MONTHYEARIR 05000456/20230042024-02-0202 February 2024 Integrated Inspection Report 05000456/2023004 and 05000457/2023004 ML24016A1902024-01-30030 January 2024 International, Inc. - Notice of Violation; the U.S. Nuclear Regulatory Commission Inspection Report 07201014/2022201 ML24025C7242024-01-29029 January 2024 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000456/2024002; 05000457/2024002 IR 05000457/20230112024-01-25025 January 2024 2B Auxiliary Feedwater Pump Diesel Fuel Oil Dilution Report 05000457/2023011 and Preliminary Greater than Green Finding and Apparent Violation ML24018A1992024-01-18018 January 2024 International, Administrative Change to HI-2200343-A ML24018A0362024-01-17017 January 2024 Paragon Energy Solutions, Defect with Detroit Diesel/Mtu Fuel Injectors P/N R5229660 Cat Id 0001390618 RS-24-004, Proposed Alternative to the Distribution Requirements of ASME Code Table IWC-2411-1 for the Steam Generators2024-01-11011 January 2024 Proposed Alternative to the Distribution Requirements of ASME Code Table IWC-2411-1 for the Steam Generators ML23363A0312024-01-0404 January 2024 Application for HI-STORM 100 Cask System, Amendment No. 19 - Acknowledgement of Withdrawal and Notification of the U.S. Nuclear Regulatory Commission Staff Efforts Closure ML23355A0842023-12-21021 December 2023 International, Withdrawal of HI-STORM I00 Multipurpose Canister Storage System Amendment ML23348A2162023-12-15015 December 2023 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0030 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) IR 05000456/20200232023-12-15015 December 2023 Baseline Security Inspection Document; 05000456/2023/402; 05000457/2023/402 ML23277A0032023-12-11011 December 2023 Issuance of Amendments Regarding Adoption of TSTF-370 ML23324A0952023-12-0606 December 2023 Amendment No. 19 to Certificate of Compliance No. 1014 for the HI-STORM 100 Multi-purpose Canister Storage System - Request for Additional Information ML23339A0452023-12-0505 December 2023 Request for Information for an NRC Post-Approval Site Inspection for License Renewal Inspection Report 05000546/2024010 ML23328A0052023-12-0505 December 2023 Issuance of Renewed Certificate of Compliance No. 1014, Amendment No. 17 for the Hi-Storm 100 Cask System (Cac/Epid 001028/L-2021-LLA-0140) ML23338A3052023-12-0404 December 2023 International, Submittal of Supplement to RAI Responses on HI-STORM 100 Amendment 18 ML23313A1552023-12-0101 December 2023 Review of the Fall 2022 Steam Generator Tube Inspection Report ML23334A1912023-11-30030 November 2023 International, Submittal of Topical Report HI-2210161-A Version ML23331A8922023-11-22022 November 2023 Supplement - Braidwood Security Rule Exemption Request ISFSI Docket No. Reference 05000457/LER-2023-001, Submittal of LER 2023-001-00 for Braidwood Station, Unit 2, Train B Auxiliary Feedwater Pump Was Inoperable Due to Degraded Oil in the Crank Case2023-11-17017 November 2023 Submittal of LER 2023-001-00 for Braidwood Station, Unit 2, Train B Auxiliary Feedwater Pump Was Inoperable Due to Degraded Oil in the Crank Case ML23321A0442023-11-17017 November 2023 Notification of Deviation from Electric Power Research Institute (EPRI) Topical Report MRP-227, Revision 1-A, Materials Reliability Program: Pressurized Water Reactor Internals Inspection and Evaluation Guideline ML23321A2172023-11-17017 November 2023 International, Responses to NRC Questions Form EA-23-044 Pre-Decisional Enforcement Conference JAFP-23-0063, Registration of Spent Fuel Cask Use2023-11-13013 November 2023 Registration of Spent Fuel Cask Use ML23317A1192023-11-10010 November 2023 Constellation Energy Generation, LLC - 2023 Annual Report - Guarantees of Payment of Deferred Premiums RS-23-118, Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information2023-11-10010 November 2023 Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information ML23310A0362023-11-0909 November 2023 International, Inc. - U.S. Nuclear Regulatory Commission Inspection Report 07201014/2023201 ML23283A1262023-11-0202 November 2023 Letter - Second Request for Additional Information - HI-STORM 100 Amd 18 RS-23-114, Proposed Alternative for Examination of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds2023-11-0101 November 2023 Proposed Alternative for Examination of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds IR 05000456/20230102023-10-18018 October 2023 Functional Engineering Inspection Commercial Grade Dedication Report 05000456/2023010 and 05000457/2023010 IR 05000456/20234012023-10-18018 October 2023 Security Baseline Inspection Report 05000456/2023401 and 05000457/2023401 ML23289A1582023-10-16016 October 2023 Decommissioning International - Registration of Spent Fuel Casks and Notification of Permanent Removal of All Indian Point Unit 3 Spent Fuel Assemblies from the Spent Fuel Pit RS-23-097, Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans2023-10-12012 