MONTHYEARRBG-48271, Supplement to License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times RITSTF Initiative 4b and Application to Adopt 10 CFR 50.69, Risk2024-01-12012 January 2024 Supplement to License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times RITSTF Initiative 4b and Application to Adopt 10 CFR 50.69, Risk RBG-48267, Reply to a Notice of Violation, NRC Inspection Report 05000458/20230032023-12-0707 December 2023 Reply to a Notice of Violation, NRC Inspection Report 05000458/2023003 RBG-48264, Core Operating Limits Report (COLR) - Cycle 23, Revision 12023-11-0606 November 2023 Core Operating Limits Report (COLR) - Cycle 23, Revision 1 RBG-48260, Notification of Readiness for Supplemental Inspection2023-10-12012 October 2023 Notification of Readiness for Supplemental Inspection RBG-48258, Notification of Readiness for Supplemental Inspection2023-10-0505 October 2023 Notification of Readiness for Supplemental Inspection RBG-48259, Revision to Reply to Notice of Violation; EA-23-0552023-10-0303 October 2023 Revision to Reply to Notice of Violation; EA-23-055 RBG-48254, Report of Changes and Errors to 10CFR50.462023-09-21021 September 2023 Report of Changes and Errors to 10CFR50.46 RBG-48249, Reply to a Notice of Violation, EA-23-0712023-09-14014 September 2023 Reply to a Notice of Violation, EA-23-071 RBG-48253, Submittal of Owner'S Activity Report Form for Cycle 222023-09-12012 September 2023 Submittal of Owner'S Activity Report Form for Cycle 22 RBG-48247, Reply to Notice of Violation; EA-23-0552023-08-21021 August 2023 Reply to Notice of Violation; EA-23-055 RBG-48226, Core Operating Limits Report (COLR) - Cycle 23, Revision 02023-05-31031 May 2023 Core Operating Limits Report (COLR) - Cycle 23, Revision 0 RBG-48237, Response to NRC Integrated Inspection Report 05000458/20230012023-05-25025 May 2023 Response to NRC Integrated Inspection Report 05000458/2023001 RBG-48220, Submittal of 2022 Annual Radioactive Effluent Release Report2023-04-25025 April 2023 Submittal of 2022 Annual Radioactive Effluent Release Report RBG-48221, 2022 Annual Radiological Environmental Operating Report2023-04-25025 April 2023 2022 Annual Radiological Environmental Operating Report RBG-48142, License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSFT-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2023-02-27027 February 2023 License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSFT-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b RBG-48143, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2023-02-27027 February 2023 Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors RBG-48198, Report of Changes and Errors to 10CFR50.462022-09-22022 September 2022 Report of Changes and Errors to 10CFR50.46 RBG-48187, Notification of Spent Fuel Cask Use2022-08-15015 August 2022 Notification of Spent Fuel Cask Use RBG-48184, Notification of Spent Fuel Cask Use2022-07-18018 July 2022 Notification of Spent Fuel Cask Use RBG-48178, Notification of Spent Fuel Cask Use2022-06-29029 June 2022 Notification of Spent Fuel Cask Use RBG-48166, Supplement to Special Report for Tritium Discovered Onsite2022-05-12012 May 2022 Supplement to Special Report for Tritium Discovered Onsite RBG-48149, 2021 Annual Radioactive Effluent Release Report2022-04-27027 April 2022 2021 Annual Radioactive Effluent Release Report RBG-48148, 2021 Annual Radiological Environmental Operating Report2022-04-27027 April 2022 2021 Annual Radiological Environmental Operating Report RBG-48134, Inservice Testing Program Relief Request VRR-RBS-2021-1 Pressure Isolation Valve Testing Frequency2021-11-29029 November 2021 Inservice Testing Program Relief Request VRR-RBS-2021-1 Pressure Isolation Valve Testing Frequency RBG-48136, Additional Information for the 2020 Annual Radioactive Effluent Release Report2021-11-12012 November 2021 Additional Information for the 2020 Annual Radioactive Effluent Release Report RBG-48137, Additional Information for the 2019 Annual Radioactive Effluent Release Report2021-11-12012 November 2021 Additional Information for the 2019 Annual Radioactive Effluent Release Report RBG-48128, Reply to a Notice of Violation; EA-21-017, 030 and 0502021-10-29029 October 2021 Reply to a Notice of Violation; EA-21-017, 030 and 050 RBG-48129, Payment of a Civil Penalty2021-10-21021 October 2021 Payment of a Civil Penalty RBG-48112, Report of Changes and Errors to 10CFR50.462021-09-16016 September 2021 Report of Changes and Errors to 10CFR50.46 RBG-48110, Core Operating Limits Report (COLR) - Cycle 22, Revision 12021-08-19019 August 2021 Core Operating Limits Report (COLR) - Cycle 22, Revision 1 RBG-48104, Fitness for Duty Blind Quality Assurance Specimen Testing Error2021-06-30030 June 2021 Fitness for Duty Blind Quality Assurance Specimen Testing Error RBG-48099, Submittal of Owner'S Activity Report Form for Cycle 212021-06-16016 June 2021 Submittal of Owner'S Activity Report Form for Cycle 21 RBG-48083, Application to Add License Condition Concerning Receipt, Possession, and Use of Byproduct Materials2021-06-15015 June 2021 Application to Add License Condition Concerning Receipt, Possession, and Use of Byproduct Materials