ML20076D901
Person / Time
Site: Hatch, Vogtle, Farley  Southern Nuclear icon.png
Issue date: 03/16/2020
From: Gayheart C
Southern Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NL-20-0265
Download: ML20076D901 (10)


Text

3535 Colonnade Parkway A Southern Nuclear Cheryl A. Gayheart Regulatory Affairs Director Birmingham , AL 35243 205 992 5316 cagayhea @southernco.com MAR 16 2020 Docket Nos.: 50-321 50-348 50-424 52-025 NL-20-0265 50-366 50-364 50-425 52-026 U. S. Nuclear Regulatory Commission ATTN : Document Control Desk Washington, D. C. 20555-0001 Joseph M. Farley Nuclear Plant- Units 1&2 Edwin I. Hatch Nuclear Plant- Units 1&2 Vogtle Electric Generating Plant- Units 1&2 Vogtle Electric Generating Plant- Units 3&4 SNC Response to Regulatory Issue Summary 2020-01:

Preparation and Scheduling of Operator Licensing Examinations Ladies and Gentlemen:

On February 19, 2020, the Nuclear Regulatory Commission (NRC) issued Regulatory Issue Summary (RIS) 2020-01, "Preparation and Scheduling of Operator Licensing Examinations." RIS 2020-01 requests that licensees voluntarily submit projections of their site-specific operator licensing examination schedules as well as the estimated number of applicants planning to take operator licensing and generic fundamental examinations for years 2022-2025.

Southern Nuclear Operating Company (SNC) hereby provides as enclosures to this letter the requested information on NRC form 536 for Joseph M. Farley Nuclear Plant- Units 1&2, Edwin I. Hatch Nuclear Plant- Units 1&2 , Vogtle Electric Generating Plant - Units 1&2, and Vogtle Electric Generating Plant- Units 3&4. The estimates provided represent SNC's current understanding , but are subject to possible change in the future. These enclosures supersede previous, similar RIS responses.

This letter contains no NRC commitments. If you have any questions, please contact Matt Euten at 205.992.7673.

Respectfully submitted, CAG/kmo/scm

U. S. Nuclear Regulatory Commission NL-20-0265 Page 2 Enclosures :

1. NRC Form 536, Operator Licensing Examination Data for Joseph M. Farley Nuclear Plant- Units 1&2
2. NRC Form 536 , Operator Licensing Examination Data for Edwin I. Hatch Nuclear Plant- Units 1&2
3. NRC Form 536 , Operator Licensing Examination Data for Vogtle Electric Generating Plant- Units 1&2
4. NRC Form 536 , Operator Licensing Examination Data for Vogtle Electric Generating Plant- Units 3&4 cc: Regional Administrator, Region II NRR Project Manager - Farley , Hatch , Vogtle 1&2 Senior Resident Inspector- Farley, Hatch, Vogtle 1&2, Vogtle 3&4 RType : CGA02 .001 Vogtle 3&4 RType: VND.LI.LOO File AR.01 .02 .06

Joseph M. Farley Nuclear Plant- Units 1&2 Edwin I. Hatch Nuclear Plant- Units 1&2 Vogtle Electric Generating Plant- Units 1&2 Vogtle Electric Generating Plant - Units 3&4 SNC Response to Regulatory Issue Summary 2020-01:

Preparation and Scheduling of Operator Licensing Examinations Enclosure 1 NRC Form 536, Operator Licensing Examination Data for Joseph M. Farley Nuclear Plant- Units 1&2

NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 11/30/2020 (11-2017) tJ>l\REQ(I<

~vv *~0 Estimated burden per response to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This

/¥ ~4<6 OPERA TOR LICENSING information collection is used to plan budgets and resources fo r operator examinations. Send comments regarding burden estimate to the Information Services Branch (T-2 F43), U.S. Nuclear
~-So

0~

EXAMINATION DATA Regulatory Commission, Washington, DC20555-000 1, or by e-mail to lnfocollects.Resource@nrc.gov.

Q ~

and to th e Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0131), OffiCe of Management and Budgel Washington, DC 20503. If a means used to impose an informatio n collection does not d~play a currently valid OMB control number, the NRC may not conduct or sponsor, and a person ~ not required to respond to, the information collection.

FACILITY NRC REGION Joseph M. Farley Nuclear Plants- Units 1 and 2 I~ I A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2022 CY 2023 CY 2024 cy2025 ESTIMATED NUMBER OF LICENSEE-PREPARED I 0 1 0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2022 CY 2023 CY2024 CY2025 NUMBER OF REACTOR OPERATORS 8 0 8 0 NUMBER OF SENIOR REACTOR OPERATORS -INSTANT 8 0 8 0 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 2 0 2 0 NUMBER OF SENIOR REACTOR OPERATORS- LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE 12/5/22 N/A 6/10/24 N/A ALTERNATE DATE 12/12/22 N/A 6/17/24 N/A NRC FORM 536 (11 -201 7)

Joseph M. Farley Nuclear Plant- Units 1&2 Edwin I. Hatch Nuclear Plant- Units 1&2 Vogtle Electric Generating Plant- Units 1&2 Vogtle Electric Generating Plant- Units 3&4 SNC Response to Regulatory Issue Summary 2020-01:

Preparation and Scheduling of Operator Licensing Examinations Enclosure 2 NRC Form 536, Operator Licensing Examination Data for Edwin I. Hatch Nuclear Plant- Units 1 &2

NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OM S: NO. 3150 *0131 EXPIRES: 11/30/2020 (1 1-2017)

  • ~*..

