Letter Sequence Other |
---|
EPID:L-2017-LLR-0075, Proposed Alternative RR-V-11 Regarding Main Steam Safety Relief Valve Testing Requirements (Open) EPID:L-2018-LLR-0075, Proposed Alternative RR-V-11 Regarding Main Steam Safety Relief Valve Testing Requirements (Open) |
|
|
|
---|
Category:Code Relief or Alternative
MONTHYEARML23150A0802023-05-30030 May 2023 Acceptance Review - Vogtle Units 1 and 2 - Proposed LAR and Relief Request to Revise TS 3.4.14.1 and IST ALT-VR-02 (EPIDs L-2023-LLA-0061 and L-2023-LLR-0023) ML23095A2962023-04-14014 April 2023 Alternative Inspection Requirements for Steam Generator Nozzle to Reactor Coolant Pump Casing Welds (Vegp 3&4-Isi1- Alt-17) ML22259A1822022-09-22022 September 2022 Request for Proposed Inservice Testing Alternative ALT-VR-01 ML22118A0762022-05-13013 May 2022 Cover Letter for Vogtle Electric Generating Plant, Units 3 and 4 Request for Alternative Requirements for Inservice Test Interval Code Edition (VEGP 3&4-IST-ALT-01R2) ML22021A0012022-01-24024 January 2022 Relief Request for Proposed Alternative Requirements for the Repair of Reactor Vessel Head Penetrations for the Fourth 10-Year Inservice Inspection Interval, VEGP-ISI-ALT-04-05, Version 1.0 ML21154A2122021-06-0303 June 2021 Enclosure 1 - Vogtle Electric Generating Plant (VEGP) Unit 3 Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1): Alternative Requirements for ASME Section III Remediation of Containment Vessel Unistrut Welding (VEGP 3-ALT-16) ML21154A2132021-06-0303 June 2021 Enclosure 2 - Vogtle Electric Generating Plant (VEGP) Unit 3 CB&I Procedure Qualification Record 14162(VEGP 3-ALT-16) ND-21-0392, Enclosure 3 - Vogtle Electric Generating Plant (VEGP) Unit 3 CB&I Procedure Qualification Record 14163 (VEGP 3-ALT-16)2021-06-0303 June 2021 Enclosure 3 - Vogtle Electric Generating Plant (VEGP) Unit 3 CB&I Procedure Qualification Record 14163 (VEGP 3-ALT-16) ML21040A1652021-02-0909 February 2021 (Vegp), Units 3 and 4, Revision to Proposed Alternative in Accordance with 10 CFR 50.55a(z)(2): Alternative Requirements for ASME Section XI Examination Coverage of Weldolet Branch Connection Welds ML20352A1552021-01-11011 January 2021 Proposed Relief Request for Alternative VEGP-ISI-ALT-04-04 to the Requirements of the ASME Code ML20307A1412020-11-12012 November 2020 Relief Request for Deferral of ASME Boiler and Pressure Vessel Code, Section XI, Required Summary Report Submittal NL-20-1262, Submission of Proposed Alternative to Submitting Vogtle Unit 2 Inservice Inspection Summary Report within 90 Days of Outage Completion2020-10-30030 October 2020 Submission of Proposed Alternative to Submitting Vogtle Unit 2 Inservice Inspection Summary Report within 90 Days of Outage Completion ML20216A3992020-08-0606 August 2020 Relief Request to Use a Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML20143A2332020-06-0303 June 2020 Relief Request for Deferral of ASME Boiler and Pressure Vessel Code, Section XI, Required Summary Report Submittal (EPID L-2020-LLR-0074 (COVID-19)) ML20132A1532020-05-14014 May 2020 ASME Code Alternative - May 14, 2020 Presubmittal Technical Exchange for Preservice Inspection (PSI) Alternative ML20034E8942020-02-11011 February 2020 Relief Request Gen-ISI-ALT-2019-01 for Proposed Alternative to Use of ASME Code Case N-831-1, Ultrasonic Examination in Lieu of Radiography for Welds in Ferritic or Austenitic Pipe Section XI, Division 1 ND-20-0083, Revision to Request for Alternative: Alternative Requirements for Inservice Test Interval Code Edition, Unit 4 (VEGP 3&4-IST-ALT-01R1)2020-02-0606 February 2020 Revision to Request for Alternative: Alternative Requirements for Inservice Test Interval Code Edition, Unit 4 (VEGP 3&4-IST-ALT-01R1) ND-19-1294, Request for Alternative: Alternative Requirements for Inservice Test Interval Code Edition, Unit 4 (VEGP 3&4-IST-ALT-01)2019-10-31031 October 2019 Request for Alternative: Alternative Requirements for Inservice Test Interval Code Edition, Unit 4 (VEGP 3&4-IST-ALT-01) ML18320A0192018-11-30030 November 2018 Relief Request Regarding Examination Coverage for Certain ASME Code Class 2 Category Welds (VEGP-ISI-RR-05) ML18296A7172018-10-31031 October 2018 Relief Request Regarding Examination Coverage for Certain Pressurizer and Steam Generator Welds (VEGP-ISI-RR-03) ND-18-1158, Revision to Request for Alternative: Alternative Requirements for Preservice Examination Volumetric Surface Configuration Requirements (VEGP 3&4-PSI/ISI-ALT-10R1)2018-08-30030 August 2018 Revision to Request for Alternative: Alternative Requirements for Preservice Examination