaway Action Requests. | |
05000445/FIN-2015008-02 | 2015Q3 | Comanche Peak | Failure to Properly Assess and Document the Basis for Operability associated with the Turbine Driven Auxiliary Feedwater Pumps Steam Exhaust Piping not being Evaluated for Tornado Generated Missile Impacts | Tornado Generated Missile Significance Determination Process Maintenance Rule Program |
05000298/FIN-2015003-01 | 2015Q3 | Cooper | Failure to Ensure Turbine Building Design Calculation was Correct and Justified | Significance Determination Process Maintenance Rule Program |
05000445/FIN-2015008-01 | 2015Q3 | Comanche Peak | Failure to Evaluate the Lack of Missile Protection on the Turbine Driven Auxiliary Feedwater Pumps Steam Exhaust Piping | Tornado Missile Significance Determination Process Maintenance Rule Program |
05000483/FIN-2015003-03 | 2015Q3 | Callaway | Unauthorized Non-Routine Maintenance on a Sealed Source Device | High Radiation Area Significance Determination Process Substantial potential for an overexposure |
05000285/FIN-2015002-02 | 2015Q2 | Fort Calhoun | Failure to Perform a Valid 40-Month Inservice Test | Significance Determination Process Through-Wall Leak |
05000458/FIN-2015406-02 | 2015Q2 | River Bend | Security | |
05000285/FIN-2015002-01 | 2015Q2 | Fort Calhoun | Failure to Include a Class 1 Component in the Reactor Vessel Pressure Boundary Integrity Test | Significance Determination Process |
05000298/FIN-2015007-04 | 2015Q2 | Cooper | Failure to Evaluate the Lack of Missile Protection on the Emergency Diesel Generator 1 and 2 Fuel Oil Storage Tank Vents | Significance Determination Process |
05000298/FIN-2015002-01 | 2015Q2 | Cooper | Failure to Prevent Reactor Thermal Power from Exceeding 2419 MWt for Preplanned Activity | Preplanned Activity Fuel cladding Power change |
05000313/FIN-2015002-04 | 2015Q2 | Arkansas Nuclear | Failure to Perform Testing of Diesel Fuel Oil Transfer Piping | |
05000285/FIN-2015002-03 | 2015Q2 | Fort Calhoun | Failure to Establish Adequate Work Instructions to Clean and Inspect the Reactor Vessel Head | Significance Determination Process |
05000368/FIN-2015008-05 | 2015Q2 | Arkansas Nuclear | Failure to Identify, Document, and Mitigate Risk from LongTerm Deficient Conditions | |
05000285/FIN-2015007-06 | 2015Q1 | Fort Calhoun | Failure to Perform an Adequate Auxiliary Feedwater Pump Runout Design Calculation | Significance Determination Process |
05000482/FIN-2015001-03 | 2015Q1 | Wolf Creek | Failure to Complete an Adequate Operability Evaluation for Declaring the Train A Control Room Air Conditioning Unit Operable | Significance Determination Process Maintenance Rule Program |
05000382/FIN-2014005-06 | 2014Q4 | Waterford | Failure to Correct a Condition Adverse to Quality in a Timely Manner | Condition Adverse to Quality |
05000285/FIN-2013018-05 | 2014Q4 | Fort Calhoun | Use of Non-Conservative Inputs in Thermal Lag Analyse | Significance Determination Process Maintenance Rule Program |
05000285/FIN-2013018-06 | 2014Q4 | Fort Calhoun | Failure to Recognize Adverse Design Changes | Significance Determination Process |
05000285/FIN-2014009-10 | 2014Q3 | Fort Calhoun | Deficient Evaluation of NRC Bulletin 88-04, Strong Pump Weak Pump Due to Failure to Consider the Effect of Auxiliary Feedwater Pumps Discharge Check Valves Leakage | Significance Determination Process Maintenance Rule Program |