MONTHYEARBSEP-99-0170, Forwards Proprietery Notification of Change in Operator Status.Individual Name,Docket Number,License Number & Effective Date of Expiration,Encl.Proprietary Info Withheld, Per 10CFR2.790(a)(6)1999-10-19019 October 1999 Forwards Proprietery Notification of Change in Operator Status.Individual Name,Docket Number,License Number & Effective Date of Expiration,Encl.Proprietary Info Withheld, Per 10CFR2.790(a)(6) BSEP-99-0161, Submits Response to NRC RAI Re Relief Request VRR-03.VRR-03 Requested Relief from full-stroke Open Exercise Requirements for Supply Check Valves to air-operated Valves 1(2)-RNA-V313,1(2)-RNA-V314,1(2)-RNA-V350 & 1(2)-RNA-V3511999-10-13013 October 1999 Submits Response to NRC RAI Re Relief Request VRR-03.VRR-03 Requested Relief from full-stroke Open Exercise Requirements for Supply Check Valves to air-operated Valves 1(2)-RNA-V313,1(2)-RNA-V314,1(2)-RNA-V350 & 1(2)-RNA-V351 ML20217G1191999-10-0808 October 1999 Informs That on 990930,NRC Staff Completed mid-cycle PPR of Brunswick NPP & Did Not Identify Any Areas Where Performance Warranted More than Core Insp Program.Nrc Plan to Conduct Only Core Insps at Facility Over Next Five Months ML20217C6931999-10-0606 October 1999 Forwards Insp Repts 50-324/99-06 & 50-325/99-06 on 990801- 0911 at Brunswick Reactor Facility.No Violations Were Identified BSEP-99-0114, Forwards Supplemental Biological Assessment Submitted by CP&L Providing Updated Data for 1998 & 1999. Pictures of Intake Canal at Diversion Structure During High Tide Conditions Also Encl1999-10-0404 October 1999 Forwards Supplemental Biological Assessment Submitted by CP&L Providing Updated Data for 1998 & 1999. Pictures of Intake Canal at Diversion Structure During High Tide Conditions Also Encl BSEP-99-0157, Submits Annual Rept Summarizing Effect of Changes & Errors in Accepted loss-of-coolant Accident ECCS Evaluation Models Applicable to Bsep,Units 1 & 2 IAW 10CFR50.46(a)(3)(ii)1999-10-0404 October 1999 Submits Annual Rept Summarizing Effect of Changes & Errors in Accepted loss-of-coolant Accident ECCS Evaluation Models Applicable to Bsep,Units 1 & 2 IAW 10CFR50.46(a)(3)(ii) BSEP-99-0142, Forwards Proprietary Updated List of Home Addresses for Individuals Licensed to Operate CP&L Bsep,Units 1 & 2. Proprietary Info Withheld,Per 10CFR2.790(a)(6)1999-09-23023 September 1999 Forwards Proprietary Updated List of Home Addresses for Individuals Licensed to Operate CP&L Bsep,Units 1 & 2. Proprietary Info Withheld,Per 10CFR2.790(a)(6) BSEP-99-0158, Provides Proprietary Notification of Change in Operator Status.Individual Name,Docket Number,License & Effective Date of Expiration Provided in Encl to Ltr.Proprietary Info Withheld,Per 10CFR2.790(a)(6)1999-09-21021 September 1999 Provides Proprietary Notification of Change in Operator Status.Individual Name,Docket Number,License & Effective Date of Expiration Provided in Encl to Ltr.Proprietary Info Withheld,Per 10CFR2.790(a)(6) BSEP-99-0153, Forwards Monthly Operating Repts for Brunswick Steam Electric Plant,Units 1 & 2.CP&L Is Submitting Encl Rept of Operating Statistics & SD Experience for Aug 19991999-09-14014 September 1999 Forwards Monthly Operating Repts for Brunswick Steam Electric Plant,Units 1 & 2.CP&L Is Submitting Encl Rept of Operating Statistics & SD Experience for Aug 1999 BSEP-99-0147, Forwards Response to NRC Telcon RAI Re Relief Requests RR-5, 12,13,14,22,23,24 & 25,per Inservice Insp Program for Third 10-yr Interval1999-09-14014 September 1999 Forwards Response to NRC Telcon RAI Re Relief Requests RR-5, 12,13,14,22,23,24 & 25,per Inservice Insp Program for Third 10-yr Interval BSEP-99-0151, Notifies NRC That Unit 1 Digtial FW Control Sys Upgrade Was Completed on 990831 During Plant Sd.Action Completes Y2K Remediation Activities for BSEP1999-09-0808 September 1999 Notifies NRC That Unit 1 Digtial FW Control Sys Upgrade Was Completed on 990831 During Plant Sd.Action Completes Y2K Remediation Activities for BSEP BSEP-99-0149, Forwards Two Proprietary License Renewal Applications Consisting of NRC Form 398 & NRC Form 396,for Operators Licensed at Plant.Proprietary Encls Withheld1999-09-0202 September 1999 Forwards Two Proprietary License Renewal Applications Consisting of NRC Form 398 & NRC Form 396,for Operators Licensed at Plant.Proprietary Encls Withheld BSEP-99-0150, Forwards Proprietary Info Re Positive Drug Test for Operator Licensed on CP&L Bsep,Units 1 & 2,in Response to NRC .Proprietary Info Withheld,Per 10CFR2.790(a)(6)1999-09-0202 September 1999 Forwards Proprietary Info Re Positive Drug Test for Operator Licensed on CP&L Bsep,Units 1 & 2,in Response to NRC .Proprietary Info Withheld,Per 10CFR2.790(a)(6) BSEP-99-0112, Forwards Summary of Exam Results for Feedwater Sparger & Nozzle Exams Performed During RFO13.Evaluation of Exam Results Documented in ESR 98-00333, Unit 2 Feedwater Sparger Evaluation Based on B214R1 IVVI Exam Results, Encl1999-09-0101 September 1999 Forwards Summary of Exam Results for Feedwater Sparger & Nozzle Exams Performed During RFO13.Evaluation of Exam Results Documented in ESR 98-00333, Unit 2 Feedwater Sparger Evaluation Based on B214R1 IVVI Exam Results, Encl ML20211K9001999-08-27027 August 1999 Forwards Insp Repts 50-324/99-05 & 50-325/99-05 on 990620-0731.Two Violations Occurred & Being Treated as NCVs BSEP-99-0146, Forwards Revised EPIPs for Bsep,Units 1 & 2.List of Revised Procedures & Summary of Changes Are Encl1999-08-26026 August 1999 Forwards Revised EPIPs for Bsep,Units 1 & 2.List of Revised Procedures & Summary of Changes Are Encl BSEP-99-0148, Forwards Rev 0 to NF-908.03, Brunswick Unit 2,Cycle 14 Neutronics Startup Rept, IAW Section 13.4.2.1 of UFSAR for Brunswick Steam Electric Plant,Units 1 & 21999-08-25025 August 1999 Forwards Rev 0 to NF-908.03, Brunswick Unit 2,Cycle 14 Neutronics Startup Rept, IAW Section 13.4.2.1 of UFSAR for Brunswick Steam Electric Plant,Units 1 & 2 BSEP-99-0141, Forwards Proprietary Info Re Expiration of Operator Licenses SOP-20812-1,OP-20977-1 & OP-21217,per 10CFR50.74(b) Re Notification of Changes in Operator Status.Proprietary Info Withheld,Per 10CFR2.790(a)(6)1999-08-25025 August 1999 Forwards Proprietary Info Re Expiration of Operator Licenses SOP-20812-1,OP-20977-1 & OP-21217,per 10CFR50.74(b) Re Notification of Changes in Operator Status.Proprietary Info Withheld,Per 10CFR2.790(a)(6) BSEP-99-0130, Requests Relief from ASME Boiler & Pressure Vessel Code, Section Xi,Iaw 10CFR50.55a(g)(5)(iii) & NRC GL 90-05, Guidance for Performing Temporary Non-Code Repair of ASME Code Class 1,2 & 3 Piping. Regulatory Commitments,Encl1999-08-25025 August 1999 Requests Relief from ASME Boiler & Pressure Vessel Code, Section Xi,Iaw 10CFR50.55a(g)(5)(iii) & NRC GL 90-05, Guidance for Performing Temporary Non-Code Repair of ASME Code Class 1,2 & 3 Piping. Regulatory Commitments,Encl BSEP-99-0132, Requests Delay in Providing Update on Util Intended Actions Re GL 96-06,until 180 Days After NRC Approval of Generic Technical Basis.List of Regulatory Commitments,Encl1999-08-20020 August 1999 Requests Delay in Providing Update on Util Intended Actions Re GL 96-06,until 180 Days After NRC Approval of Generic Technical Basis.List of Regulatory Commitments,Encl BSEP-99-0134, Forwards Monthly Operating Repts for July 1999 for BSEP, Units 1 & 2.Revised Rept for June 1999 for Unit 2,reflecting Info on 990628 Forced Shutdown of Plant,Encl1999-08-13013 August 1999 Forwards Monthly Operating Repts for July 1999 for BSEP, Units 1 & 2.Revised Rept for June 1999 for Unit 2,reflecting Info on 990628 Forced Shutdown of Plant,Encl ML20210S9061999-08-11011 August 1999 Informs That GE Document Entitled, Addl Info Regarding 1.09 Cycle Specific SLMCPR for Brunswick Unit 1 Cycle 12, Will Be Withheld from Public Disclosure Pursuant to 10CFR2.790(b)(5) & Section 103(b) of Atomic Energy Act BSEP-99-0128, Forwards Revised Relief Request RR-17,applicable to Remainder of Third 10-year ISI Program for Plant1999-08-11011 August 1999 Forwards Revised Relief Request RR-17,applicable to Remainder of Third 10-year ISI Program for Plant ML20210S9121999-08-11011 August 1999 Informs That Document NEDC-31624P,Suppl 2,Rev 6,entitled, Loss-Of-Coolant Accident Analysis Rept for Brunswick Steam Electric Plant Unit 2,Reload 13,Cycle 14 Will Be Withheld from Public Disclosure Pursuant to 10CFR2.790(b)(5) ML20210P8221999-08-11011 August 1999 Advises That Info Contained in Which Submitted Document,Prepared by Siemens Power Corp,EMF-2168(P) Rev 0, Marked Proprietary,Will Be Withheld from Public Disclosure, Per 10CFR2.790(b)(5) & Section 103(b) of AEA of 1954 ML20210P9381999-08-10010 August 1999 Forwards SE Accepting Licensee & Suppls & 0517,which Submitted Assessment of Impact on Operation of Unit 1 with Crack Indications of 2.11, 6.36 & 1.74 Inches in Three Separate Jet Pump Risers ML20210P8911999-08-10010 August 1999 Forwards SE Authorizing Relief Requests CIP-01,02,06,07,08, 09,10,11 (with Certain Exceptions) & 12-18,for Second 10-year ISI Interval.Requests CIP-04 & 05 Would Result in Hardship,Relief CIP-03 Not Required & CIP-11 Denied in Part BSEP-99-0110, Forwards Rev 0 to ESR 99-00279, B214R1 RPV Hydrotest Bolted Connection Corrective Action Evaluation, IAW Subparagraph IWB-3144(b) of 1989 Edition of ASME B&PV Code, Section XI1999-08-0505 August 1999 Forwards Rev 0 to ESR 99-00279, B214R1 RPV Hydrotest Bolted Connection Corrective Action Evaluation, IAW Subparagraph IWB-3144(b) of 1989 Edition of ASME B&PV Code, Section XI BSEP-99-0123, Forwards Rev 54 to Radiological Emergency Response Plan (RERP) & Revised Epips,Including Re 44 to OPEP-02.1,rev 4 to OPEP-02.1.1 & Rev 7 to OPEP-02.6.26.Summary of Changes Provided in Encl 21999-08-0505 August 1999 Forwards Rev 54 to Radiological Emergency Response Plan (RERP) & Revised Epips,Including Re 44 to OPEP-02.1,rev 4 to OPEP-02.1.1 & Rev 7 to OPEP-02.6.26.Summary of Changes Provided in Encl 2 ML20210Q4581999-08-0505 August 1999 Informs That NRC Plans to Administer Generic Fundamentals Exam Section to Written Operator Licensing Exam on 991006. Authorized Representative of Facility Must Submit List of Individuals to Take exam,30 Days Before Exam Date ML20210P2031999-08-0505 August 1999 Discusses Staff Response to GL 92-01,Rev 1,Suppl 1, Rv Structural Integrity for Plant,Units 1 & 2 ML20210N2041999-08-0505 August 1999 Forwards SE Accepting Response to GL 87-02, Verification of Seismic Adequacy of Mechanical & Electrical Equipment in Operating Reactors,Unresolved Safety Issues (USI) A-46, & Suppl 1 BSEP-99-0127, Forwards Rev 3 to Physical Security & Safeguards Contingency Plan, for Brunswick Steam Electric Plant,Units 1 & 2.Without Encl1999-08-0505 August 1999 Forwards Rev 3 to Physical Security & Safeguards Contingency Plan, for Brunswick Steam Electric Plant,Units 1 & 2.Without Encl BSEP-99-0124, Forwards Proprietary Medical Status Rept & NRC Form 396 for Individual Holding License SOP-20811-1. Proprietary Encls Withheld1999-07-30030 July 1999 Forwards Proprietary Medical Status Rept & NRC Form 396 for Individual Holding License SOP-20811-1. Proprietary Encls Withheld ML20210G2941999-07-28028 July 1999 Discusses Public Meeting Conducted on 990720 to Present Results of Periodic Plant Performance Review for Brunswick Facility for Period of May 1997 to January 1999.List of Attendees Encl BSEP-99-0122, Informs That,Effective 990702,NRC Operator License for Individual Licensed on BSEP Units 1 & 2,expired Because Individual Employment at BSEP Was Terminated.Proprietary Encl Containing Name,Docket & License Number Withheld1999-07-20020 July 1999 Informs That,Effective 990702,NRC Operator License for Individual Licensed on BSEP Units 1 & 2,expired Because Individual Employment at BSEP Was Terminated.Proprietary Encl Containing Name,Docket & License Number Withheld BSEP-99-0121, Submits Response to Administrative Ltr 99-02, Operating Reactor Licensing Action Estimates. Estimates That 14 Submittals Will Be Made During Fy 2000 & Nine Will Be Made During Fy 2001 for Plant1999-07-19019 July 1999 Submits Response to Administrative Ltr 99-02, Operating Reactor Licensing Action Estimates. Estimates That 14 Submittals Will Be Made During Fy 2000 & Nine Will Be Made During Fy 2001 for Plant BSEP-99-0111, Forwards New Affidavit Supporting Withholding of Proprietay Info Provided by GE Entitled, Addl Info Re 1.09 Cycle Specific SLMCPR for Brunswick Unit 1 Cycle 12 & Included in Util 980223 LAR1999-07-19019 July 1999 Forwards New Affidavit