Volumetric Surface Configuration Requirements (VEGP 3&4-PSI/ISI-ALT-10R1) NL-18-0428, Withdrawal of Proposed Alternative GEN-ISI-ALT-2017-001 Implementation of Code Case N-786-12018-04-0909 April 2018 Withdrawal of Proposed Alternative GEN-ISI-ALT-2017-001 Implementation of Code Case N-786-1 ML18054A0652018-03-0505 March 2018 Cover Letter - Vogtle Electric Generating Plant - Request for Alternative (ALT-9) ML17171A1022017-06-27027 June 2017 Inservice Inspection Alternative Regarding Category B-N-2 and B-N-3 Welds (VEGP ISI ALT 13) ML17061A2022017-03-17017 March 2017 Request for Alternative RR-PR-03 Regarding Nuclear Service Cooling Water Pump Instrument Accuracy ML17037D0502017-02-17017 February 2017 and 2; Request to Use Asme Code Case OMN-18 as an Alternative to Inservice Testing Requirements (CAC Nos. MF8188 and MF8189) NL-17-0101, Proposed Alternative VEGP-ISI-AL T-13 in Accordance with 10 CFR 50.55a(z)(2) to Extend B-N-2 and B-N-3 Inservice Inspection Examinations Schedule2017-01-26026 January 2017 Proposed Alternative VEGP-ISI-AL T-13 in Accordance with 10 CFR 50.55a(z)(2) to Extend B-N-2 and B-N-3 Inservice Inspection Examinations Schedule ML17006A1092017-01-26026 January 2017 Alternative to Inservice Inspection Regarding Reactor Pressure Vessel Threads Inflange Inspection ML16326A0442016-12-0808 December 2016 Alternative for Pump and Valve Inservice Testing Program ML16264A3212016-10-14014 October 2016 Alternatives for Pumps and Valves Inservice Testing Program ML14030A5702014-03-20020 March 2014 Request for Alternatives VEGP-ISI-ALT-06 ML13123A1602013-05-0707 May 2013 (VEGP) - Safety Evaluation of Relief Request VEGP-ISI-ALT-09, Version 2.0, Regarding Leakage Tests for Reactor Coolant Pressure Boundary Components ML13032A1062013-02-0707 February 2013 Safety Evaluation of Relief Request VEGP-ISI-ALT-08, Version 1, Regarding Installation of a Mechanical Clamp on a Class 1 Valve - Fourth 10-Year Interval ML1009001292010-06-11011 June 2010 Relief Requests VEGP-ISI-ALT-04 (Units 1 and 2) and VEGP-ISI-RR-01 (Unit 2) Inservice Inspection Alternatives for Third and Subsequent Inservice Inspection Intervals (TAC Nos. ME2226, ME2227, and ME1134) ML1012000882010-04-30030 April 2010 Acceptance of Vogtle Relief Request (VEGP-ISI-ALT-03) Dated April 7, 2010 NL-09-1410, VEGP-ISI-RR-01, Version 1.0, Relief Request in Accordance with 10 CFR 50.55a(g)(5)(iii)2009-09-0909 September 2009 VEGP-ISI-RR-01, Version 1.0, Relief Request in Accordance with 10 CFR 50.55a(g)(5)(iii) ML0731004352007-11-15015 November 2007 Third 10-Year Interval, Inservice Program Relief Request RR-V-1 (Tac Nos. MD5409 and MD5410) ML0627703592006-09-29029 September 2006 Evaluation of Relief Request ISI-GEN-ALT-06-02 NL-06-1713, Proposed Alternative for Application of Pressurizer Nozzle Full-Structural Weld Overlays2006-08-10010 August 2006 Proposed Alternative for Application of Pressurizer Nozzle Full-Structural Weld Overlays ML0510301992005-04-25025 April 2005 RR, ISI Program Intervals for Alternative Alignment of Iwe/Iwl Inspection Program (Tac No. MC4870, MC4871, MC4872, MC4873, MC4874, MC4875) ML0332800372003-11-21021 November 2003 Safety Evaluation Re. Request to Use ASME Code Case N-661 ML0225904572002-09-16016 September 2002 Code Relief, Relief Request for the Second Ten-Year Interval Inservice Testing Program 2023-05-30
[Table view] Category:Letter
MONTHYEARML24032A0252024-02-0505 February 2024 NRC Initial Test Program and Operational Programs Integrated Inspection Report 05200026-2023009 ML24010A0712024-01-31031 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (Security Notifications, Reports and Recordkeeping and Suspicious Activity Reporting) ML24031A6102024-01-31031 January 2024 Cyber Security Inspection Report 05200026/2024401 - Public ML24029A0592024-01-30030 January 2024 Request for Withholding Information from Public Disclosure Responses to NRC Request for Additional Information for Refueling Outage 1R24 Steam Generator Tube Inspection Report Enclosure 2, GAE-NRCD-RF-LR-000002 P-Attachment, Rev. 0 ML24016A1132024-01-30030 January 2024 Correction of Unit 1 Amendment Nos. 96 and 190 and Unit 2 Amendment Nos. 74 and 173 Adoption of Standard Technical Specifications Westinghouse Plants NL-24-0031, Inservice Inspection Program Owner'S Activity Report (OAR-1) for Outage 2R232024-01-29029 January 2024 Inservice Inspection Program Owner'S Activity Report (OAR-1) for Outage 2R23 IR 05000424/20244032024-01-26026 January 2024 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000424/2024403; 05000425/2024403 NL-24-0020, Plan, Unit 1 Responses