RBG-48093, Corrected 2020 Annual Radiological Environmental Operating Report2021-05-20020 May 2021 Corrected 2020 Annual Radiological Environmental Operating Report RBG-48082, 2020 Annual Radiological Environmental Operating Report2021-04-20020 April 2021 2020 Annual Radiological Environmental Operating Report RBG-48081, 2020 Annual Radioactive Effluent Release Report2021-04-20020 April 2021 2020 Annual Radioactive Effluent Release Report RBG-48078, Core Operating Limits Report (COLR) - Cycle 22, Revision 02021-03-14014 March 2021 Core Operating Limits Report (COLR) - Cycle 22, Revision 0 RBG-48075, Notification of Deviation from BWRVIP Guidelines2021-02-24024 February 2021 Notification of Deviation from BWRVIP Guidelines RBG-48074, Spent Fuel Storage Radioactive Effluent Release Report for 20202021-02-22022 February 2021 Spent Fuel Storage Radioactive Effluent Release Report for 2020 RBG-48061, One-Time Schedular Exemption Request from 10 CFR 50, Appendix E Biennial Emergency Preparedness Exercise Requirements Due to COVID-19 Public Health Emergency2020-12-0303 December 2020 One-Time Schedular Exemption Request from 10 CFR 50, Appendix E Biennial Emergency Preparedness Exercise Requirements Due to COVID-19 Public Health Emergency RBG-48054, Application to Adopt GL 86-10 Standard License Condition for Fire Protection Program2020-11-0202 November 2020 Application to Adopt GL 86-10 Standard License Condition for Fire Protection Program RBG-48049, Reply to a Notice of Violation; EA-20-0582020-10-26026 October 2020 Reply to a Notice of Violation; EA-20-058 RBG-48038, Request for One-Time Exemption from 10 CFR 50, Appendix E Biennial Emergency Preparedness Evaluated Offsite Exercise Requirements Due to Covid 19 Pandemic2020-10-0606 October 2020 Request for One-Time Exemption from 10 CFR 50, Appendix E Biennial Emergency Preparedness Evaluated Offsite Exercise Requirements Due to Covid 19 Pandemic RBG-48042, Submittal of Rev. 48 to Emergency Plan2020-09-22022 September 2020 Submittal of Rev. 48 to Emergency Plan RBG-48039, Report of Changes and Errors to 10CFR50.462020-09-16016 September 2020 Report of Changes and Errors to 10CFR50.46 RBG-48033, Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements2020-09-0404 September 2020 Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements RBG-48023, Submittal of Revs. 46 and 47 to Emergency Plan and Revised Emergency Implementing Procedures2020-06-0909 June 2020 Submittal of Revs. 46 and 47 to Emergency Plan and Revised Emergency Implementing Procedures RBG-48019, 2019 Annual Radioactive Effluent Release Report2020-04-30030 April 2020 2019 Annual Radioactive Effluent Release Report RBG-48020, Annual Radiological Environmental Operating Report2020-04-30030 April 2020 Annual Radiological Environmental Operating Report RBG-48018, Withdrawal of License Amendment Request to Extend the RBS Emergency Plan Implementation Date2020-04-24024 April 2020 Withdrawal of License Amendment Request to Extend the RBS Emergency Plan Implementation Date 2024-01-12
[Table view] Category:License-Application for Facility Operating License (Amend/Renewal) DKT 50
MONTHYEARML23208A2112023-07-27027 July 2023 Entergy Operations Inc., Application to Revise Technical Specifications to Adopt TSTF-205, Revision of Channel Calibration, Channel Functional Test, and Related Definitions RBG-48143, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2023-02-27027 February 2023 Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors ML21279A2312021-10-0606 October 2021 Application to Revise Technical Specifications to Adopt TSTF-554, Revise Reactor Coolant Leakage Requirements Using the Consolidated Line-Item Improvement ML21266A1612021-09-23023 September 2021 Application to Revise Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated RBG-48083, Application to Add License Condition Concerning Receipt, Possession, and Use of Byproduct Materials2021-06-15015 June 2021 Application to Add License Condition Concerning Receipt, Possession, and Use of Byproduct Materials ML21062A1982021-03-0303 March 2021 Supplement to License Amendment Request to Adopt TSTF-501 Relocate Stored Fuel Oil and Lube Oil Volumes to Licensee Control, Revision 1 RBG-48033, Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements2020-09-0404 September 2020 Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements CNRO-2020-00009, Application to Revise Technical Specifications to Adopt TSTF-501 Relocate Stored Fuel Oil and Lube Oil Volumes to Licensee Control, Revision 12020-02-26026 February 2020 Application to Revise Technical Specifications to Adopt TSTF-501 Relocate Stored Fuel Oil and Lube Oil Volumes to Licensee Control, Revision 1 CNRO-2020-00008, Application to Revise Technical Specifications to Adopt TSTF-566, Revise Actions for Inoperable RHR-Shutdown Cooling Subsystems Using the Consolidated Line Item Improvement Process2020-01-24024 January 2020 Application to Revise Technical Specifications to Adopt TSTF-566, Revise Actions for Inoperable RHR-Shutdown Cooling Subsystems Using the Consolidated Line Item Improvement Process CNRO-2020-00006, Application to Revise Technical Specifications