Supporting Withholding of Proprietay Info Provided by GE Entitled, Addl Info Re 1.09 Cycle Specific SLMCPR for Brunswick Unit 1 Cycle 12 & Included in Util 980223 LAR ML20210E1181999-07-19019 July 1999 Forwards Insp Repts 50-324/99-04 & 50-325/99-04 on 990509- 0619.Three Violations of NRC Requirements Occurred & Being Treated as non-cited Violations Consistent with App C of Enforcement Policy ML20209G1081999-07-13013 July 1999 Forwards Radiological Emergency Response Plan & Revised Epips,Including Rev 4 to OPEP-02.1.1 & Rev 7 to OPEP-02.6.26 BSEP-99-0106, Informs That Units 1 & 2 Odcm,Spec 7.3.10, Gaseous Radwaste Treatment Sys Requires Gaseous Radwaste Treatment Sys to Be in Operation Whenever Main Condenser Air Ejector Sys Is in Operation.Special Rept Encl1999-06-28028 June 1999 Informs That Units 1 & 2 Odcm,Spec 7.3.10, Gaseous Radwaste Treatment Sys Requires Gaseous Radwaste Treatment Sys to Be in Operation Whenever Main Condenser Air Ejector Sys Is in Operation.Special Rept Encl BSEP-99-0103, Submits follow-up Info Re Interlaboratory Comparison Program for 1998 Radiological Environ Operating Rept,Suppl 11999-06-24024 June 1999 Submits follow-up Info Re Interlaboratory Comparison Program for 1998 Radiological Environ Operating Rept,Suppl 1 BSEP-99-0100, Forwards Rev 0 to Calculation 2B11-0001, Core Shroud B214R1 Structural Evaluation, Which Provides Evaluation of Unit 2 Core Shroud Insp Results1999-06-23023 June 1999 Forwards Rev 0 to Calculation 2B11-0001, Core Shroud B214R1 Structural Evaluation, Which Provides Evaluation of Unit 2 Core Shroud Insp Results BSEP-99-0105, Forwards Rev 6 to OPEP-02.6, Severe Weather. Summary of Changes Encl1999-06-23023 June 1999 Forwards Rev 6 to OPEP-02.6, Severe Weather. Summary of Changes Encl ML20196H8191999-06-21021 June 1999 Informs That on 980915,Commission Suspended SALP Program for an Interim Period Until NRC Completes Review of Process for Assessing Performance at NPPs ML20212J0541999-06-17017 June 1999 Responds to Requesting That NRC Staff ...Allow BWR Plants Identified to Defer Weld Overlay Exams Until March 2001 or Until Completion of NRC Staff Review & Approval of Proposed Generic Rept,Whichever Comes First BSEP-99-0091, Notifies That Operator Licensed on Units 1 & 2,has Been Reassigned to non-licensed Activities & Operator License Considered Expired.Proprietary Info Encl.Proprietary Info Withheld,Per 10CFR2.790(a)(6)1999-06-14014 June 1999 Notifies That Operator Licensed on Units 1 & 2,has Been Reassigned to non-licensed Activities & Operator License Considered Expired.Proprietary Info Encl.Proprietary Info Withheld,Per 10CFR2.790(a)(6) ML20196A8111999-06-14014 June 1999 Ack Receipt of 990401 Response to NRC Ltr Issued on 990302 Re OI Investigation to Determine Whether Former BSEP Manager Threatened to Fire Employees Who Brought Safety Concerns to Nrc.Concluded That No Violation Occurred ML20195J1971999-06-14014 June 1999 Advises That GE-NE-523-B13-01920-56,Rev 1,submitted with 990202 Affidavit,Marked Proprietary,Will Be Withheld from Public Disclosure,Per 10CFR2.790(b)(5) & Section 103(b) of AEA of 1954,as Amended BSEP-99-0090, Provides Notification That Data Point D23C0315 Has Been Restored to Original Configuration During RFO on 9905141999-06-0909 June 1999 Provides Notification That Data Point D23C0315 Has Been Restored to Original Configuration During RFO on 990514 1999-09-08
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARBSEP-99-0170, Forwards Proprietery Notification of Change in Operator Status.Individual Name,Docket Number,License Number & Effective Date of Expiration,Encl.Proprietary Info Withheld, Per 10CFR2.790(a)(6)1999-10-19019 October 1999 Forwards Proprietery Notification of Change in Operator Status.Individual Name,Docket Number,License Number & Effective Date of Expiration,Encl.Proprietary Info Withheld, Per 10CFR2.790(a)(6) BSEP-99-0161, Submits Response to NRC RAI Re Relief Request VRR-03.VRR-03 Requested Relief from full-stroke Open Exercise Requirements for Supply Check Valves to air-operated Valves 1(2)-RNA-V313,1(2)-RNA-V314,1(2)-RNA-V350 & 1(2)-RNA-V3511999-10-13013 October 1999 Submits Response to NRC RAI Re Relief Request VRR-03.VRR-03 Requested Relief from full-stroke Open Exercise Requirements for Supply Check Valves to air-operated Valves 1(2)-RNA-V313,1(2)-RNA-V314,1(2)-RNA-V350 & 1(2)-RNA-V351 BSEP-99-0114, Forwards Supplemental Biological Assessment Submitted by CP&L Providing Updated Data for 1998 & 1999. Pictures of Intake Canal at Diversion Structure During High Tide Conditions Also Encl1999-10-0404 October 1999 Forwards Supplemental Biological Assessment Submitted by CP&L Providing Updated Data for 1998 & 1999. Pictures of Intake Canal at Diversion Structure During High Tide Conditions Also Encl BSEP-99-0157, Submits Annual Rept Summarizing Effect of Changes & Errors in Accepted loss-of-coolant Accident ECCS Evaluation Models Applicable to Bsep,Units 1 & 2 IAW 10CFR50.46(a)(3)(ii)1999-10-0404 October 1999 Submits Annual Rept Summarizing Effect of Changes & Errors in Accepted loss-of-coolant Accident ECCS Evaluation Models Applicable to Bsep,Units 1 & 2 IAW 10CFR50.46(a)(3)(ii) BSEP-99-0142, Forwards Proprietary Updated List of Home Addresses for Individuals Licensed to Operate CP&L Bsep,Units 1 & 2. Proprietary Info Withheld,Per 10CFR2.790(a)(6)1999-09-23023 September 1999 Forwards Proprietary Updated List of Home Addresses for Individuals Licensed to Operate CP&L Bsep,Units 1 & 2. Proprietary Info Withheld,Per 10CFR2.790(a)(6) BSEP-99-0158, Provides Proprietary Notification of Change in Operator Status.Individual Name,Docket Number,License & Effective Date of Expiration Provided in Encl to Ltr.Proprietary Info Withheld,Per 10CFR2.790(a)(6)1999-09-21021 September 1999 Provides Proprietary Notification of Change in Operator Status.Individual Name,Docket Number,License & Effective Date of Expiration Provided in Encl to Ltr.Proprietary Info Withheld,Per 10CFR2.790(a)(6) BSEP-99-0153, Forwards Monthly Operating Repts for Brunswick Steam Electric Plant,Units 1 & 2.CP&L Is Submitting Encl Rept of Operating Statistics & SD Experience for Aug 19991999-09-14014 September 1999 Forwards Monthly Operating Repts for Brunswick Steam Electric Plant,Units 1 & 