to NRC Request for Additional Information for Refueling Outage 1R24 Steam Generator Tube Inspection Report2024-01-22022 January 2024 Plan, Unit 1 Responses to NRC Request for Additional Information for Refueling Outage 1R24 Steam Generator Tube Inspection Report ML23347A2092024-01-17017 January 2024 Voluntary Requests for Data, Information, And/Or Observation ML23279A0042024-01-17017 January 2024 Amendment No. 194 to Remove Combined License Appendix C NL-23-0926, Correction of Technical Specification Typographical Error2024-01-12012 January 2024 Correction of Technical Specification Typographical Error ML23341A2042024-01-12012 January 2024 Request for Additional Information Exemption Requests for Physical Barriers (EPID L-2023-LLE-0018 & L-2023-LLE-0021) ML23345A1312024-01-0303 January 2024 Withholding Letter - SNC Fleet - Physical Barriers Exemption (L-2023-LLE-0018 and L-2023-LLE-0021) ML23317A2072023-12-22022 December 2023 Issuance of Amendments 223 and 206 Regarding Revision to Technical Specifications to Adopt TSTF-339-A, Relocate Technical Specification Parameters to the COLR Consistent with WCAP-1448 ML23335A1222023-12-19019 December 2023 Safety Evaluation Regarding Implementation of Mitigating Strategies Related to Order EA-12-049 (EPID L-2023-LRQ-0002) - Letter ML23353A1702023-12-19019 December 2023 LAR-22-002, TS 3.8.3 Inverters Operating Completion Time Extension Letter ML23310A2922023-12-0707 December 2023 Issuance of Amendment for Exception to Regulatory Guide 1.163, LAR 23 007 ML23339A1812023-12-0707 December 2023 Correction Letter Regarding License Amendment Request: More Restrictive Action for Technical Specification 3.1.9 ML23338A2182023-12-0606 December 2023 Project Manager Reassignment NL-23-0878, Request for Exemption from Security Event Notification Implementation2023-11-29029 November 2023 Request for Exemption from Security Event Notification Implementation ML23289A1632023-11-28028 November 2023 Letter and Amendment 195 and 192 LAR-23-006R1 TS 3.1.9 More Restrictive Action NL-23-0827, Response to Requests for Additional Information for a License Amendment Request and a Proposed Alternative Related to TS 3.4.142023-11-17017 November 2023 Response to Requests for Additional Information for a License Amendment Request and a Proposed Alternative Related to TS 3.4.14 ML23318A4582023-11-14014 November 2023 Integrated Inspection Report 05200025/2023003 ML23312A3502023-11-14014 November 2023 Integrated Inspection Report 05200026/2023003 ML23306A3552023-11-0808 November 2023 NRC Initial Test Program and Operational Programs Integrated Inspection Report 052000/262023008 ML23268A0572023-11-0707 November 2023 Issuance of Amendments 194 & 191 Request for License Amendment Relocation of Technical Specification 3.7.9, Spent Fuel Pool Makeup Water Sources (LAR-23-003) IR 05000424/20234022023-11-0606 November 2023 Security Baseline Inspection Report 05000424/2023402 and 05000425/2023402 IR 05000424/20230032023-10-27027 October 2023 Integrated Inspection Report 05000424/2023003 and 05000425/2023003 ML23291A1512023-10-18018 October 2023 Information Request for the Cyber Security Baseline Inspection, Notification to Perform Inspection 0520026/2024401 ML23263A9852023-10-12012 October 2023 Issuance of Amendments Nos. 221 and 204, Regarding Technical Specification 5.5.11.C, Acceptance Criteria for Charcoal Filter Testing ML23283A0472023-10-0808 October 2023 Neop Letter Dated October 8, 2023 - Vogtle 3 & 4 - TS 3.7.6 License Amendment Request NL-23-0750, Response to Second Request for Additional Information Regarding License Amendment Request: Technical Specification Revision to Adopt TSTF-339-A, Relocate Technical Specification Parameters to the Colr2023-10-0404 October 2023 Response to Second Request for Additional Information Regarding License Amendment Request: Technical Specification Revision to Adopt TSTF-339-A, Relocate Technical Specification Parameters to the Colr NL-23-0745, Refueling Outage 1R24 Steam Generator Tube Inspection Report2023-09-22022 September 2023 Refueling Outage 1R24 Steam Generator Tube Inspection Report ML23254A2032023-09-13013 September 2023 Initial Test Program and Operational Programs Inspection Report 05200025/2023013 ML23241B0212023-09-12012 September 2023 Review of Quality Assurance Topical Report ML23234A2352023-09-0808 September 2023 Request for Withholding Information from Public Disclosure Notification of Full Compliance of Required Action for NRC Order EA-12-049 Mitigation Strategies for Beyond-Design-Basis External Events IR 05000424/20230912023-09-0505 September 2023 