Semantic search
Jump to navigation
Jump to search
Quarter | Site | Title | Topic | |
---|---|---|---|---|
05000244/FIN-2018403-01 | 2018Q2 | Ginna | Security | |
05000387/FIN-2017405-01 | 2017Q3 | Susquehanna | Security | |
05000293/FIN-2017002-06 | 2017Q2 | Pilgrim | Secondary Containment Testing not performed per Technical Specifications | Significance Determination Process Fuel cladding |
05000353/FIN-2017002-01 | 2017Q2 | Limerick | Inadequate Design Control of the Drywell Unit Cooler Condensate Flow Rate Monitoring System | |
05000293/FIN-2016011-10 | 2017Q1 | Pilgrim | Failure to Promptly Correct a Condition Adverse to Quality for the Residual Heat Removal System | Condition Adverse to Quality Significance Determination Process |
05000293/FIN-2016403-04 | 2016Q4 | Pilgrim | Security | |
05000286/FIN-2016004-03 | 2016Q4 | Indian Point | Failure to Provide Indication of a Bypassed RPS Channel During Testing | Temporary Modification |
05000293/FIN-2016004-01 | 2016Q4 | Pilgrim | Failure to Promptly Perform an Operability Evaluation for a Recirculation Flow Converter | Significance Determination Process |
05000293/FIN-2016004-04 | 2016Q4 | Pilgrim | Failure to Correct a Condition Adverse to Quality Associated with Main Steam Isolation Valve | Condition Adverse to Quality Significance Determination Process Fuel cladding |
05000277/FIN-2016404-01 | 2016Q3 | Peach Bottom | Security | |
05000336/FIN-2016403-01 | 2016Q3 | Millstone | Security | |
05000354/FIN-2016003-03 | 2016Q3 | Hope Creek | Inadequate Procedure Adherence Resulted in a Loss of Shutdown Cooling | Significance Determination Process |
05000286/FIN-2016003-03 | 2016Q3 | Indian Point | Untimely Corrective Actions to Address Degraded Automatic Voltage Regulator Cards | Significance Determination Process |
05000354/FIN-2016003-01 | 2016Q3 | Hope Creek | Inadequate Implementation of Adverse Condition Monitoring Actions for the High Pressure Coolant Injection System | Significance Determination Process Large early release frequency Preliminary White Finding |
05000387/FIN-2016002-01 | 2016Q2 | Susquehanna | Failure to Promptly Identify a Condition Adverse to Quality Associated with Primary Containment Isolation Valves | Condition Adverse to Quality |
05000286/FIN-2016001-03 | 2016Q1 | Indian Point | Inadequate Screening of Reactor Protection System Test Method Change | |
05000334/FIN-2016001-01 | 2016Q1 | Beaver Valley | Failure to Properly Evaluate Control Room Envelope Test Results | Reasonable doubt of operability |
05000272/FIN-2015004-02 | 2015Q4 | Salem | Inadequate Maintenance Effectiveness of Control Room Ventilation Radiation Monitors | |
05000311/FIN-2015003-02 | 2015Q3 | Salem | Inadequate Operability Determination of Auxiliary Feedwater Flow Rate Indicator | Functionality Assessment |
05000247/FIN-2015003-02 | 2015Q3 | Indian Point | Incorrect Operability Determination Results in Failure to Comply with Technical Specification for Containment Integrity | Significance Determination Process |
05000293/FIN-2015003-02 | 2015Q3 | Pilgrim | Inadequate EDG Common Cause Determinations Result in TS Violation | Significance Determination Process |
05000336/FIN-2015007-01 | 2015Q2 | Millstone | Reactor Building Closed Cooling Water System Pump Oil Leakage Results in Technical Specification Inoperability | Mission time Large early release frequency |
05000334/FIN-2015002-01 | 2015Q2 | Beaver Valley | Failure to Utilize Respiratory Protection as Specified by the Radiation Work Permi | Significance Determination Process Unplanned internal exposure Substantial potential for overexposure |