2.CP&L Is Submitting Encl Rept of Operating Statistics & SD Experience for Aug 1999 BSEP-99-0147, Forwards Response to NRC Telcon RAI Re Relief Requests RR-5, 12,13,14,22,23,24 & 25,per Inservice Insp Program for Third 10-yr Interval1999-09-14014 September 1999 Forwards Response to NRC Telcon RAI Re Relief Requests RR-5, 12,13,14,22,23,24 & 25,per Inservice Insp Program for Third 10-yr Interval BSEP-99-0151, Notifies NRC That Unit 1 Digtial FW Control Sys Upgrade Was Completed on 990831 During Plant Sd.Action Completes Y2K Remediation Activities for BSEP1999-09-0808 September 1999 Notifies NRC That Unit 1 Digtial FW Control Sys Upgrade Was Completed on 990831 During Plant Sd.Action Completes Y2K Remediation Activities for BSEP BSEP-99-0150, Forwards Proprietary Info Re Positive Drug Test for Operator Licensed on CP&L Bsep,Units 1 & 2,in Response to NRC .Proprietary Info Withheld,Per 10CFR2.790(a)(6)1999-09-0202 September 1999 Forwards Proprietary Info Re Positive Drug Test for Operator Licensed on CP&L Bsep,Units 1 & 2,in Response to NRC .Proprietary Info Withheld,Per 10CFR2.790(a)(6) BSEP-99-0149, Forwards Two Proprietary License Renewal Applications Consisting of NRC Form 398 & NRC Form 396,for Operators Licensed at Plant.Proprietary Encls Withheld1999-09-0202 September 1999 Forwards Two Proprietary License Renewal Applications Consisting of NRC Form 398 & NRC Form 396,for Operators Licensed at Plant.Proprietary Encls Withheld BSEP-99-0112, Forwards Summary of Exam Results for Feedwater Sparger & Nozzle Exams Performed During RFO13.Evaluation of Exam Results Documented in ESR 98-00333, Unit 2 Feedwater Sparger Evaluation Based on B214R1 IVVI Exam Results, Encl1999-09-0101 September 1999 Forwards Summary of Exam Results for Feedwater Sparger & Nozzle Exams Performed During RFO13.Evaluation of Exam Results Documented in ESR 98-00333, Unit 2 Feedwater Sparger Evaluation Based on B214R1 IVVI Exam Results, Encl BSEP-99-0146, Forwards Revised EPIPs for Bsep,Units 1 & 2.List of Revised Procedures & Summary of Changes Are Encl1999-08-26026 August 1999 Forwards Revised EPIPs for Bsep,Units 1 & 2.List of Revised Procedures & Summary of Changes Are Encl BSEP-99-0141, Forwards Proprietary Info Re Expiration of Operator Licenses SOP-20812-1,OP-20977-1 & OP-21217,per 10CFR50.74(b) Re Notification of Changes in Operator Status.Proprietary Info Withheld,Per 10CFR2.790(a)(6)1999-08-25025 August 1999 Forwards Proprietary Info Re Expiration of Operator Licenses SOP-20812-1,OP-20977-1 & OP-21217,per 10CFR50.74(b) Re Notification of Changes in Operator Status.Proprietary Info Withheld,Per 10CFR2.790(a)(6) BSEP-99-0148, Forwards Rev 0 to NF-908.03, Brunswick Unit 2,Cycle 14 Neutronics Startup Rept, IAW Section 13.4.2.1 of UFSAR for Brunswick Steam Electric Plant,Units 1 & 21999-08-25025 August 1999 Forwards Rev 0 to NF-908.03, Brunswick Unit 2,Cycle 14 Neutronics Startup Rept, IAW Section 13.4.2.1 of UFSAR for Brunswick Steam Electric Plant,Units 1 & 2 BSEP-99-0130, Requests Relief from ASME Boiler & Pressure Vessel Code, Section Xi,Iaw 10CFR50.55a(g)(5)(iii) & NRC GL 90-05, Guidance for Performing Temporary Non-Code Repair of ASME Code Class 1,2 & 3 Piping. Regulatory Commitments,Encl1999-08-25025 August 1999 Requests Relief from ASME Boiler & Pressure Vessel Code, Section Xi,Iaw 10CFR50.55a(g)(5)(iii) & NRC GL 90-05, Guidance for Performing Temporary Non-Code Repair of ASME Code Class 1,2 & 3 Piping. Regulatory Commitments,Encl BSEP-99-0132, Requests Delay in Providing Update on Util Intended Actions Re GL 96-06,until 180 Days After NRC Approval of Generic Technical Basis.List of Regulatory Commitments,Encl1999-08-20020 August 1999 Requests Delay in Providing Update on Util Intended Actions Re GL 96-06,until 180 Days After NRC Approval of Generic Technical Basis.List of Regulatory Commitments,Encl BSEP-99-0134, Forwards Monthly Operating Repts for July 1999 for BSEP, Units 1 & 2.Revised Rept for June 1999 for Unit 2,reflecting Info on 990628 Forced Shutdown of Plant,Encl1999-08-13013 August 1999 Forwards Monthly Operating Repts for July 1999 for BSEP, Units 1 & 2.Revised Rept for June 1999 for Unit 2,reflecting Info on 990628 Forced Shutdown of Plant,Encl BSEP-99-0128, Forwards Revised Relief Request RR-17,applicable to Remainder of Third 10-year ISI Program for Plant1999-08-11011 August 1999 Forwards Revised Relief Request RR-17,applicable to Remainder of Third 10-year ISI Program for Plant BSEP-99-0127, Forwards Rev 3 to Physical Security & Safeguards Contingency Plan, for Brunswick Steam Electric Plant,Units 1 & 2.Without Encl1999-08-0505 August 1999 Forwards Rev 3 to Physical Security & Safeguards Contingency Plan, for Brunswick Steam Electric Plant,Units 1 & 2.Without Encl BSEP-99-0123, Forwards Rev 54 to Radiological Emergency Response Plan (RERP) & Revised Epips,Including Re 44 to OPEP-02.1,rev 4 to OPEP-02.1.1 & Rev 7 to OPEP-02.6.26.Summary of Changes Provided in Encl 21999-08-0505 August 1999 Forwards Rev 54 to Radiological Emergency Response Plan (RERP) & Revised Epips,Including Re 44 to OPEP-02.1,rev 4 to OPEP-02.1.1 & Rev 7 to OPEP-02.6.26.Summary of Changes Provided in Encl 2 BSEP-99-0110, Forwards Rev 0 to ESR 99-00279, B214R1 RPV Hydrotest Bolted Connection Corrective Action Evaluation, IAW Subparagraph IWB-3144(b) of 1989 Edition of ASME B&PV Code, Section XI1999-08-0505 August 1999 Forwards Rev 0 to ESR 99-00279, B214R1 RPV Hydrotest Bolted Connection Corrective Action Evaluation, IAW Subparagraph IWB-3144(b) of 1989 Edition of ASME B&PV Code, Section XI BSEP-99-0124, Forwards Proprietary Medical Status Rept & NRC Form 396 for Individual Holding License SOP-20811-1. Proprietary Encls Withheld1999-07-30030 July 1999 Forwards Proprietary Medical Status Rept & NRC Form 396 for Individual Holding License SOP-20811-1. Proprietary Encls Withheld BSEP-99-0122, Informs That,Effective 990702,NRC Operator License for Individual Licensed on BSEP Units 1 & 2,expired Because Individual Employment at BSEP Was Terminated.Proprietary Encl Containing Name,Docket & License Number Withheld1999-07-20020 July 1999 Informs That,Effective 990702,NRC Operator License for Individual Licensed on BSEP Units 1 & 2,expired Because Individual Employment at BSEP Was