. l-ke&stsoN Soutnern Nucicer Operating Company Post OMco Box 1295

, Brrmingham. Mabama 35201 Teiephone (205) 868 5131 oe e uo,ey

, Vice President Southern Nudear Operating Company "

Farley Protect the Soutrem e eCtric System July 15, 1996

. Docket Nos.: 50-348 10 CFR 50.55a 50-364

! U. S. Nuclear Regulatory Commission ATTN: Document Control Desk i

Washington,DC 20555 Joseph M. Farley Nuclear Plant Inservice Inspection and Inservice Testing Program Withiirmwal of ASME Code Uodate Deferral Reauest Ladies and Gentlemen:

On January 11,1996, Southern Nuclear Operatmg Company (SNC) requested a 40-month deferral of the 10-year updates of the FNP Unit 1 and Unit 2 Inservice Inspection (ISI) and Inservice Testing (IST)

Programs. -

Upon further review, SNC has decided to proceed with the 10-year update as presently scheduled.

Therefore, SNC respectfully withdraws its request for the 40-month deferral of the FNP Unit I and Unit 2 ISI and IST Programs.

If there are any questions or if additional information is needed, please advise.

I Respectfully submitted, Y>

Dave Morey EFB/ cit: update 2. doc cc: Mr. S. D. Ebneter, Region II Administrator Mr. B. L. Siegel, NRR Senior Project Manager /

Mr. T. M. Ross, FNP Sr. Resident Inspector 9609170568 960715 PDR ADOCK 05000348 G pop f