05000333/FIN-2015007-01 | 2015Q2 | FitzPatrick | Failure to Adequately Assess the Impact of SRV Leakage on Operability | Significance Determination Process |
05000293/FIN-2015002-02 | 2015Q2 | Pilgrim | Inadequate Operability Determination for the B EDG Results in TS Violation | Mission time Significance Determination Process |
05000293/FIN-2015007-01 | 2015Q1 | Pilgrim | Inadequate Past Operability Assessment of C Safety Relief Valve | Past operability Significance Determination Process |
05000423/FIN-2014013-02 | 2014Q4 | Millstone | Failure to Identify and Correct Adverse Conditions related to the Turbine Driven Auxiliary Feedwater Pump Governor to Control Valve Linkage | |
05000423/FIN-2014005-03 | 2014Q4 | Millstone | Failure to Correct Multiple A HVK Start and Runtime Failures | |
05000272/FIN-2014004-04 | 2014Q3 | Salem | Inadequate Interim Corrective Actions on Current Transformers Result in Reactor Trip | |
05000387/FIN-2014009-03 | 2014Q2 | Susquehanna | Failure to Correct Condition Adverse to Quality Related to Fatigue Stress in ESW Supply Lines to RHR Pump Motor Oil Cooler | Condition Adverse to Quality Significance Determination Process |
05000334/FIN-2014003-02 | 2014Q2 | Beaver Valley | Removal of Missile Barrier Renders Containment Inoperable | Significance Determination Process |
05000293/FIN-2014003-02 | 2014Q2 | Pilgrim | Failure to Comply with TS Required Actions for Inoperable PCIV | Significance Determination Process |
05000336/FIN-2014003-02 | 2014Q2 | Millstone | Failure to Utilize Respiratory Protection as Specified in Work Control Documents | |
05000271/FIN-2014403-01 | 2014Q2 | Vermont Yankee | Security | |
05000244/FIN-2014403-01 | 2014Q2 | Ginna | Security | |
05000352/FIN-2014403-03 | 2014Q2 | Limerick | Licensee-Identified Violation | |
05000244/FIN-2014002-03 | 2014Q1 | Ginna | Failure or Emergency Preparedness Drill Critique to Identify a Risk-Significant Planning Standard Weakness | Significance Determination Process |
05000410/FIN-2014002-02 | 2014Q1 | Nine Mile Point | Invalid Low Reactor Water Level Results in Unit 2 Automatic Reactor Scram | Significance Determination Process |
05000311/FIN-2014002-03 | 2014Q1 | Salem | Inadequate Risk Assessment and Risk Management Actions for UV Testing | Significance Determination Process Incremental Core Damage Probability Deficit |
05000293/FIN-2013403-05 | 2013Q4 | Pilgrim | Security | |
05000423/FIN-2013005-03 | 2013Q4 | Millstone | Inadequate Operability Determination for TDAFW Pump Overspeed Trip | |
05000293/FIN-2013008-03 | 2013Q4 | Pilgrim | Security | |
05000247/FIN-2013403-02 | 2013Q3 | Indian Point | Security | |
05000317/FIN-2013202-01 | 2013Q3 | Calvert Cliffs | Security | |
05000443/FIN-2013004-01 | 2013Q3 | Seabrook | Inadequate Operability Determination Regarding Service Water Leakage and Associated TS Violation | Nondestructive Examination Functionality Assessment Through-Wall Leak |
05000354/FIN-2013004-01 | 2013Q3 | Hope Creek | Failure to Follow PMT Procedure Prior to Returning the B FRVS Recirculation Fan to Service | |
05000336/FIN-2013004-02 | 2013Q3 | Millstone | \"Inadequate Operability Determination for the Turbine Drive Auxiliary Feedwater (TDAFW) Pump\" | |
05000387/FIN-2013403-01 | 2013Q2 | Susquehanna | Security | |
05000220/FIN-2013003-02 | 2013Q2 | Nine Mile Point | Inadequate Procedural Implementation for Battery Cell Replacement | Significance Determination Process |
05000334/FIN-2013201-02 | 2013Q2 | Beaver Valley | Security |