to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO, Revision 22020-01-24024 January 2020 Application to Revise Technical Specifications to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO, Revision 2 RBG-47983, Application to Revise Technical Specification 3.3.5.2, RPV Water Inventory Control Instrumentation to Adopt TSTF-425, Relocate Surveillance Frequencies to Licensee Control - RITSTF Initiative 5b.2019-11-18018 November 2019 Application to Revise Technical Specification 3.3.5.2, RPV Water Inventory Control Instrumentation to Adopt TSTF-425, Relocate Surveillance Frequencies to Licensee Control - RITSTF Initiative 5b. CNRO-2019-00009, Stations - Application to Revise Technical Specifications to Adopt TSTF-564, Safety Limit MCPR, Revision 22019-03-0707 March 2019 Stations - Application to Revise Technical Specifications to Adopt TSTF-564, Safety Limit MCPR, Revision 2 CNRO-2019-00003, Application to Revise Technical Specifications to Adopt TSTF-529 11 Clarify Use and Application Rules, 11 Revision 42019-01-31031 January 2019 Application to Revise Technical Specifications to Adopt TSTF-529 11 Clarify Use and Application Rules, 11 Revision 4 RBG-47925, Supplement to Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (TSTF-425)2018-12-20020 December 2018 Supplement to Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (TSTF-425) RBG-47918, Removal of the Table of Contents from the Technical Specifications2018-11-29029 November 2018 Removal of the Table of Contents from the Technical Specifications RBG-47906, Response to Request for Additional Information for License Amendment Request, Adoption of Emergency Action Level Scheme Pursuant to NEI 99-01, Revision 62018-10-18018 October 2018 Response to Request for Additional Information for License Amendment Request, Adoption of Emergency Action Level Scheme Pursuant to NEI 99-01, Revision 6 RBG-47883, Amendment 1 to License Renewal Application2018-08-0202 August 2018 Amendment 1 to License Renewal Application RBG-47886, Supplement to Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (TSTF-425)2018-07-24024 July 2018 Supplement to Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (TSTF-425) RBG-47882, Supplement to Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (TSTF-425)2018-07-10010 July 2018 Supplement to Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (TSTF-425) RBG-47850, Response to License Renewal Application NRC Request for Additional Information Set 5 Supplement2018-04-0404 April 2018 Response to License Renewal Application NRC Request for Additional Information Set 5 Supplement RBG-47824, License Amendment Request to Correct a Non-Conservative Technical Specification Figure 3.4.11-1 Minimum Temperature Required Vs. RCS Pressure by Replacing with 54 Effective Full Power Years (EFPY) Curves2018-04-0202 April 2018 License Amendment Request to Correct a Non-Conservative Technical Specification Figure 3.4.11-1 Minimum Temperature Required Vs. RCS Pressure by Replacing with 54 Effective Full Power Years (EFPY) Curves RBG-47848, License Renewal Application Update - Neutron Absorbing Material Monitoring Program - Supplement2018-03-22022 March 2018 License Renewal Application Update - Neutron Absorbing Material Monitoring Program - Supplement RBG-47799, Application for Technical Specification Change Regarding Risk - Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (TSTF-425)2018-02-28028 February 2018 Application for Technical Specification Change Regarding Risk - Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (TSTF-425) RBG-47830, License Renewal Application Update - Neutron Absorbing Material Monitoring Program2018-02-15015 February 2018 License Renewal Application Update - Neutron Absorbing Material Monitoring Program RBG-47823, Request for Review and Approval of Relocation of the Reactor Core Isolation Cooling (RCIC) Injection Point from the Reactor Vessel Head Spray Nozzle to the 'A' Feedwater Line Via the 'A' Residual Heat Removal (RHR) Shutdown Cooling2018-01-29029 January 2018 Request for Review and Approval of Relocation of the Reactor Core Isolation Cooling (RCIC) Injection Point from the Reactor Vessel Head Spray Nozzle to the 'A' Feedwater Line Via the 'A' Residual Heat Removal (RHR) Shutdown Cooling ML17268A2132017-09-21021 September 2017 ISFSI, River Bend Station Unit 1 & ISFSI, Waterford 3 Steam Electric Station & ISFSI, Grand Gulf Nuclear Station & ISFSI, Application for Order Approving Transfers of Licenses and Conforming License Amendments ML17153A2862017-05-31031 May 2017 River Bend Station, Unit 1, License Renewal Application RBG-47735, License Renewal Application - Appendices a Through D2017-05-31031 May 2017 License Renewal Application - Appendices a Through D ML17153A2852017-05-25025 May 2017 License Renewal Application RBG-47630, Resubmittal of License Amendment Request - Cyber Security Plan Implementation Schedule, River Bend Station - Unit 12015-12-0303 December 2015 Resubmittal of License Amendment Request - Cyber Security Plan Implementation Schedule, River Bend Station - Unit 1 RBG-47620, License Amendment Request for Change to Technical Specification; 5.5.13, to Be Extended to 15 Years, Drywell Bypass Test Frequency to 15 