Terminated.Proprietary Encl Containing Name,Docket & License Number Withheld BSEP-99-0111, Forwards New Affidavit Supporting Withholding of Proprietay Info Provided by GE Entitled, Addl Info Re 1.09 Cycle Specific SLMCPR for Brunswick Unit 1 Cycle 12 & Included in Util 980223 LAR1999-07-19019 July 1999 Forwards New Affidavit Supporting Withholding of Proprietay Info Provided by GE Entitled, Addl Info Re 1.09 Cycle Specific SLMCPR for Brunswick Unit 1 Cycle 12 & Included in Util 980223 LAR BSEP-99-0121, Submits Response to Administrative Ltr 99-02, Operating Reactor Licensing Action Estimates. Estimates That 14 Submittals Will Be Made During Fy 2000 & Nine Will Be Made During Fy 2001 for Plant1999-07-19019 July 1999 Submits Response to Administrative Ltr 99-02, Operating Reactor Licensing Action Estimates. Estimates That 14 Submittals Will Be Made During Fy 2000 & Nine Will Be Made During Fy 2001 for Plant ML20209G1081999-07-13013 July 1999 Forwards Radiological Emergency Response Plan & Revised Epips,Including Rev 4 to OPEP-02.1.1 & Rev 7 to OPEP-02.6.26 BSEP-99-0106, Informs That Units 1 & 2 Odcm,Spec 7.3.10, Gaseous Radwaste Treatment Sys Requires Gaseous Radwaste Treatment Sys to Be in Operation Whenever Main Condenser Air Ejector Sys Is in Operation.Special Rept Encl1999-06-28028 June 1999 Informs That Units 1 & 2 Odcm,Spec 7.3.10, Gaseous Radwaste Treatment Sys Requires Gaseous Radwaste Treatment Sys to Be in Operation Whenever Main Condenser Air Ejector Sys Is in Operation.Special Rept Encl BSEP-99-0103, Submits follow-up Info Re Interlaboratory Comparison Program for 1998 Radiological Environ Operating Rept,Suppl 11999-06-24024 June 1999 Submits follow-up Info Re Interlaboratory Comparison Program for 1998 Radiological Environ Operating Rept,Suppl 1 BSEP-99-0100, Forwards Rev 0 to Calculation 2B11-0001, Core Shroud B214R1 Structural Evaluation, Which Provides Evaluation of Unit 2 Core Shroud Insp Results1999-06-23023 June 1999 Forwards Rev 0 to Calculation 2B11-0001, Core Shroud B214R1 Structural Evaluation, Which Provides Evaluation of Unit 2 Core Shroud Insp Results BSEP-99-0105, Forwards Rev 6 to OPEP-02.6, Severe Weather. Summary of Changes Encl1999-06-23023 June 1999 Forwards Rev 6 to OPEP-02.6, Severe Weather. Summary of Changes Encl BSEP-99-0091, Notifies That Operator Licensed on Units 1 & 2,has Been Reassigned to non-licensed Activities & Operator License Considered Expired.Proprietary Info Encl.Proprietary Info Withheld,Per 10CFR2.790(a)(6)1999-06-14014 June 1999 Notifies That Operator Licensed on Units 1 & 2,has Been Reassigned to non-licensed Activities & Operator License Considered Expired.Proprietary Info Encl.Proprietary Info Withheld,Per 10CFR2.790(a)(6) BSEP-99-0090, Provides Notification That Data Point D23C0315 Has Been Restored to Original Configuration During RFO on 9905141999-06-0909 June 1999 Provides Notification That Data Point D23C0315 Has Been Restored to Original Configuration During RFO on 990514 BSEP-99-0092, Informs That,Effective 990513,NRC Operator License for Individual Licensed on BSEP Units 1 & 2,expired.Proprietary Encl Containing Name of Individual,Docket Number,License Mumber & Date of Expiration Encl.Proprietary Encl Withheld1999-06-0808 June 1999 Informs That,Effective 990513,NRC Operator License for Individual Licensed on BSEP Units 1 & 2,expired.Proprietary Encl Containing Name of Individual,Docket Number,License Mumber & Date of Expiration Encl.Proprietary Encl Withheld BSEP-99-0085, Forwards Proprietary Rev 67 to EPIP OPEP-App a, Emergency Response Resources & non-proprietary Rev 53 to Radiological Emergency Response Plan, Rev 15 to EPIP OPEP- 03.8.2 & Rev 17 to EPIP OPEP-04.2.Proprietary Info Withheld1999-05-27027 May 1999 Forwards Proprietary Rev 67 to EPIP OPEP-App a, Emergency Response Resources & non-proprietary Rev 53 to Radiological Emergency Response Plan, Rev 15 to EPIP OPEP- 03.8.2 & Rev 17 to EPIP OPEP-04.2.Proprietary Info Withheld BSEP-99-0078, Provides Addl Info Re Jet Pump Riser Weld Insp Results,Per 990406 Telcon with NRC Re Effect of worst-case Crack on LPCI Sys Flow & PCT1999-05-17017 May 1999 Provides Addl Info Re Jet Pump Riser Weld Insp Results,Per 990406 Telcon with NRC Re Effect of worst-case Crack on LPCI Sys Flow & PCT BSEP-99-0080, Forwards Revs Made to TS Bases Between 980605 & 990507 Without Prior NRC Approval1999-05-17017 May 1999 Forwards Revs Made to TS Bases Between 980605 & 990507 Without Prior NRC Approval BSEP-99-0083, Forwards Two Proprietary License Renewal Applications Consisting of NRC Forms 398 & 396,for Operators Licensed on CP&L Bsep,Units 1 & 2,IAW 10CFR55.57.Proprietary Info Withheld from Public Disclosure IAW 10CFR2.790(a)(6)1999-05-14014 May 1999 Forwards Two Proprietary License Renewal Applications Consisting of NRC Forms 398 & 396,for Operators Licensed on CP&L Bsep,Units 1 & 2,IAW 10CFR55.57.Proprietary Info Withheld from Public Disclosure IAW 10CFR2.790(a)(6) BSEP-99-0056, Forwards 1998 Radiological Environ Operating Rept for BSEP, Units 1 & 2. Encl 1 Provides List of Regulatory Commitments.Vols II & Iii,Sample Analysis Data for Jan-June 1998 & Jul-Dec 1998,respectively1999-05-13013 May 1999 Forwards 1998 Radiological Environ Operating Rept for BSEP, Units 1 & 2. Encl 1 Provides List of Regulatory Commitments.Vols II & Iii,Sample Analysis Data for Jan-June 1998 & Jul-Dec 1998,respectively BSEP-99-0073, Withdraws Request for Approval of Proposed QAP Change Which Was Submitted by1999-05-12012 May 1999 Withdraws Request for Approval of Proposed QAP Change Which Was Submitted by BSEP-99-0062, Forwards Latest Revs of COLR & Suppl Reload Licensing Rept, for Bsep,Unit 2.Proprietary Rev 6,Suppl 2 to NEDC- 31624P & EMF-2168P,included.Proprietary Encls Withheld, Per 10CFR2.790 & 10CFR9.171999-05-11011 May 1999 Forwards Latest Revs of COLR & Suppl Reload Licensing Rept, for Bsep,Unit 2.Proprietary Rev 6,Suppl 2 to NEDC- 31624P & EMF-2168P,included.Proprietary Encls Withheld, Per 10CFR2.790 & 10CFR9.17 BSEP-99-0079, Forwards Proprietary One License Renewal Application Consisting of NRC Form 398, Personal Qualification Statement - Licensee & NRC Form 396, Certification Of... Proprietary Info Withheld,Per 10CFR2.790(a)(6)1999-05-0707 May 1999 Forwards Proprietary