Plan Units 1 and 2 - NRC Investigation Report 2-2022-006 and Notice of Violation - NRC Inspection Report 05000424/2023091 and 05000425/2023091 ML23234A3002023-09-0101 September 2023 NRC Integrated Inspection Report 05200026/2023003 ML23243A0092023-08-31031 August 2023 Updated Inspection Plan for Vogtle Electric Generating Plant, Units 3 & 4 (Report 05200025 2023005 & 05200026 2023005) NL-23-0695, Response to Round 2 Request for Additional Information Regarding License Amendment Request for Technical Specification 3.8.3, Inverters Operating, Completion Time Extension (LAR-22-002S2)2023-08-31031 August 2023 Response to Round 2 Request for Additional Information Regarding License Amendment Request for Technical Specification 3.8.3, Inverters Operating, Completion Time Extension (LAR-22-002S2) ML23243B0252023-08-30030 August 2023 Exam Corporate Notification Letter (210 Day) IR 05000424/20230052023-08-29029 August 2023 Updated Inspection Plan for Vogtle Electric Generating Plant, Units 1 & 2 - Report 05000424/2023005 and 05000425/2023005 NL-23-0666, License Amendment Request: Remove Combined License Appendix C (LAR 23-008)2023-08-28028 August 2023 License Amendment Request: Remove Combined License Appendix C (LAR 23-008) 2024-02-05
[Table view] Category:Safety Evaluation
MONTHYEARML23317A2072023-12-22022 December 2023 Issuance of Amendments 223 and 206 Regarding Revision to Technical Specifications to Adopt TSTF-339-A, Relocate Technical Specification Parameters to the COLR Consistent with WCAP-1448 ML23335A1232023-12-19019 December 2023 Safety Evaluation Final Integrated Plan ML23243B0492023-12-19019 December 2023 VEGP Units 3 and 4, Safety Evaluation, LAR-22-002, TS 3.8.3 Inverters Operating, Completion Time Extension - Enclosure 3 ML23310A2922023-12-0707 December 2023 Issuance of Amendment for Exception to Regulatory Guide 1.163, LAR 23 007 ML23326A1362023-11-28028 November 2023 Safety Evaluation for Amendment 195 & 192 for TS 3.1.9 More Restrictive Action ML23268A0572023-11-0707 November 2023 Issuance of Amendments 194 & 191 Request for License Amendment Relocation of Technical Specification 3.7.9, Spent Fuel Pool Makeup Water Sources (LAR-23-003) ML23263A9852023-10-12012 October 2023 Issuance of Amendments Nos. 221 and 204, Regarding Technical Specification 5.5.11.C, Acceptance Criteria for Charcoal Filter Testing ML23202A1122023-08-0202 August 2023 Units, 1 and 2; and Vogtle Units 1 and 2 - Request to Use a Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML23093A0282023-08-0101 August 2023 Issuance of Amendments Nos. 220 and 203, Regarding Use of Accident Tolerant Fuel Lead Test Assemblies ML23159A1022023-07-31031 July 2023 Safety Evaluation - Vogtle Electric Generating Plant, Unit 3 Amendment No. 192 (LAR 23-001) ML23158A0182023-07-31031 July 2023 Issuance of Amendments Nos. 219 and 202, Regarding Alternative Source Term, TSTF-51, TSTF-471, and TSTF-490 ML23158A2062023-07-19019 July 2023 LAR-23-005 U/4 Amd 189 Timing of TS Effectiveness Prior to Initial Criticality Safety Evaluation ML23115A1492023-06-15015 June 2023 Issuance of Amendments No. 218 and 201 Regarding Revision to Technical Specifications to Use Online Monitoring Methodology ML23109A0702023-05-0404 May 2023 Enclosure - Safety Evaluation for VEGP3&4 ISI1-ALT-18 ML23072A2742023-05-0101 May 2023 Enclosure 3 - LAR 22-005 Safety Evaluation ML23095A2962023-04-14014 April 2023 Alternative Inspection Requirements for Steam Generator Nozzle to Reactor Coolant Pump Casing Welds (Vegp 3&4-Isi1- Alt-17) ML23095A2972023-04-14014 April 2023 Enclosure - VEGP 3&4-ISI1-ALT-17 Safety Evaluation ML23037A0912023-02-0808 February 2023 Safety Evaluation - Vogtle Unit 3 Amendment No. 190, Tech Spec Exceptions for In-Containment Refueling Water Storage Tank Operability Prior to Initial Criticality (Exigent Circumstances) ML23013A2202023-01-13013 January 2023 Safety Evaluation for License Amendment No. 189 Tech Spec Limiting Conditions for Operability Reqs for Auto Depressurization System Stage 4 Flow Paths Prior to Initial Criticality ML22284A1332022-11-22022 November 2022 LAR-22-003 U4 Electrical ITAAC Consolidation Amendment Safety Evaluation ML22286A1252022-11-16016 November 2022 Issuance of Amendments Nos. 217 & 200 Regarding Revision to Technical Specifications to Adopt TSTF-283-A, Revision 3, Modify Section 3.8 Mode Restriction Notes ML22259A1822022-09-22022 September 2022 Request for Proposed Inservice Testing Alternative ALT-VR-01 ML22249A0922022-09-14014 September 2022 Enclosure - Safety Evaluation the Requirements of the ASME Code for Main Turbine System