Years and Type C Test Frequency to 75 Months2015-10-29029 October 2015 License Amendment Request for Change to Technical Specification; 5.5.13, to Be Extended to 15 Years, Drywell Bypass Test Frequency to 15 Years and Type C Test Frequency to 75 Months RBG-47461, Application for Change to Technical Specification 3.8.1, AC Sources - Operating2014-07-0909 July 2014 Application for Change to Technical Specification 3.8.1, AC Sources - Operating CNRO-2014-00007, ISFSI, Waterford 3 and ISFSI - Application for Order Approving Transfers of Licenses and Conforming License Amendments2014-06-10010 June 2014 ISFSI, Waterford 3 and ISFSI - Application for Order Approving Transfers of Licenses and Conforming License Amendments RBG-47432, License Amendment Request 2013-18 Re Revision of Ultimate Heat Sink Design Capacity2014-02-10010 February 2014 License Amendment Request 2013-18 Re Revision of Ultimate Heat Sink Design Capacity RBG-47382, Heavy Load Movement Over Fuel Assemblies, License Amendment Request 2013-132013-07-29029 July 2013 Heavy Load Movement Over Fuel Assemblies, License Amendment Request 2013-13 RBG-47361, Application for Technical Specification Changes Technical Specification Task Force Improved Standard Technical Specification Change Traveler, TSTF-535, Revise Shutdown Margin Definition to Address Advanced Fuel Designs.2013-07-16016 July 2013 Application for Technical Specification Changes Technical Specification Task Force Improved Standard Technical Specification Change Traveler, TSTF-535, Revise Shutdown Margin Definition to Address Advanced Fuel Designs. RBG-47322, Submittal of Request for Amendment to the Technical Specifications2013-06-13013 June 2013 Submittal of Request for Amendment to the Technical Specifications CNRO-2013-00008, Arkansas, Units 1, 2 & ISFSI, Grand Gulf, ESP and ISFSI, River Bend, Unit 1 and ISFSI and Waterford 3 and ISFSI, Application for Order Approving Transfers of Licenses and Conforming License and ESP Amendments2013-04-16016 April 2013 Arkansas, Units 1, 2 & ISFSI, Grand Gulf, ESP and ISFSI, River Bend, Unit 1 and ISFSI and Waterford 3 and ISFSI, Application for Order Approving Transfers of Licenses and Conforming License and ESP Amendments RBG-47332, Unit 1 - License Amendment Request 2013-01, Battery Surveillance Requirement Acceptance Criteria2013-02-0707 February 2013 Unit 1 - License Amendment Request 2013-01, Battery Surveillance Requirement Acceptance Criteria ML12191A1222012-06-20020 June 2012 License Amendment Request - Cyber Security Plan Implementation Schedule Milestones RBG-47191, Changes to Technical Specification 3.8.1; AC Sources - Operating.2011-12-0808 December 2011 Changes to Technical Specification 3.8.1; AC Sources - Operating. RBG-47072, License Amendment Request 2010-04, Heavy Load Movement Over Fuel Assemblies2010-09-0909 September 2010 License Amendment Request 2010-04, Heavy Load Movement Over Fuel Assemblies RBG-47048, License Amendment Request, Application for Technical Specification Changes Technical Specification Task Force Improvement Standard Technical Specification Change Traveler, TSTF-484, Use of TS 3.10.1 for Scram Time Testing Activities2010-07-22022 July 2010 License Amendment Request, Application for Technical Specification Changes Technical Specification Task Force Improvement Standard Technical Specification Change Traveler, TSTF-484, Use of TS 3.10.1 for Scram Time Testing Activities ML0934801612009-12-0909 December 2009 Submittal of License Amendment Request - Cyber Security Plan RBG-46932, License Amendment Request 2009-05 to Support Operation with 24-Month Fuel Cycles2009-08-10010 August 2009 License Amendment Request 2009-05 to Support Operation with 24-Month Fuel Cycles RBG-46925, License Amendment Request, Technical Specification Change to Revise ASME Code Reference for Inservice Test Requirements2009-06-29029 June 2009 License Amendment Request, Technical Specification Change to Revise ASME Code Reference for Inservice Test Requirements RBG-46926, Unit 1 - Supplement to License Amendment Request (Lar), to Implement Changes Consistent with TSTF-163 on Diesel Generator Surveillance Requirements2009-06-22022 June 2009 Unit 1 - Supplement to License Amendment Request (Lar), to Implement Changes Consistent with TSTF-163 on Diesel Generator Surveillance Requirements ENOC-09-00009, Entergy Nuclear Operations, Inc. - License Amendment Request; Proposed Adoption of TSTF-511 Regarding Elimination of Technical Specification Work Hour Restrictions2009-04-27027 April 2009 Entergy Nuclear Operations, Inc. - License Amendment Request; Proposed Adoption of TSTF-511 Regarding Elimination of Technical Specification Work Hour Restrictions ML0902701982009-01-21021 January 2009 License Amendment Request 2009-01, Application for Technical Specifications (TS) Change to Adopt NRC Approved Generic Changes TSTF-163, TSTF-222, TSTF-230, and TSTF-306 to the Improved Technical Specifications RBG-46870, License Amendment Request (LAR 2008-08) Surveillance Frequency Extension Request2008-12-0808 December 2008 License Amendment Request (LAR 2008-08) Surveillance Frequency Extension Request 2023-07-27
[Table view] |
Text
~Entergy Entergy Operations, Inc.