One License Renewal Application Consisting of NRC Form 398, Personal Qualification Statement - Licensee & NRC Form 396, Certification Of... Proprietary Info Withheld,Per 10CFR2.790(a)(6) BSEP-99-0066, Submits Revised Relief Requests Which Provides Alternative to ASME B&PV Code Requirements for Insp of Containments. Revised Copies of Relief Requests CIP-03,CIP-04,CIP-05, CIP-10,CIP-16 & CIP-17 Provided1999-05-0404 May 1999 Submits Revised Relief Requests Which Provides Alternative to ASME B&PV Code Requirements for Insp of Containments. Revised Copies of Relief Requests CIP-03,CIP-04,CIP-05, CIP-10,CIP-16 & CIP-17 Provided ML20195D6301999-04-30030 April 1999 Forwards Natl Marine Fisheries Svc Biological Opinion Based on Review of Continued Use of Cooling Water Intake Sys at Bsep.Rept Reviews Effects of Activity on Loggerhead,Kemps Ridley,Green,Hawksbill & Leatherback Sea Turtles BSEP-99-0071, Forwards Notice of Expiration of Operator License,Per 10CFR50.75(b).Details Withheld Per 10CFR2.790(a)(6)1999-04-27027 April 1999 Forwards Notice of Expiration of Operator License,Per 10CFR50.75(b).Details Withheld Per 10CFR2.790(a)(6) BSEP-99-0069, Discusses Rev of Relief Request RR-17, Leakage at Bolted Connections, for ISI Program for Third ten-yr Interval.Util & NRC Were Unable to Reach Agreement Re Use of ASME Code Case N-566-1 as Permanent Basis for Relief Request RR-171999-04-26026 April 1999 Discusses Rev of Relief Request RR-17, Leakage at Bolted Connections, for ISI Program for Third ten-yr Interval.Util & NRC Were Unable to Reach Agreement Re Use of ASME Code Case N-566-1 as Permanent Basis for Relief Request RR-17 BSEP-99-0063, Notifies NRC of Plans to Install Mod for Bsep,Units 1 & 2 Erds.Physical Computer Sys Changeout Activities Will Temporarily Affect Availability of ERDS Computer Points Via NRC Data Link1999-04-21021 April 1999 Notifies NRC of Plans to Install Mod for Bsep,Units 1 & 2 Erds.Physical Computer Sys Changeout Activities Will Temporarily Affect Availability of ERDS Computer Points Via NRC Data Link BSEP-99-0050, Informs NRC That Certain Category C,D & E Piping Welds in Units 1 & 2 Have Not Been Inspected in Accordance with Frequencies Provided by NRC GL 88-01, NRC Position on IGSCC in BWR Austenitic Stainless Steel Piping,1999-04-0606 April 1999 Informs NRC That Certain Category C,D & E Piping Welds in Units 1 & 2 Have Not Been Inspected in Accordance with Frequencies Provided by NRC GL 88-01, NRC Position on IGSCC in BWR Austenitic Stainless Steel Piping, BSEP-99-0051, Forwards Response to Ofc of Investigations Rept 2-1998-014 to Support Final Resolution of Allegations.Response in Encl 1 Withheld.Public Version of Response in Encl 21999-04-0101 April 1999 Forwards Response to Ofc of Investigations Rept 2-1998-014 to Support Final Resolution of Allegations.Response in Encl 1 Withheld.Public Version of Response in Encl 2 BSEP-99-0015, Forwards Response to NRC 981221 RAI Re Cp&Ls Response to GL 95-07, Pressure Locking & Thermal Binding of SR Power-Operated Gate Valves1999-03-31031 March 1999 Forwards Response to NRC 981221 RAI Re Cp&Ls Response to GL 95-07, Pressure Locking & Thermal Binding of SR Power-Operated Gate Valves 1999-09-08
[Table view] |
Text
_ _ _ _ _ - _ _ _ . _ _ ___~ _ ._. ._ - _ _ _ .
'.CP&L Carolina Power & Light Company P.O. Box 10429 Southport, NC 28461-0429 l
l SERIAL: BSEP 97-0112 :
j 10 CFR 2.201 ;
MAR 171997 U.S. Nuclear Regulatory Commission )
ATTN: Document Control Desk q Washington, D. C. 20555
- BRUNSWICK STEAM EL'E CTRIC PLANT, UNIT NOS.1 AND 2 DOCKET NOS. 50-325 AND 50-324/ LICENSE NOS. DPR-71 AND DPR-62 i REPLY TO NOTICE OF VIOLATION Gentlemen:
On February 14,1997, the NRC issued a Notice of Violation (NOV) for the Brunswick Steam i lE Electric Plant, Unit Nos.1 and 2. The NOV contained two specific violations the bases for ,
which are provided in NRC Inspection Report 50-325/96-18 and 50-324/96-18. .
Carolina Power & Light Company admits the violations occurred as described in the Inspection Report. Enclosure 1 provides Carolina Power & Light Company's response to the violations in accordance with the provisions of 10 CFR 2.201; enclosure 2 delineates regulatory commitments contained within the response.
Carolina Power & Light Company finds the inspection does not contain information of a ,
propriettsry nature. Please refer any questions regarding this submittal to Mr. K. R. Jury, Manager-Regulatory Affairs, at (910) 457-2783.
3 Sincarely,
[
W. Levis, Director-Site Operations Brunswick Steam Electric Plant AO )
SFT/sft / ,
l Enclosures l
- 1. Reply to Notice of Violation 1
- 2. List of Regulatory Commitments l
cc: Mr. L. A. Reyes, Regional Administrator, Region 11 Mr. D. C. Trimble, Jr., NRR Project Manager - Brunswick Units 1 and 2 '
Mr. C. A. Patterson, Brunswick NRC Senior Resident inspector l The Honorable J. A. Sanford, Chairman - North Carolina Utilities Commission E~ 9703240158 970317 IREpBppMES,IE PDR ADOCK 05000324
0 .
j
. . I ENCLOSURE 1 BRUNSWICK STEAM ELECTRIC PLANT, UNITS 1 and 2 NRC DOCKET NOS. 50-325 & 50-324 OPERATING LICENSE NOS. DPR-71 & DPR-62 REPLY TO NOTICE OF VIOLATION VIOLATIONS:
During an NRC inspection conducted from December 8,1996 through January 18,1997, two violations of NRC requirements were identified. In accordance with the NUREG 1600, " General Statement of Policy and Procedure for NRC Enforcement Actions" , the violations are listed below:
i VIOLATION A:
10 CFR 50, Appendix B, Criterion XII, Control of Measuring and Test Equipment requires that measures shall be established to assure that gauges used in activities affecting quality are properly controlled, calibrated, and adjusted at specified periods to maintain accuracy within i necessary limits. !
Contrary to the above, on December 12,1996, licensee measures failed to assure that the Unit 2 Residual Heat Removal (RHR) discharge pressure gauges 2-E11-PI-R003A(C) were properly calibrated during the performance of Periodic Test OPT-08.2.2c, Low Pressure Coolant injection (LPCI)/RHR System Operability Test - Loop A.
This is a Severity Level IV Violation (Supplement I). This is applicable to Unit 2 only.
RESPONSE TO VIOLATION A:
Admission or Denial of Violation:
Carolina Power & Light admits this violation.