Valve Testing, VEGP 3&4-IST-ALT-02 ML22116A0842022-07-0505 July 2022 Issuance of Amendment Nos. 215 and 198, Regarding Revision to Technical Specification 3.7.2, Main Steam Isolation Valves (Msivs) ML22118A0772022-05-13013 May 2022 Safety Evaluation Regarding Request for Alternative Requirements for Inservice Test Interval Code Edition (VEGP 3&4-IST-ALT-01R2) ML22069A0042022-04-27027 April 2022 Issuance of Amendments Revision to TSs to Adopt TSTF-269-A, Rev. 2, Allow Administrative Means of Position Verification for Locked or Sealed Valves ML21349A5182022-02-0202 February 2022 Issuance of Amendments Regarding Revision to Technical Specifications to Adopt TSTF-554, Revise RCS Leakage ML21344A0032022-01-26026 January 2022 Issuance of Amendments Regarding Revision to Use Beacon Power Distribution Monitoring System ML21316A0552022-01-0505 January 2022 1 & 2, and Vogtle Electric Generating Plant, 1 & 2 - Issuance of Amendments Regarding Revision to Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections (EPID L-2021-LLA-0163 ML21314A1502021-12-0707 December 2021 Issuance of Amendment Nos. 210 and 193, Regarding Revision to Technical Specification 3.3.5, 4.16 (Kilovolt) Kv (Engineered Safety Feature) Esf Bus Loss of Power (LOP) Instrumentation (EPID L 2021-LLA-0054 ML21270A0862021-11-18018 November 2021 Issuance of Amendments Regarding Revision to Technical Specifications 5.7, High Radiation, Administrative Controls ML21237A2402021-10-15015 October 2021 Safety Evaluation for Amendment No. LAR-21-001: Clarification of ITAAC Regarding Invessel Components ML21217A0912021-09-21021 September 2021 SNC Fleet, Issuance of Amendments Regarding Revision to Emergency Plan to Change Staffing and Extend Staff Augmentation Times for Emergency Response Organization Positions ML21217A0282021-09-17017 September 2021 Safety Evaluation for Vogtle Electric Generating Plant Units 3 and 4 Regarding Request to Revise the Emergency Plan to Change Staffing and Extend Staff Augmentation Times for Emergency Response Organization Positions ML21068A0822021-07-30030 July 2021 Issuance of Amendment Nos. 206 and 189, Regarding a License Amendment Request for a Risk-Informed Resolution to GSI-191 ML20268A0702021-07-30030 July 2021 Safety Evaluation - Vogtle GSI-191 LAR ML21167A3152021-07-30030 July 2021 Issuance of Amendments Regarding Revision to Technical Specifications to Adopt TSTF-541, Rev.2, Add Exceptions to Surveillance Requirements for Valves & Dampers Locked in Actuated Position ML21161A2012021-06-22022 June 2021 Associated Independent Spent Fuel Storage Facilities - Reduction in Commitment to the Quality ML21090A2472021-04-0909 April 2021 Safety Evaluation by the Office of Nuclear Reactor Regulation Regarding Proposed ASME Code Alternative Requirements for ASME Section XI Examination Coverage of Weldolet Branch Connections ML20352A1552021-01-11011 January 2021 Proposed Relief Request for Alternative VEGP-ISI-ALT-04-04 to the Requirements of the ASME Code ML20314A0162020-12-0707 December 2020 Safety Evaluation Vacuum Relief Valve Technical Specification Changes (LAR 20-005) ML20307A1412020-11-12012 November 2020 Relief Request for Deferral of ASME Boiler and Pressure Vessel Code, Section XI, Required Summary Report Submittal ML20269A4002020-10-27027 October 2020 Interim Staff Evaluation for Vogtle Electric Generating Plant, Units 3 and 4 Regarding Implementation of Mitigating Strategies Related to Order EA-12-049 ML20247J4642020-10-14014 October 2020 Safety Evaluation Report for Vogtle Electric Generating Plant for Amendments 185/183 (LAR 20-004) ML20237F4952020-09-24024 September 2020 Safety Evaluation for Vogtle Electric Generating Plant Units 3 and 4 Amendment Nos. 184/182 (LAR 20-003) ML20196L6822020-08-11011 August 2020 Safety Evaluation for Vogtle Electric Generating Plant Units 3 and 4 Amendment 183 and 181 for LAR 20-002 ML20216A3992020-08-0606 August 2020 Relief Request to Use a Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML20132A0782020-08-0404 August 2020 Safety Evaluation for Vogtle Electric Generating Plant Unit 3 (LAR 20-001) ML20178A1322020-07-15015 July 2020 Safety Evaluation Regarding Welded Reinforcement Bar Splices at Vogtle Electric Generating Plant Units 3 and 4 ML20143A2332020-06-0303 June 2020 Relief Request for Deferral of ASME Boiler and Pressure Vessel Code, Section XI, Required Summary Report Submittal (EPID L-2020-LLR-0074 (COVID-19)) 2023-08-02
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 October 31, 2018 Ms. Cheryl A. Gayheart Regulatory, Affairs Director Southern Nuclear Operating Co., Inc.