October 2023 Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans RS-23-108, Proposed Alternative for Examinations of Examination Categories B-B, B-D, and C-A Steam Generator Pressure Retaining Welds and Full Penetration Welded Nozzles2023-10-11011 October 2023 Proposed Alternative for Examinations of Examination Categories B-B, B-D, and C-A Steam Generator Pressure Retaining Welds and Full Penetration Welded Nozzles RS-23-105, Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections2023-10-10010 October 2023 Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections RS-23-093, License Amendment to Braidwood Station, Units 1 and 2, and Byron Station, Units 1 and 2, Technical Specifications 3.7.15, Spent Fuel Pool Boron Concentration, 3.7.16, Spent Fuel.2023-09-29029 September 2023 License Amendment to Braidwood Station, Units 1 and 2, and Byron Station, Units 1 and 2, Technical Specifications 3.7.15, Spent Fuel Pool Boron Concentration, 3.7.16, Spent Fuel. ML23270A0082023-09-27027 September 2023 Registration of Spent Fuel Casks ML23263B1232023-09-20020 September 2023 HI-STORM 100 Amendment 16 Responses to Second Round Requests for Additional Information ML23226A0062023-09-19019 September 2023 Review of License Renewal Commitment Number 10 Submittal ML23234A1572023-09-14014 September 2023 Letter to Holtec International Final Safety Evaluation for Hi-2210161, Revision No. 4, Topical Report on the Radiological Fuel Qualification Methodology for Dry Storage Systems ML23145A1752023-09-12012 September 2023 NRC Choice Letter to Holtec International with Attached Safety Inspection Report, IR 72-1014/2022-201, December 12-15, 2022, Inspection of Holtec International in Camden, New Jersey (Docket Nos.: 72-1014, 72-1032) ML23180A1692023-09-11011 September 2023 Calvert Cliff Units 1 & 2, and R.E. Ginna Plant - Withdrawal of Proposed Alternatives to American Society of Mechanical Engineers (ASME) Requirements (Epids L-2022-LRR-0074, 0076, 0079, 0091, 0092, 0093 and 0094) ML23251A2512023-09-0808 September 2023 International, Submittal of Supplement to RAI Responses on HI-STORM 100 Amendment 18 ML23250A0812023-09-0707 September 2023 Registration of Spent Fuel Casks IR 05000456/20230052023-08-30030 August 2023 Updated Inspection Plan for Braidwood Station Report 05000456/2023005 and 05000457/2023005 ML23230B1582023-08-28028 August 2023 Amendment 16 to Certificate of Compliance 1014 for HI-STORM 100 Multipurpose Canister Storage System Request for Additional Information Second Round ML23234A2462023-08-25025 August 2023 Confirmation of Initial License Examination NL-23-0620, ISFSI, and Edwin I. Hatch Nuclear Plant ISFSI, Registration of Spent Fuel Cask Use2023-08-0303 August 2023 ISFSI, and Edwin I. Hatch Nuclear Plant ISFSI, Registration of Spent Fuel Cask Use 2024-02-02
[Table view] |
Text
Exelon Generation Company, LLC n ti on Braidwood Station 35100 South Route 53, Suite 84 Braceville, IL 60407-9619 www.exeloncorp.com May 16, 2019 10 CFR 72.212 BW190052 ATIN: Document Control Desk Director, Division of Spent Fuel Management Office of Nuclear Material Safety and Safeguards U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Braidwood Station, Units 1 and 2 Renewed Facility Operating License Nos. NPF-72 and NPF-77 NRG Docket Nos. STN 50-456 and STN 50-457 ISFSI Docket No. 72-73
Subject:
Registration of Use of Casks to Store Spent Fuel In accordance with 10 CFR 72.212, "Conditions of general license issued under §72.210,"
paragraph (b)(2), Exelon Generation Company, LLC (EGG) is registering, with the NRG, the use of two casks under the general license to store spent fuel at Braidwood Station. The initial use of these casks to store spent fuel occurred on April 24, 2019 and May 7, 2019. This registration is required to be submitted within 30 days. Accordingly, this submittal is due by May 24, 2019.
The following information is provided in accordance with 10 CFR 72.212(b)(2).
Licensee Name Exelon Generation Company, LLC Licensee Address Braidwood Station 35100 S. Route 53, Suite 84 Braceville, IL 60407-9619 Reactor License Number NPF-72 and NPF-77 Reactor Docket Number 50-456 and 50-457 Independent Spent Fuel Storage Installation Docket Number 72-73
May 16, 2019 U.S. Nuclear Regulatory Commission Page 2 Contact Person and Title Marta Spillie Acting Regulatory Assurance Manager Cask Certificate Number 1014, Amendment 9, Revision 1 Cask Model Number HI-STORM 1OOS, Version B Service Date April 24, 2019 Cask Identification Number Multi-Purpose Canister Type 32, Serial No. 0403 HI-STORM 100 Serial No. 0906 Service Date May 7, 2019 Cask Identification Number Multi-Purpose Canister Type 32, Serial No. 0404 HI-STORM 100 Serial No. 0907 Should you have any questions, please contact Ms. Marta Spillie, Acting Regulatory Assurance Manager, at (815) 417-4833.
Respectfully, Marri Marchionda-Palmer Site Vice President Braidwood Station cc: NRC Regional Administrator - Region Ill