5485 U.S . Highway 61 N St. Francisville, LA 70775 Jeff W. Reynolds Director, Regulatory Assurance River Bend Station T 91. (225) 635-5000 K&~\-l ~~ O'd40 10 CFR 50.90 RBG-47925 December 20,2018 Attn: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
Subject:
Supplement to Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (TSTF-425)
River Bend Station, Unit 1 NRC Docket No. 50-458 Facility Operating License No. NPF-47
References:
- 1) Entergy Operations, Inc. letter to U. S. Nuclear Regulatory Commission "Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control," dated November 15, 2017. (ML17319A898)
- 2) Entergy Operations, Inc. letter to U. S. Nuclear Regulatory Commission, "Application for Technical Speci'fication Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency requirements to a Licensee Controlled Program (TSTF-425)," dated February 28,2018. (ML18067A115)
- 3) Nuclear Regulatory Commission to Entergy Operations, Inc. "River Bend Station, Unit 1 - Issuance of Amendment RE: Revision to Technical Specifications to Adopt TSTF-S42, Revision 2, Reactor Pressure Vessel Water Inventory Control," dated November 7, 2018. (ML18267A341)
Dear Si r or Madam,
On November 15, 2017 Entergy Operating, Inc. (Entergy) submitted a License Amendment Request (LAR) to adopt Technical Specification Task Force 542 (TSTF-542) at River Bend Station (RBS). (Reference 1)
RSG-47925 Page 2 of 3 On February 28,2018, Entergy submitted an LAR to adopt TSTF-425 at RSS. (Reference 2)
On November 7,2018 the U.S Nuclear Regulatory Commission (NRC) issued Amendment 193 (Reference 3) to the RSS Technical Specifications (TS) approving the implementation of TSTF-542. Issuance of Amendment 193 modified pages to the RSS TS that were submitted to the NRC in the TSTF-425 LAR. This letter supplements the original submittal of TSTF-425 LAR to:
- 1. Include new surveillances added to the RSS TS as a result of Amendment 193.
- 2. Update the text of surveillances whose language was modified as a result of Amendment 193.
- 3. Update the text of Conditions, Required Actions, and Completion Times that were modified by Amendment 193.
- 4. Update changes that were made as a result of TS content moving from one page to another from the addition or deletion of TS content as a result of Amendment 193.
- 5. Update changes to surveillance numbers that were made as a result of Amendment 193.
- 6. Update TS section title changes that were made as a result of Amendment 193.
TS page 3.5-7 of the original TSTF-425 LAR should be discarded. The changes submitted on TS page 3.5-7 have moved to page 3.5-8 as a result of Amendment 193 and are presented in the attachments to this letter.
This supplement letter also corrects an error identified in the original submittal of the TSTF-425 LAR. Page 3.3-4 was mistakenly labeled 3.3-5. The Amendment numbers on page 3.3-4 are also corrected in this supplement letter.
Entergy has determined that relocating the frequency of SRs added to, or modified from, the original TSTF-425 LAR identified in this supplement is consistent with TSTF-425, Revision 3; and with the NRC staffs model Safety Evaluation dated July 6, 2009 including the scope exclusions identified in the model Safety Evaluation.
Specifically, these surveillance frequencies are not:
- 1. Frequencies that reference other approved programs for the specific interval (such as the Inservice Testing Program or the Primary Containment Leakage Rate Testing Program).
- 2. Frequencies that are purely event driven (e.g., "Each time the control rod is withdrawn to the 'full out' position") .
- 3. Frequencies that are event-driven but have a time component for performing the surveillance on a one-time basis once the event occurs (e.g., "within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after thermal power reaching 95% RTP").
RBG-47925 Page 3 of 3
- 4. Frequencies that are related to specific conditions (e.g., battery degradation, age, and capacity) or conditions for the performance of a surveillance requirement (e.g., "drywall to suppression chamber differential pressure decrease").
Changes to the frequency for these surveillances will be controlled under the Surveillance Frequency Control Program (SFCP) in accordance with TSTF-425. The SFCP provides the necessary administrative controls to ensure that surveillances related to testing, calibration, and inspection are conducted at a frequency necessary to assure the quality of systems and components is maintained, that facility operation will be within safety limits, and that the limiting conditions for operation will be met.
Furthermore, TSTF-542 recognizes that the SFCP is acceptable for use in each SR that this supplement identHies as added to, or modified from, the original TSTF-425 LAR. contains a markup of TS pages 'from the original TSTF-425 LAR that were modified by Amendment 193 and the page number correction for TS page 3.3-4. contains the clean TS pages of the original TSTF-425 LAR with Amendment 193 incorporated and the page number correction for TS page 3.3-4.
Entergy has reviewed the information supporting a finding of no significant hazards consideration that was previously provided to the NRC in Reference 2. The information provided in this submittal does not affect the basis for concluding that the proposed license amendment does not involve a significant hazards consideration.
There are no regulatory commitments contained within this letter.
Should you have any questions or require additional information, please contact Timothy Schenk at 225-381-4177 .