3535 Colonnade Parkway Birmingham, AL 35243
SUBJECT:
VOGTLE ELECTRIC GENERATING PLANT, UNITS 1 AND 2-RELIEF REQUEST REGARDING EXAMINATION COVERAGE FOR CERTAIN PRESSURIZER AND STEAM GENERATOR WELDS (VEGP-ISI-RR-03)
(EPID L-2018-LLR-0075)
Dear Ms. Gayheart:
By letter dated May 24, 2018, as supplemented by letter dated September 26, 2018, Southern Nuclear Operating Company (SNC or the licensee) submitted three requests for relief from certain requirements of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel (BPV) Code, Section XI. One of those relief requests, VEGP-ISI-RR-03, pertains to examination coverages of some pressurizer and steam generator welds achieved during the third inservice inspection (ISi) interval at Vogtle Electric Generating Plant (Vogtle),
Units 1 and 2.
Specifically, pursuant to Title 10 of the Code of Federal Regulations (10 CFR) 50.55a(g)(5)(iii),
the licensee requested relief from the required examination coverage and to use alternative requirements for inspection of Category B-B, Item Nos. B2.11 (Pressurizer Shell-to-Head Circumferential Weld), 82.40 (Steam Generator Tubesheet-to-Channel Head Weld), and Category B-D, Item No. B3.110 (Pressurizer Nozzle-to-Vessel Weld) on the basis that the ASME Code requirement is impractical.
The U.S. Nuclear Regulatory Commission (NRC) staff has reviewed the relief request and concludes, as set forth in the enclosed safety evaluation, that the licensee has adequately addressed all of the regulatory requirements set forth in 10 CFR 50.55a(g)(5)(iii). Therefore, in accordance with 10 CFR 50.55a(g)(6)(i), the NRC staff grants relief request VEGP-ISI-RR-03, for Vogtle, Units 1 and 2, for the third 10-year ISi interval, which ended on May 30, 2017.
All other ASME BPV Code, Section XI, requirements for which relief was not specifically requested and authorized herein by the staff remain applicable, including the third-party review by the Authorized Nuclear lnservice Inspector.
C. A. Gayheart If you have any questions, please contact the Vogtle project manager, Michael Orenak, at 301-415-3229 or by e-mail at Michael.Orenak@nrc.gov.
Sincerely, Michael T. Markley, Chief Plant Licensing Branch 11-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-424 and 50-425
Enclosure:
Safety Evaluation cc: Listserv
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELIEF REQUEST VEGP-ISI-RR-03 REGARDING EXAMINATION COVERAGE FOR CERTAIN PRESSURIZER AND STEAM GENERATOR WELDS SOUTHERN NUCLEAR OPERATING COMPANY. INC.
VOGTLE ELECTRIC GENERATING PLANT. UNITS 1 AND 2 DOCKET NUMBERS 50-424 AND 50-425
1.0 INTRODUCTION
By letter dated May 24, 2018 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML181448012), as supplemented by letter dated September 26, 2018 (ADAMS Accession No. ML18269A094), Southern Nuclear Operating Company (SNC or the licensee) submitted three requests for relief from certain requirements of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel (BPV) Code, Section XI. One of those relief requests, VEGP-ISI-RR-03, pertains to examination coverages of some pressurizer and steam generator welds achieved during the third inservice inspection (ISi) interval at Vogtle Electric Generating Plant, Units 1 and 2 (Vogtle ).
Specifically, pursuant to Title 10 of the Code of Federal Regulations (10 CFR) 50.55a(g)(5)(iii),
the licensee requested relief from the required examination coverage and to use alternative requirements for inspection of Category B-B, Item Nos. 82.11 (Pressurizer Shell-to-Head Circumferential Weld), 82.40 (Steam Generator Tubesheet-to-Channel Head Weld), and Category B-D, Item No. 83.11 O (Pressurizer Nozzle-to-Vessel Weld) on the basis that the ASME Code requirement is impractical.
2.0 REGULATORY REQUIREMENTS The licensee is requesting relief from the ASME BPV Code, Section XI, in accordance with 10 CFR 50.55a(g)(5)(iii). The ASME BPV Code Class 1, 2, and 3 components must meet the requirements of Section XI of the ASME BPV Code as required by 10 CFR 50.55a(g)(4), which states, in part, that:
Throughout the service life of a boiling or pressurized water-cooled nuclear power facility, components (including supports), that are classified as ASME Enclosure
Code Class 1, Class 2, and Class 3 must meet the requirements, except design and access provisions and preservice examination requirements, set forth in Section XI of editions and addenda of the ASME BPV Code ...
The licensee may request relief from portions of the ASME BPV Code as provided in 10 CFR 50.55a(g)(5)(iii), which states, in part, that:
If the licensee has determined that conformance with a Code requirement is impractical for its facility the licensee must notify the NRC [U.S. Nuclear Regulatory Commission] and submit, as specified in §50.4, information to support the determinations. Determinations of impracticality in accordance with this section must be based on the demonstrated limitations experienced when attempting to comply with the Code requirements during the inservice inspection interval for which the request is being submitted.
And, the NRC staff may grant relief from ASME BPV Code requirements as provided in 10 CFR 50.55a(g)(6)(i), which states that:
The Commission will evaluate determinations under paragraph (g)(5) of this section that code requirements are impractical. The Commission may grant such relief and may impose such alternative requirements as it determines are authorized by law, will not endanger life or property or the common defense and security, and are otherwise in the public interest giving due consideration to the burden upon the licensee that could result if the requirements were imposed on the facility.
