Category:Inservice/Preservice Inspection and Test Report
MONTHYEARL-23-175, Submittal of Fifth Ten Year Inservice Testing Program2023-08-0101 August 2023 Submittal of Fifth Ten Year Inservice Testing Program L-22-068, Cycle 22 and Refueling Outage 22 Inservice Inspection Summary Report2022-06-30030 June 2022 Cycle 22 and Refueling Outage 22 Inservice Inspection Summary Report L-22-136, Steam Generator Tube Circumferential Crack Report - Spring 2022 Refueling Outage2022-06-0707 June 2022 Steam Generator Tube Circumferential Crack Report - Spring 2022 Refueling Outage L-21-214, Proposed Inservice Inspection Alternative RR-A22021-09-13013 September 2021 Proposed Inservice Inspection Alternative RR-A2 L-18-198, Submittal of Technical Specification 5.6.6 Steam Generator Tube Inspection 180-Day Report2018-08-21021 August 2018 Submittal of Technical Specification 5.6.6 Steam Generator Tube Inspection 180-Day Report L-18-159, Station. Unit 1 Cycle 20 and Refueling Outage 20 Inservice Inspection Summary Report2018-06-18018 June 2018 Station. Unit 1 Cycle 20 and Refueling Outage 20 Inservice Inspection Summary Report L-16-288, Submittal of Technical Specification 5.6.6 Steam Generator Tube Inspection 180-Day Report2016-10-31031 October 2016 Submittal of Technical Specification 5.6.6 Steam Generator Tube Inspection 180-Day Report L-16-253, Cycle 19 and Refueling Outage 19 Inservice Inspection Summary Report2016-08-0404 August 2016 Cycle 19 and Refueling Outage 19 Inservice Inspection Summary Report L-14-149, Cycle 18 and Refueling Outage 18, Lnservice Inspection Summary Report2014-08-0505 August 2014 Cycle 18 and Refueling Outage 18, Lnservice Inspection Summary Report L-13-067, 10 CFR 50.55a Requests RP-1, RP-1A, RP-3, RP-5, RP-6 and RV-1 Regarding Inservice Pump and Valve Testing2013-02-27027 February 2013 10 CFR 50.55a Requests RP-1, RP-1A, RP-3, RP-5, RP-6 and RV-1 Regarding Inservice Pump and Valve Testing L-13-076, 10 CFR 50.55a Notification of Impracticality and Requests for Alternatives Supporting the Third and Fourth to-Year Inservice Inspection Intervals2013-02-27027 February 2013 10 CFR 50.55a Notification of Impracticality and Requests for Alternatives Supporting the Third and Fourth to-Year Inservice Inspection Intervals L-12-288, Cycle 17 and Refueling Outage 17 Inservice Inspection Summary Report2012-09-0707 September 2012 Cycle 17 and Refueling Outage 17 Inservice Inspection Summary Report L-10-271, Cycle 16 & Refueling Outage 16 Inservice Inspection Summary Report2010-09-23023 September 2010 Cycle 16 & Refueling Outage 16 Inservice Inspection Summary Report L-08-136, Cycle 15 and Refueling Outage 15 Inservice Inspection Summary Report2008-04-29029 April 2008 Cycle 15 and Refueling Outage 15 Inservice Inspection Summary Report ML0628500982006-10-0606 October 2006 Technical Specification 4.4.5.5.b and 6.9.1.5.b: Report of Steam Generator Tube Inservice Inspection Results ML0620601832006-07-21021 July 2006 Inservice Inspection Summary Report of Cycle 14 and 14th Refueling Outage Activities ML0609404242006-03-31031 March 2006 Supplemental Information for 10 CFR 50.55a Request Regarding Inservice Inspection Requirements for the Third Ten-Year Interval (RR-A29) ML0609003742006-03-29029 March 2006 CFR 50.55a Request Regarding Inservice Inspection Requirements Third Ten-Year Interval (RR-A29) ML0605305942006-02-16016 February 2006 Technical Specifications 4.4.5.5.b and 6.9.1.5.b: Report of Steam Generator Tube Inservice Inspection Results ML0407505332004-03-11011 March 2004 Technical Specifications 4.4.5.5.b and 6.9.1.5.b: Report of Steam Generator Tube Inservice Inspection Results ML0328103882003-10-0303 October 2003 Correction of Information Provided in 10CFR50.55a Relief Requests Regarding ASME Boiler and Pressure Vessel Code Inservice Inspection Program ML0309303742003-03-31031 March 2003 Technical Specifications 4.4.5.5.b & 6.9.1.5.b: Report on Steam Generator Tube Inservice Inspection Results ML0234400122002-12-0606 December 2002 Revision to 10 CFR 50.55a Request RP-3 and Submittal of 10 CFR 50.55a Request RP-5 for the Davis-Besse Third Ten-Year Interval Inservice Testing Program ML0316405292002-03-0909 March 2002 13RFO, CRDM Nozzle, Examination Report ML0134803652002-02-13013 February 2002 Inservice Inspection Relief Request No. RR-A23 for the Second 10-year Inspection Interval ML0202505042002-01-11011 January 2002 Third Ten-Year Interval Inservice Testing Program for Davis-Besse Nuclear Power Station, Unit 1 ML0530704871994-05-27027 May 1994 Request for Modification 94-0025 2023-08-01
[Table view] Category:Letter type:L