Je JWR/twf : Markup of TS Pages from original TSTF-425 LAR. : Clean TS Pages.
cc: NRC Region IV Regional Administrator, w/o Enclosure NRC Senior Resident Inspector - River Bend Station, Unit 1 Ji Young Wiley, Department of Environmental Quality, Office of Environmental Compliance, Radiological Emergency Planning and Response Section Public Utility Commission of Texas, Attn: PUC Filing Clerk NRC Project Manager
AITACHMENTI Markup of TS Pages from original TSTF-425 lAR
RPS Instrumentation 3.3.1.1 SURVEILLANCE REQUIREMENTS (continued)
SURVEILLANCE FREQUENCY SR 3.3.1.1.4 ----------------- ----------- --I\J 0 T E----------------------------
Not required to be periormed when entering MODE 2 from MODE 1 until 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after entering MODE 2.
Periorm CHANNEL FUNCTIONAL TEST. In accordance with the Surveillance Frequency Control Program SR 3.3.1.1 .5 Periorm CHANNEL FUNCTIONAL TEST. In accordance with the Surveillance Frequency Control Program SR 3.3.1.1.6 Verify the source range monitor (SRM) and Prior to intermediate range monitor (IRM) channels withdrawing SRMs overlap. from the fully inserted position SR 3.3.1.1.7 -------- -- ------- -- -- ------- -- NOT E--------- -- ----- -- -- -- -- ----
Only required to be met during entry into MODE 2 from MODE 1.
Verify the IRM and APRM channels overlap. In accordance with the Surveillance Frequency Control Program SR 3.3.1.1.8 Calibrate the local power range monitors. In acco rdance with the Surveillance Frequency Control Program (continued)
~ 1110IlT I RIVER BEND 3.3-5 Amendment No. 81 106 114, 1-68 I
RCIC System Instrumentation 3.3.5.3 SURVEILLANCE REQUIREMENTS
NOT E S -----------------------------------------------------------
- 1. Refer to Table 3.3.5.3-1 to determine which SRs apply for each RCIC Function.
- 2. When a channel is placed in an inoperable status solely for performance of required Surveillances, entry into associated Conditions and Required Actions may be delay.ed as follows: (a) for up to 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> for Functions 2 and 5; and (b) for up to 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> for Functions 1, 3, and 4 provided the associated Function maintains RCIC initiation capability.
SURVEILLANCE FREQUENCY SR 3.3.5.3 .1 Perform CHANNEL CHECK. f.2.
SR 3.3.5.3.2 Perform CHANNEL FUNCTIONAL TEST. 92 says .-.../
SR 3.3.5 .3.3 Calibrate the trip units. 92 says ./
SR 3.3.5.3.4 Perform CHANNEL CALIBRATION . ~ "-
SR 3.3.5.3.5 Perform LOGIC SYSTEM FUNCTIONAL TES T . 24-ffi*cmifls ./
In accordance with the Surveillance Frequency Control Program RIVER BEND 3.3-46 Amendment No . 81 , 168, f-9.3 I
RPV Water Inventory Control 3.5.2 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.5.2.1 Verify DRAIN TIME is ~ 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />.
SR 3.5.2.2 Verify, for a required low pressure ECCS ~eHFS ./
injection/spray subsystem, the suppression po 01 water level is ~ 13 ft 3 inches.
SR 3.5.2 .3 Verify, for the required High Pressure Core Sp ray 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> L (HPCS) System, the:
- a. Suppression pool water level is ~ 13 ft 3 in ches; or
- b. Condensate storage tank water level is ~ 1 1 ft 1 inch.
SR 3.5.2.4 Verify, for the required ECCS injection/spray 31- Gays ./
subsystem, locations susceptible to gas accumulation are sufficiently filled with water.
SR 3.5.2.5 -------------------------------NOT ES-----------------------------
- 1. A low pressure coolant injection (LPCI) subsystem may be considered OPERABLE during alignment and operation for decay h eat removal, if capable of being manually realigned and not otherwise inoperable.
- 2. Not required to be met for system vent flow paths opened under administrative control.
Verify, for the required ECCS injection/spray 34-Gays
./
subsystem, each manual, power operated, and automatic valve in the flow path, that is not loc ked, sealed, or otherwise secured in position, is in t he correct position.
(continued)
In accordance with the Surveillance Frequency 1-Control Program RIVER BEND 3.5-8 Amendment No. &i, ~, 493 I
RPV Water Inventory Control 3.5.2 SURVEILLANCE REQUIREMENTS (continued SURVEILLANCE FREQUENCY SR 3.5.2.6 Operate the required ECCS injection/spray 92-.. aays ~
subsystem for ~ 10 minutes SR 3.5.2.7 Verify each valve credited for automatically isolating 24 Ffl8AtAS ./
a penetration flow path actuates to the isolation "
position on an actual or simulated actuation signal.
SR 3.5.2.8 -----------------------------NOT E--------------------------------
Vessel injection/spray may be excluded.
Verify the required LPCI or LPCS subsystem 24 Ffl8AtAS ",.,-
actuates on a manual initiation signal, or the required HPCS subsystem can be manually operated.