Based on the above, and subject to the following technical evaluation, the NRC staff finds that regulatory authority exists for the licensee to request and the NRC to authorize the alternative requested by the licensee.
3.0 TECHNICAL EVALUATION
3.1 Component Affected The affected components are ASME Code Class 1 pressurizer and steam generator welds as identified in Table RR-3 of VEGP-ISI-RR-03.
- Category B-B, Item No. 82.11 Pressurizer Shell-to-Head Circumferential Weld
- Category B-B, Item No. B2.40 Steam Generator Tubesheet-to-Channel Head Weld
- Category B-D, Item No. B3.110 Pressurizer Nozzle-to-Vessel Weld 3.2 Applicable Code Edition and Addenda The code of record for the third 10-year ISi interval is Section XI of the 2001 Edition through 2003 Addenda of the ASME BPV Code.
3.3 Duration of Relief Request The licensee submitted this relief request for the third 10-year ISi interval that started on May 31, 2007, and ended on May 30, 2017.
3.4 ASME BPV Code Requirement The ASME BPV Code requirements applicable to the Class 1 welds originate in Table IWB-2500-1 of Section XI to the ASME BPV Code. For Examination Category 8-8 (Item No. 82.40), Table IWB-2500-1 requires volumetric examinations of pressure-retaining welds in the steam generator. The applicable examination volume is defined in ASME BPV Code, Section XI, Figure IWB-2500-6. For Examination Category 8-8 (Item No. 82.11) and Category 8-D (Item No. 83.110), Table IWB-2500-1 requires volumetric examinations of pressure-retaining welds in the pressurizer. The applicable examination volume is defined in ASME BPV Code, Section XI, Figures IWB-2500-1 and IWB-2500-?(b).
3.5 Impracticality of Compliance For the steam generator tubesheet-to-channel head weld (B-B/82.40), the licensee stated that a physical limitation due to the support leg(s) and identification plate obstructs and/or prohibits transducer movement along the required scan region of the channel head-to-tubesheet weld.
For pressurizer head circumferential welds (B-B/82.11 ), the licensee stated that the geometric limitations of the pressurizer supports, identification plates, and instrumentation nozzles obstruct and/or prevent transducer movement along the required scan region of the upper head-to-upper shell weld.
For pressurizer nozzle-to-head welds (B-D/83.110), the licensee stated that the geometric configuration of the 4 inch spray, 6 inch relief, and 14 inch surge nozzles prevents scanning from the nozzle side for the upper and lower nozzle-to-vessel welds.
Therefore, full ASME BPV Code coverage is not possible due to the obstructions for the first two items and the configuration of the nozzles for the third. The licensee stated that the burden caused by compliance includes the redesign and replacement of the steam generator and pressurizer nozzles and supports with nozzles of special design to allow examination.
3.6 Proposed Alternative and Bases for Relief The licensee stated that the inservice examinations of the steam generator and pressurizer welds are being conducted to the extent practical. Class 1 pressure boundary, pressure tests are performed in each refueling outage.
The licensee further stated that although there are physical obstructions which limit and/or prohibit the amount of examination coverage for those components identified in Table RR-3, reasonable assurance still exists that an acceptable level of quality and safety will be maintained. As a result, the licensee requests that relief be authorized pursuant to 10 CFR 50.55a(g)(6)(i) since it is impractical to perform the examinations as required by the ASME BPV Code.
3.7 NRC Staff Evaluation The NRC staff evaluated the affected pressurizer and steam generator welds in this relief request pursuant to 10 CFR 50.55a(g)(6)(i). The NRC staff's evaluation focused on: (1) if a technical justification exists to support the determination that the ASME BPV Code requirement is impractical; (2) that imposition of the ASME BPV Code required inspections would result in a burden to the licensee; and (3) that the licensee's reduced inspection coverage continues to
provide reasonable assurance of structural integrity and leak tightness of the subject welds.
The NRC staff finds that if these three criteria are met, the requirements of 10 CFR 50.55a(g)(6)(i) will also be met.
- 3. 7 .1 Impracticality of Compliance As described and demonstrated in the submittal (Figures RR-3-1 to RR-3-13), the affected welds can be divided into two groups: (1) head-to-shell and head-to-tube sheet welds and (2) nozzle-to-head.welds. The Group 1 welds have achieved coverages from 75 percent to 88 percent. The NRC staff examined Figures RR-3-1 to RR-3-5 and confirmed these coverages. The lowest coverage of 75 percent was caused by the curvature of the pressurizer head, the header supports, the welded pads, and instrument nozzles, adjacent to the subject circumferential weld. The Group 2 welds have achieved coverage from 15 percent to 55.9 percent. Likewise, the NRC staff examined Figures RR-3-6 to RR-3-13 and confirmed the coverages. Additionally, the predominant limitations that prevented the licensee's ultrasonic testing (UT) to achieve essentially 100 percent coverage of the Group 2 welds were the presence of the various nozzles that disallow access to the subject welds from the nozzle side.