Reason for Violation:
This violation is attributed to the failure to establish appropriate controls for ensuring that calibrated test gauges were used in the performance of surveillance testing.
On August 29,1996, it was determined that the test gauges installed for quarterly In-Service Testing (IST) on the RHR and High Pressure Coolant injection (HPCI) system pumps were not E1-1
1 l
performing in accordance with plant testing requirements. Previous testing results indicated that the gauges would not remain in calibration over the established calibration frequency. As a result, it was determined that calibrated temporary gauges would be installed prior to the performance of RHR and HPCI system operability testing to ensure that the monitored parameters (i.e., pump suction and/or discharge pressure) were accurate. This requirement was to be maintained until the installed gauges were replaced with acceptable gauges or the calibration problem was corrected.
l An Operations Standing Instruction (SI) was established as the controlling mechanism for ensuring that calibrated temporary test gauges were installed prior to the performance of RHR and HPCI system testing. This process was an inappropriate control mechanism for ensunng i that the temporary test gauges were installed. Sts are intended to provide guidance for l consistency between shifts on various issues, describe significant plant problems or changes, l and to inform operators of significant procedure changes affecting plant operations. The Sls '
are only required to be read once and reviewed periodically.
The appropriate controlling mechanism should have been the respective periodic testing ,
procedures. These procedures should have been revised to provide the guidance to install !
calibrated temporary gauges prior to performing each test. These procedures are continuous use procedures and as such, require that each step be signed-off as it is performed. Therefore, a procedural step requiring the installation of the temporary gauges would be implemented and signed-off during each test.
The investigation into the cause of this event identified two contributing factors. The first !
contributing factor was the failure to initiate a separate Work Request / Job Order (WRJO) in accordance with management expectations. It is an expectation that a separate WR/JO should have been initiated for each identified test gauge deficiency or that a test gauge reference be inserted in an existing WR/JO secondary equipment field. Had a separate WR/JO been written for each identified test gauge deficiency, the operators could have readily identified that temporary test gauges were required to be installed prior to system testing.
The second contributing factor is the failure of the operators to follow the guidance of the St.
Based on the knowledge that replacement gauges had been ordered and that the replacement gauges would be installed upon receipt, the operators believed that the gauges had been replaced when an active WR/JO for the gauges could not be identified. The operators should have verified that the gauges had been replaced and obtained management concurrence to deviate from the guidance provided in the St.
Corrective Actions Which Have Been Taken and Results Achieved:
The installed test gauges for the RHR and HPCI systems have been replaced on both units; the Si that was established to ensure test gauge installation has been deleted.
The personnelinvolved in this event were counseled on the importance of adherence to Sis.
Corrective Steps Which Will Be Taken to Avoid Further Violations:
Sts are being reviewed to determine if others exist which provide guidance or instruction that E1-2
'should be controlled by plant procedures. The review of the Sls will be completed by March 31, 1997. The revisions to procedures identified during the Sl review will be implemented by May 2,1997.
Appropriate procedure revisions will be implemented by May 2,1997, to incorporate management expectations on the initiation of WR/JOs.
Date When Full Compliance Will Be Achieved: ,
Full compliance with the requirements of 10 CFR 50, Appendix B, Criterion Xil, has been 2 achieved. l l
VIOLATION B:
10 CFR 50.65(b) establishes the scoping criteria for selection of safety related and non-safety related structures, systems, or components to be included within the Maintenance Rule program. Scoping criteria shallinclude those non-safety related structures, systems, and components (SSCs) that are relied upon to mitigate accidents or transients, or are used in the plant emergency operating procedures.
Nuclear Generation Group Standard Procedure ADM-NGGC-0101 established the program for the implementation of the Maintenance Rule which identified those structures, systems, and components included within the scope of the Maintenance Rule.
Contrary to the above, as of January 14,1997, the licensee failed to include a number of non-safety related systems or components within the scope of the Maintenance Rule as required.
The following examples were improperly excluded from the scope.
- 1. Communications, Emergency AC and DC Lighting - These non-safety related SSCs were not included in the scope of the rule despite being used in Emergency Operating Procedures or being relied upon to mitigate accidents or transients.
- 2. Ambient Chlorine Detectors, Turbine Ventilation, Service Water Effluent, Reactor Building Area, and Main Steam Line Radiation Monitors - These non-safety related components were not included in the scope of the rule despite being used in the Emergency Operating Procedures or relied upon to mitigate accidents or transients.
This is a Severity Level IV Violation (Supplement I). This is applicable to both units.
RESPONSE TO VIOLATION B:
Admission or Denial of Violation:
Carolina Power & Light admits this violation.
E1-3
g .
Reason for Violation:
10 CFR 50.65(b)(2) requires inclusion of systems, structures, or components " ..that are relied upon to mitigate accidents or transients or are used in plant emergency operating procedures (EOPs)."
The Brunswick Steam Electric Plant (BSEP) Maintenance Rule Expert Panel excluded those systems identified in examples 1 and 2 of this violation from the scope of the Maintenance Rule concluding that these systems did not add significant value to the mitigation function of an EOP since they do not provide complete nor a significant fraction of, the total functional capability required to mitigate core damage or radioactive release. This determination was based on the guidance provided in section 8.2.1.3 of NUMARC 93-01," Industry Guideline for Monitoring the Effectiveness of Maintenance at Nuclear Power Plants," Revision 0, which has been endorsed .
by the NRC.
In review of industry experience related to the Maintenance Rule, BSEP recognized this position as potentially inconsistent with the NRC interpretation. Actions were initiated to evaluate current scoping and to make appropriate additions to the Maintenance Rule scope.
These actions were in progress when the issue was identified during the NRC inspection.
l Corrective Actions Which Have Been Taken and Results Achieved- !
- 1. The following systems are being added to the Maintenance Rule scope: chlorine detectors, emergency AC lighting (control room portions only), Appendix R DC lighting, public
- address system, portable radio system (repeaters and transceivers), sound-powered phone (i.e., hard-wire communications which are referenced in EOPs), process radiation monitors, area radiation monitors, reactor building area temperature indicators, and reactor building differential pressure instrumentation.
I The following SSCs were not added to the Maintenance Rule scope: portable communication equipment (hand-held radios, headsets), non-control room emergency AC lighting, non-Appendix R emergency DC lighting, portable area radiation monitors, and non-significant process radiation monitors. Justification for these exclusions is provided as follows.
Communications Systems:
EOP related communication sources at BSEP include portable radios, a five channel public address system, and a five channel sound-powered phone system. The likelihood of a loss of all three sources at any one time is remote and thus, the focus of the Maintenance Rule was not initially deemed necessary.
The power block portions of the public address system, the plant installed portions of the portable radio system, and the channels of the sound-powered phone system which are referenced in EOPs have been added to the Maintenance Rule scope.
E1-4
. t E'meraency AC Liahtina:
The emergency AC lighting equipment in locations other than the control room provides minimum lighting on each reactor building elevation primarily for the purpose of personnel egress. The lights are not positioned to illuminate equipment used to accomplish EOP functions. Portable lighting equipment is required to perform these actions. BSEP maintains portable lighting in strategically located gangboxes which are marked and locked for emergency use by Operations personnel. These portable lights are periodically checked to ensure functionality. The same portable lighting used to illuminate key plant equipment to support EOP actions is also used for personnel egress to the equipment.
Consequently, emergency AC lighting equipment located in areas other than the control room is not credited with illuminating plant areas for operators during performance of their accident or transient mitigation duties on a loss of normal plant lighting. As such, this equipment is not being added to the Maintenance Rule scope.