In accordance with the Surveillance Frequency Control Program RIVER BEND 3.5-9 Amendment No. 3-i, +98, 4e.3 I
CRFA System 3.7.2 ACTIOI\JS (continued)
CONDITION REQUIRED ACTION COMPLETION TIME F. Two CRFA subsystems F.1 Suspend movement of recently Immediately inoperable during irradiated fuel assemblies in the movement of recently primary containment and fuel irradiated fuel assemblies building.
in the primary containment or fuel building.
One or more CRFA subsystems inoperable due to inoperable CRE boundary during movement of recently irradiated fuel assemblies in the primary containment or fuel building .
SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.7.2.1 Operate each CRFA subsystem f or z 15 continuous 31-eay-s /"
minutes.
SR 3.7.2.2 Perform required CRFA filter testi ng in accordance In accordance with with the Ventilation Filter Testing Program (VFTP). the VFTP SR 3.7.2.3 Verify each CRFA subsystem act uates on an actual 24-fHSA-tAs ./
or simulated initiation signal.
(continued)
In accordance with the Surveillance Frequency Control Program RIVER BEND 3.7-7 Amendment No. 81 119 132 154
~~~49d I
Control Room AC System 3.7.3 ACTIONS (continued)
CONDITION REQUIRED ACTION COMPLETION TIME E. Required Action and E.1 Suspend movement of recently Immediately associated Completion irradiated fuel assemblies in the Time of Condition B not primary containment and fuel met during movement of building.
recently irradiated fuel assemblies in the primary containment or fuel building.
SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.7.3.1 Verify each control room AC subsystem has the 24 FR9R#ls <
capability to remove the assumed heat load.
In accordance with the Surveillance Frequency Control Program RIVER BEND 3.7-11 Amendment No. 81 119 132 , ~, +W
Inve rters-S h utdown 3.8.8 ACTIOI\JS CONDITION REQUIRED ACTION COMPLETION TIME A. (continued) A.2.3 Initiate action to restore Immediately required inverters to OPERABLE status.
SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.8.8.1 Verify correct inverter voltage, frequency, and 1-aays ./
alignments to required AC vital buses.
In accordance with the Surveillance Frequency Control Program RIVER BEND 3.8-37 Amendment No. 84-, 1-9-3 I
Distribution Systems-Shutdown 3.8.10 ACTIONS (continued)
CONDITION REQUIRED ACTION COMPLETION TIME A. (continued) A.2.3 Initiate actions to restore Immediately required AC, DC, and AC vital bus electrical power distribution subsystems to OPERABLE status.
A.2.4 Declare associated required shutdown cooling Immediately subsystem(s) inoperable and not in operation.
SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.8.10.1 Verify correct breaker alignments and voltage to 7 days /'
required AC, DC, and AC vital bus electrical power distribution subsystems.
In accordance with the Surveillance Frequency Control Program RIVER BEND 3.8-42 Amendment No . S+, +B-3 I
ATTACHMENT 2 Clean T5 Pages
RPS Instrumentation 3.3.1.1 SURVEILLANCE REOUIREMEI\ITS (continued)
SURVEILLANCE FREOUEI\JCY SR 3.3.1.1.4 ------------------------------ NOT E----------------------------
Not required to be performed when entering MODE 2 from MODE 1 until 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after entering MODE 2.
Perform CHANNEL FUNCTIONAL TEST. In accordance with the Surveillance Frequency Control Program SR 3.3.1.1 .5 Perform CHANNEL FUNCTIONAL TEST. In accordance with the Surveillance Frequency Control Program SR 3.3.1.1.6 Verify the source range monitor (SRM) and Prior to intermediate range monitor (I RM) channels withdrawing SRMs overlap. from the fully inserted position SR 3.3.1.1.7 ------------------------------ NOT E--- ----------------- --------
Only required to be met during entry into MODE 2 from MODE 1.
Verify the IRM and APRM channels overlap. In accordance with the Surveillance Frequency Control Program SR 3.3.1.1.8 Calibrate the local power range monitors. In accordance with the Surveillance Frequency Control Program (continued)
RIVER BEND 3.3-4 Amendment No. 8+, -+00, .we, +W, ++4,
RCIC System Instrumentation 3.3.5.3 SURVEILLANCE REQUIREMENTS
NOT ES -----------------------------------------------------------
- 1. Refer to Table 3.3.5.3-1 to determine which SRs apply for each RCIC Function.
- 2. When a channel is placed in an inoperable status solely for performance of required Surveillances, entry into associated Conditions and Required Actions may be delayed as follows: (a) for up to 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> for Functions 2 and 5; and (b) for up to 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> for Functions 1, 3, 'and 4 provided the associated Function maintains RCIC initiation capability.