Estimated burden per respo nse to comply with this voluntary information ccllection request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This

  • ' 00 OPERATOR LICENSING info rmation collection is used to plan budgets and resources for operator examinations. Send comments regarding burd en estimate to the Information Services Branch (T -2 F43), U.S. Nucle ar

~ ~ I; EXAMINATION DATA Regulatory Commission, Washington, DC20555-0001. or by e-mail to lnlocollects.Resource@nrc.gov,

'--s-

~

01 and to the Desk O ff~eer, Office of Information and Regulato ry Affairs, NEOB-10202, (3150*0131), Office

... . * .. of Management and Budget, Washington, DC 20503. II a means used to impose an information collection does not display a currently valid OMB central number, the NRC may not cc nduct or sponsor, and a person is not required to respond to, the information collection.

FACILITY NRC REGION IEDWIN I. HATCH NUCLEAR PLANTS . UNITS 1&2 11 11 I A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2022 CY 2023 CY 2024 cy2025 ESTIMATED NUMBER OF LICENSEE-PREPARED 0 I 0 1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2022 CY2023 CY 2024 CY 2025 NUMBER OF REACTOR OPERATORS 0 8 0 8 NUMBER OF SENIOR REACTOR OPERATORS - INSTANT 0 8 0 8 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 0 2 0 2 NUMBER OF SENIOR REACTOR OPERATORS- LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE N/A 11 /27/2023 N/A 12/01 /2025 ALTERNATE DATE N/A 12/04/2023 N/A 12/08/2025 NRC FORM 536 (11-20 17)

Joseph M. Farley Nuclear Plant- Units 1&2 Edwin I. Hatch Nuclear Plant- Units 1&2 Vogtle Electric Generating Plant- Units 1&2 Vogtle Electric Generating Plant- Units 3&4 SNC Response to Regulatory Issue Summary 2020-01:

Preparation and Scheduling of Operator Licensing Examinations Enclosure 3 NRC Form 536, Operator Licensing Examination Data for Vogtle Electric Generating Plant- Units 1&2

NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 11/30/2020 (11-2017)

~P.. A fou,

~co ,." Estimated burden per response to comply w~h this voluntary info1111ation collection request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This

~

l~~~?

0 OPERATOR LICENSING info1111ation collection is used to plan budgets and resou rces for operator examinations. Send comments regarding burden estimate to the Informatio n Services Branch (T-2 F43), U.S. Nuclear

~~..... l

~ +

EXAMINATION DATA Regulatory Commission, Washington, DC20555-000 1, or by e-mail to lnfocollects.Resource@nrc.gov, and to the Desk Officer, Office of lnfo1111ation and Regulatory Affairs, NEOB-10202, (3150-0131 ), Office of Management and Budget, Washington, DC 20503. If a means used to impose an info1111ation collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the info1111ation collection.

FACILITY NRC REGION VOGTLE ELECTRIC GENERATING PLANT - UNITS 1&2 I~ I A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2022 CY 2023 CY 2024 cv202s ESTIMATED NUMBER OF LICENSEE-PREPARED 0 I I 0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2022 CY 2023 CY 2024 CY 2025 NUMBER OF REACTOR OPERATORS 0 8 6 0 NUMBER OF SENIOR REACTOR OPERATORS - INSTANT 0 6 6 0 NUMBER OF SENIOR REACTOR OPERATORS - UPGRADE 0 4 4 0 NUMBER OF SENIOR REACTOR OPERATORS - LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE N/A 04/24/2023 I 0/2112024 N/A ALTERNATE DATE N/A 05/22/2023 11/ 18/2024 N/A NRC FORM 536 (1 1-2017)

Joseph M. Farley Nuclear Plant- Units 1&2 Edwin I. Hatch Nuclear Plant- Units 1&2 Vogtle Electric Generating Plant- Units 1&2 Vogtle Electric Generating Plant- Units 3&4 SNC Response to Regulatory Issue Summary 2020-01:

Preparation and Scheduling of Operator Licensing Examinations Enclosure 4 NRC Form 536, Operator Licensing Examination Data for Vogtle Electric Generating Plant- Units 3&4

NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150*0131 EXPIRES : 11/30/2020

  • ¥%

(1 1-2017)

""'fl REGut Estimated burden per response to comply with this voluntary inform ation collection request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This

~ 0 OPERA TOR LICENSING information collection is used to plan budgets and resources for operator examinations. Send

  • 0 comments regarding burden estimate to the Informatio n Services Branch (T-2 F43), U.S. Nuclear

~~~

i; EXAMINATION DATA Regulatory Commission, Washing ton, DC20555-0001, or by e-mail to lnfocollecls.Resource@nrc.gov,

~"'.., t-0~ and to the Desk Officer, Office or Information and Regulatory Affairs, NEOB-1 0202, (3150-013 1). Office

          • of Management and Budget, Washington, DC 20503. If a means used to impose an information collection does not display a currently valid OMB control number. the NRC may not conduct or sponsor, and a person is not required to respond to, the Information collection.

FACILITY NRC REGION VOGTLE ELECTRIC GENERATING PLANT- UNITS 3&4 I~ I A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2022 CY 2023 CY 2024 cy 2025 ESTIMATED NUMBER OF LICENSEE-PREPARED I 0 I 0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAM INATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2022 CY2023 CY2024 CY 2025 NUMBER OF REACTOR OPERATORS 9 0 6 0 NUMBER OF SEN IOR REACTOR OPERATORS -INSTANT 5 0 4 0 NUMBER OF SENIOR REACTOR OPERATORS - UPGRADE 2 0 2 0 NUMBER OF SENIOR REACTOR OPERATORS- LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE 03/2 1/2022 N/A 03/ 18/2024 N/A ALTERNATE DATE 04/ 18/2022 N/A 0411 5/2024 N/A NRC FORM 536 (1 1-201 7)