The secondary limitations are due to the configuration of each nozzle. The lowest coverage of 15 percent for the pressurizer surge nozzle to head welds was caused by adjacent heater penetrations, in addition to the two limitations stated above. The drastic coverage difference for the surge nozzle to lower head weld between Vogtle, Unit 1 (44.6 percent), and Vogtle, Unit 2 (15 percent), is due to the much smaller transducer movement distance for Vogtle, Unit 2, in the direction perpendicular to the circumferential weld. Other Group 2 welds have approximately 50 percent coverage.
These coverages were obtained using Appendix VIII requirements of the 2001 Edition of the ASME BPV Code, Section XI, and applicable Electric Power Research Institute Performance Demonstration Initiative Program guidance and, therefore, represent best-effort UT results to the extent practical. This best effort to the extent practical is also supported by the increased coverages of 1.8, 4, 5.9, 7, and 29.6 percent for various components over what were achieved during the second ISi interval ("Vogtle Electric Generating Plant: Second Ten-Year Interval lnservice Inspection Program," dated May 29, 1997, ADAMS Legacy Accession No.
9706030146) due to improved UT equipment and transducers.
Based on the above evaluation, the NRC staff finds that achieving essentially 100 percent weld examination coverage is impractical.
3.7.2 Burden of Compliance The licensee stated that compliance would require the redesign and replacement of the steam generator and pressurizer nozzles and supports with nozzles of special design to allow full examination coverage, which would be a very large capital investment by the licensee. The NRC staff finds that replacing or reconfiguring the components of the subject welds to achieve full coverage constitutes a burden on the licensee.
- 3. 7 .3 Structural Integrity and Leak Tightness The NRC staff considered whether the licensee's proposed alternative provided reasonable assurance of structural integrity and leak tightness of the subject weld based on: (1) safety significance of unexamined volumes - unachievable coverage (e.g., any stress or the material condition of the welds, indicating that the uncovered areas are more susceptible to cracking or
degradation), and (2) operating experience supporting structural integrity and leak tightness.
For the safety significance of the unexamined volumes of welds, the NRC staff reviewed the sketches in the submittal (Figures RR-3-1 to RR-3-13) and the information provided in the supplement dated September 26, 2018:
For the 4" [inch] Spray Nozzles and 14" [inch] Surge Nozzles, the stress report shows a lower stress ratio going toward the nozzle.
The NRC staff examined the attached UT coverage plot and verified that part of the highly stressed areas were within the UT coverage.
For the 6" [inch] Safety and Relief Valve Nozzles, the design stress ratio is slightly higher in the area of limited UT scanning.
- Since the inspection results are unlikely to be affected by a small difference in stresses, the NRC staff determined that the inspection results of each component represent the entire weld. Therefore, the NRC staff finds that if significant service induced degradation had occurred, evidence of it would have been detected by the licensee-performed examinations.
- The licensee confirmed that the SNC fleet operating experience, including the Vogtle units, indicated no leakage or indications that require flaw evaluations or repairs for the subject welds.
In addition, the licensee stated that Class 1 pressure boundary, pressure tests are performed each refueling outage. Pressure tests will provide additional assurance that any through-wall cracking, if present, would be detected and the licensee will take appropriate corrective actions.
Therefore, the NRC staff finds that the UT examinations performed provide reasonable assurance of structural integrity and leak tightness of the subject welds.
4.0 CONCLUSION
As set forth above, the NRC staff finds that it is impractical for the licensee to comply with the ASME BPV Code, Section XI, requirement; that the proposed inspection provides reasonable assurance of structural integrity or leak tightness of the subject welds; and that granting relief pursuant to 10 CFR 50.55a(g)(6)(i) is authorized by law and will not endanger life or property or the common defense and security, and is otherwise in the public interest giving due consideration to the burden upon the licensee that could result if the requirements were imposed on the facility. Accordingly, the NRC staff concludes that the licensee has adequately addressed all of the regulatory requirements set forth in 10 CFR 50.55a(g)(6)(i). Therefore, the NRC staff grants relief request VEGP-ISI-RR-03 for Vogtle, Units 1 and 2, for the third 10-year ISi interval, which commenced on May 31, 2007, and ended on May 30, 2017.
All other ASME BPV Code, Section XI, requirements for which relief was not specifically requested and authorized herein by the NRC staff remain applicable, including the third party review by the Authorized Nuclear lnservice Inspector.
Principal Contributor: S. Sheng, NRR
C. A. Gayheart
SUBJECT:
VOGTLE ELECTRIC GENERATING PLANT, UNITS 1 AND 2 - RELIEF REQUEST REGARDING EXAMINATION COVERAGE FOR CERTAIN PRESSURIZER AND STEAM GENERATOR WELDS (VEGP-ISI-RR-03)
(EPID L-2018-LLR-0075) DATED OCTOBER 31, 2018 DISTRIBUTION:
PUBLIC RidsNrrKGoldstein Resource RidsNrrPMVogtle Resource RidsRgn2MailCenter Resource RidsACRS_MailCTR Resource SSheng, NRR RidsNrrDorlLpl2 1 Resource ADAMS Access1on No.: ML18296A717 *B1y e-ma1*1 OFFICE N RR/DORL/LPL2-1 /PM NRR/DORL/LPL2-1 /LA NRR/DE/EVIB/BC* NRR/DORL/LPL2-1/BC NAME MOrenak KGoldstein DAIiey MMarkley DATE 10/26/18 10/25/18 10/11/18 10/31/18 OFFICIAL RECORD COPY