The control room emergency AC lights are supplied from the two Uninterruptible Power Supplies (UPS) and are arranged such that each UPS feeds every other light. Each UPS ;
can be powered from either division of the 480 volt AC electrical system or either the Unit 1 i or 2 Division 2125/250 volt DC battery system. The remainder of the control room l emergency AC lighting system consists of distribution panels, fluorescent bulbs, and j ballasts. There is no preventive maintenance which could be performed on the system that l would enhance the reliability and availability of the system. The bulbs and ballasts are l replaced upon failure on an as-needed basis. Due to the number and layout of the lighting fixtures installed in the control room, the failure of a bulb, ballast, circuit breaker, or entire distribution panel would not cause a loss of illumination and thereby inhibit the operator's ability to perform EOP or accident mitigating actions. The availability and reliability of the system are entirely dependent on the availability of the power sources. BSEP has added the UPS to the Maintenance Rule scope. The DC battery system has been included in the Maintenance Rule scope since the initial Maintenance Rule program development effort.
Emeraency DC Liahtina:
Emergency DC lighting consists af two subsystems; egress / exit sign lighting and Appendix l R lights. Similar to the emergency AC lighting system, egress and exit sign lights do not illuminate equipment requirer' to accomplish EOP functions. Portable lights are required to support EOP related functicas and as such, could also be used for egress. Consequently, the emergency DC egresrtexit sign lighting equipment is not being included in the Maintenance Rule scope Appendix R SSCs includ.ng lights were initially excluded from the Maintenance Rule scope based on the general exclusion allowed for Appendix R components in NUMARC 93-01.
Appendix R related lighting equipment has been added to the Maintenance Rule scope since these lights provide illumination of certain equipment identified in the EOPs.
Area Radiation Monitors (ARMsk The EOPs specify entry level conditions which are based on the readings of reactor building area radiation monitor channels 15 through 30 (excluding channels 21 and 26).
Although there are alternate methods of confirming these conditions, the ARMS are the first line of detection which provide continuous monitoring capabilities. Area radiation monitors E1-5
i
'e .
and continuous area monitors are also used to determine whether an alert emergency action level exists.
Since the appropriate regions for EOP entry are monitored by permanently installed area radiation monitors, the permanent area radiation monitors have been added into the scope of the Maintenance Rule. Updated Final Safety Analysis Report (UFSAR) section 12.5 does not describe the continuous air monitors (CAMS) as being used for accident or l transient mitigation. The UFSAR does state that CAMS are used for routine sampling in selected areas of potential airborne radioactivity. Since the number of portable CAMS and their locations can vary according to changing needs and conditions and CAMS do not provide remote input to the control room, CAMS will not be included in the Maintenance i Rule scope.
Process Radiation Monitors: !
Process radiation monitors which are designed to provide safety system actuation such as the Reactor Building Vent Radiation Monitor, the Main Stack Radiation Monitor, and the Control Building Area Radiation Monitor have been included in the Maintenance Rule scope since Maintenance Rule program development. As part of the corrective actions for this violation, those process radiation monitors which provide EOP entry information have been added to the scope of the Maintenance Rule. These monitors include the Main Steam Line Radiation Monitors, the Condenser Off-Gas Radiation Monitors, the Reactor j Building Roof Vent Noble Gas Radiation Monitor, the Turbine Building Noble Gas Radiation Monitors, the Turbine Building Release Rate Monitor, and the Service Water Liquid Discharge Radiation Monitors. Those process radiation monitors that do not provide safety system actuation or EOP entry information are not being included in the Maintenance Rule scope. These include the Radwaste Liquid Effluent Radiation Monitor, the P.eactor Building Closed Cooling Water Liquid Discharge Radiation Monitor, the Storm Drain Collection Basin Radiation Monitor, the AOG Charcoal Adsorber System Effluent Gas Radiation Monitor, the Hardened Wetwell Vent Ra.iiation Monitor, the Hot Shop Ventilation Exhaust Radiation Monitor, and the Stabilization Pond Effluent Radioactivity Monitor.
- 2. A review of the EOPs for other SSCs used to identify EOP entry conditions was performed. This review revealed two deficiencies related to EOP-SCCP, Secondary Containment Control Procedure. This EOP includes secondary containment area temperature indicators and differential pressure instrumentation as EOP entry conditions.
Those temperature switches that provide secondary containment system isolation actuation have been included in the Maintenance Rule scope since Maintenance Rule program development. However, those switches and the differential pressure instruments that provide an indication-only function, had not been included in the Maintenance Rule scope. As part of the corrective actions for this violation, the temperature switches and differential pressure instruments providing an indication-only function are being added to the Maintenance Rule scope. The remaining EOP entry-related SSCs were previously included in the Maintenance Rule scope.
Corrective Steps Which Will Be Taken to Avoid Further Violations:
Several actions are required to ensure compliance with 10 CFR 50.65 requirements for those SSCs which are being added to the Maintenance Rule scope as identified in this response.
E1-6
~ Perfor"mance criteria must be established and a historical review of system performance must be completed with the affected systems classified A1 or A2. These actions will be completed for each of the systems discussed, by April 30,1997.
Step 8.2.1.2 of NUMARC 93-01 states that utilities are to determine which non-safety SSCs are needed to mitigate accidents or transients as described in the plant's Final Safety Analysis Report (FSAR). Conversation with NRC Maintenance Rule personnelindicates that many i licensees misinterpreted this step to include only UFSAR Chapter 15 accidents and that the entire UFSAR should be used to determine accidents or transients. Examples of events which may have been overlooked include tornadoes and chlorine releases. Thus, BSEP will perform a review of Maintenance Rule scoping to determine whether any UFSAR accidents or ;
transients were overlooked. Any identified discrepancies will be reviewed by the Maintenance !
Rule Expert Panel for impact to the plant. Based on the results of this review, Maintenance Rule scoping and associated procedures will be adjusted accordingly. This review will be completed by July 31,1997. CP&L believes the Maintenance Rule process established at BSEP contains adequate controls for ensuring revision of Maintenance Rule scope due to plant changes, changes to the regulations as they occur, and from the incorporation of industry experience.
Date When Full Compliance Will Be Achieved:
Full compliance will be achieved by April 30,1997.
E1-7
- . - -~ ... . - .. . - . . . . , . , _ .
$ s O 4
Enclosure 2 List of Regulatory Commitments The following table identifies those actions committed to by Carolina Power & Light (CP&L)
Company in this document. Any other actions discussed in the submittal represent intended or !
planned actions by CP& L. They are described to the NRC for the NRC's information and are !
not regulatory commitments. Please notify the Manager-Regulatory Affairs at the Brunswick l Steam Electric Plant of any questions regarding this document or any associated regulatory )
commitments. I i
Commitment Committed date or outage Standing Instructions (S!s) are being reviewed to determine if other sis exist which provide guidance or instruction that S/2/97 should be controlled by plant procedures. Affected sis will have procedures developed / revised and implemented as appropriatei Appropriate procedures revisions will be implemented to incorporate management expectations on the initiation of Work 5/2/97 )
Request / Job Orders j Performance criteria will be established and a historical review l of system performance completed for those Structures, 4/30/97 ;
Systems, and Components which are being added to the l Maintenance Rule scope as identified in this response.
A review of Maintenance Rule scoping will be performed to ,
determine whether any. Updated Final Safety Analysis Report 7/31/97 ,
accidents or transients were overlooked; the Maintenance Rule scoping and associated procedures will be adjusted accordingly.
E2-1
- . . - - - - . . -