SURVEILLANCE FREQUENCY SR 3.3.5 .3.1 Perform CHANNEL CHECK. In accordance with the Surveillance Frequency Control Program SR 3.3.5.3.2 Perform CHANNEL FUNCTIONAL TEST. In accordance with the Surveillance Frequency Control Program SR 3.3.5.3.3 Calibrate the trip units. In accordance with the Surveillance Frequency Control Program SR 3.3.5.3.4 Perform CHANNEL CALIBRATION. In accordance with the Surveillance Frequency Control Program SR 3.3.5.3.5 Perform LOGIC SYSTEM FUNCTIONAL TEST. In accordance with the Surveillance Frequency Control Program RIVER BEND 3.3-46 Amendment No. 81, 168, +9J I
RPV Water Inventory Control 3.5.2 SURVEILLANCE REQUIREIVIENTS SURVEILLANCE FREQUENCY SR 3.5.2.1 Verify DRAIN TIME is 2: 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />. In accordance with the Surveillance Frequency Control Program SR 3.5.2.2 Verify, for a required low pressure ECCS In accordance with injection/spray subsystem, the suppression pool the Surveillance water level is ~ 13 ft 3 inches. Frequency Control Program SR 3.5.2.3 Verify, for the required High Pressure Core Spray In accordance with (HPCS) System, the: the Surveillance Frequency Control
- a. Suppression pool water level is ~ 13 ft 3 inches; Program or
- b. Condensate storage tank water level is ~ 11 ft 1 inch.
SR 3.5.2.4 Verify, for the required ECCS injection/spray In accordance with subsystem, locations susceptible to gas the Surveillance accumulation are sufficiently 'filled with water. Frequency Control Program SR 3.5.2.5 ------------------- ------------ NOT E S-----------------------------
- 1. A low pressure coolant injection (LPCI) subsystem may be considered OPERABLE during alignment and operation for decay heat removal, if capable of being manually realigned and not otherwise inoperable.
- 2. Not required to be met for system vent flow paths opened under administrative control.
Verify, for the required ECCS injection/spray In accordance with subsystem, each manual, power operated, and the Surveillance automatic valve in the flow path, that is not locked, Frequency Control sealed, or otherwise secured in position, is in the Program correct position .
(continued)
RIVER BEND 3.5-8 Amendment No. &+, +88, +9d I
RPV Water Inventory Control 3.5.2 SURVEILLANCE REQUIREMENTS (continued)
SURVEILLANCE FREQUENCY SR 3.5.2.6 Operate the required ECCS injection/spray In accordance with subsystem for 2: 10 minutes. the Surveillance Frequency Control Program SR 3.5.2.7 Verify each valve credited for automatically isolating In accordance with a penetration flow path actuates to the isolation the Surveillance position on an actual or simulated actuation signal. Frequency Control Program SR 3.5.2.8 ----------------------------- N0 -r E-- ------------------------------
Vessel injection/spray may be excluded.
Verify the required LPCI or LPCS subsystem In accordance with actuates on a manual initiation signal, or the required the Surveillance HPCS subsystem can be manually operated. Frequency Control Program RIVER BEND 3.5-9 Amendment No. &+, -+@, ~
CRFA System 3.7.2 ACTIONS (continued)
CONDITION REQUIRED ACTION COMPLETION TIME F. Two CRFA subsystems F.1 Suspend movement of recently Immediately inoperable during irradiated fuel assemblies in the movement of recently primary containment and fuel irradiated fuel assemblies building.
in the primary containment or fuel building.
OR One or more CRFA subsystems inoperable due to inoperable CRE boundary during movement of recently irradiated fuel assemblies in the primary containment or fuel building.
SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.7.2.1 Operate each CRFA subsystem for ~ 15 continuous In accordance with minutes. the Surveillance Frequency Control Program SR 3.7.2.2 Peliorm required CRFA filter testing in accordance In accordance with with the Ventilation Filter Testing Program (VFTP). the VFTP SR 3.7.2.3 Verify each CRFA subsystem actuates on an actual In accordance with or simulated initiation signal. the Surveillance Frequency Control Program (continued)
RIVER BEND 3.7-7 Amendment No. 81 11 9 132 154 I
+ea +e8, ~ 9d
Control Room AC System 3.7.3 ACTIONS (continued)
CONDITION REQUIRED ACTION COMPLETION TIME E. Required Action and E.1 Suspend movement of recently Immediately associated Completion irradiated fuel assemblies in the Time of Condition B not primary containment and fuel met during movement of building.
recently irradiated fuel assemblies in the primary containment or fuel building.
SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.7.3.1 Verify each control room AC subsystem has the In accordance with capability to remove the assumed heat load. the Surveillance Frequency Control Program RIVER BEND 3.7-11 Amendment No. 81 11 9 132, +W, +9d I
Inverters-Shutdown 3.8.8 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. (continued) A.2.3 Initiate action to restore Immediately required inverters to OPERABLE status.
SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.8.8.1 Verify correct inverter voltage, frequency, and In accordance with alignments to required AC vital buses. the Surveillance Frequency Control Program RIVER BEt\ID 3.8-37 Amendment No. ~, +9d I
Distribution Systems-Shutdown 3.8.10 ACTIONS (continued)
CONDITION REQUIRED ACTION COMPLETION TIME A. (continued) A.2.3 Initiate actions to restore Immediately required AC, DC, and AC vital bus electrical power distribution subsystems to OPERABLE status.
AND A.2.4 Declare associated required shutdown cooling Immediately subsystem(s) inoperable and not in operation.
SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.8.10.1 Verify correct breaker alignments and voltage to In accordance with required AC, DC, and AC vital bus electrical power the Surveillance distribution subsystems. Frequency Control Program RIVER BEND 3.8-42 Amendment No. 8+, +9a