MONTHYEARL-23-260, Corrections to the 2022 Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report for the Davis-Besse Nuclear Power Station2023-12-0707 December 2023 Corrections to the 2022 Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report for the Davis-Besse Nuclear Power Station L-23-243, Independent Spent Fuel Storage Installation - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-0606 December 2023 Independent Spent Fuel Storage Installation - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation L-23-215, Changes to Emergency Plan2023-10-19019 October 2023 Changes to Emergency Plan L-23-205, Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-09-12012 September 2023 Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments L-23-172, Quality Assurance Program Manual2023-08-31031 August 2023 Quality Assurance Program Manual L-23-188, Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-08-0707 August 2023 Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments L-23-175, Submittal of Fifth Ten Year Inservice Testing Program2023-08-0101 August 2023 Submittal of Fifth Ten Year Inservice Testing Program L-23-034, 2022 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models2023-06-13013 June 2023 2022 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models L-23-135, Response to Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-05-31031 May 2023 Response to Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations L-23-065, Annual Financial Report2023-05-22022 May 2023 Annual Financial Report L-23-131, Readiness for Resumption of NRC Supplemental Inspection2023-05-12012 May 2023 Readiness for Resumption of NRC Supplemental Inspection L-23-101, Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report for the Davis-Besse Nuclear Power Station - 20222023-05-12012 May 2023 Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report for the Davis-Besse Nuclear Power Station - 2022 L-23-092, Occupational Radiation Exposure Report for Year 20222023-04-27027 April 2023 Occupational Radiation Exposure Report for Year 2022 L-23-061, Submittal of the Decommissioning Funding Status Reports2023-03-31031 March 2023 Submittal of the Decommissioning Funding Status Reports L-23-037, and Perry Nuclear Power Plant - Independent Spent Fuel Storage Installation Changes, Tests, and Experiments2023-03-29029 March 2023 and Perry Nuclear Power Plant - Independent Spent Fuel Storage Installation Changes, Tests, and Experiments L-23-066, Annual Notification of Property Insurance Coverage2023-03-21021 March 2023 Annual Notification of Property Insurance Coverage L-23-059, Response to Apparent Violation in NRC Inspection Report 05000346/2022091; EA 23-0022023-03-0909 March 2023 Response to Apparent Violation in NRC Inspection Report 05000346/2022091; EA 23-002 L-22-212, CFR 50.55a Request RP-5 Regarding Inservice Pump Testing2023-03-0606 March 2023 CFR 50.55a Request RP-5 Regarding Inservice Pump Testing L-23-048, Response to Request for Additional Information Regarding Technical Specification 5.6.6 Steam Generator Tube Inspection 180-Day Report2023-03-0101 March 2023 Response to Request for Additional Information Regarding Technical Specification 5.6.6 Steam Generator Tube Inspection 180-Day Report L-23-057, Energy Harbor Nuclear Corp Retrospective Premium Guarantee2023-02-20020 February 2023 Energy Harbor Nuclear Corp Retrospective Premium Guarantee L-22-253, Submittal of Pressure and Temperature Limits Report, Revision 52023-01-10010 January 2023 Submittal of Pressure and Temperature Limits Report, Revision 5 L-22-284, Request for Notice of Enforcement Discretion for Technical Specification 3.7.9, Ultimate Heat Sink (UHS)2022-12-28028 December 2022 Request for Notice of Enforcement Discretion for Technical Specification 3.7.9, Ultimate Heat Sink (UHS) L-22-211, Technical Specification 5.6.6 Steam Generator Tube Inspection 180-Day Report2022-09-29029 September 2022 Technical Specification 5.6.6 Steam Generator Tube Inspection 180-Day Report L-22-216, Submittal of Pressure and Temperature Limits Report. Revision 42022-09-27027 September 2022 Submittal of Pressure and Temperature Limits Report. Revision 4 L-22-213, Occupational Radiation Exposure Report for Year 2021 - Correction2022-09-23023 September 2022 Occupational Radiation Exposure Report for Year 2021 - Correction L-22-129, Submittal of the Updated Final Safety Analysis Report, Revision 342022-09-20020 September 2022 Submittal of the Updated Final Safety Analysis Report, Revision 34 L-22-194, Submittal of Supplemental Information for the Reanalysis for Protection Against Low Temperature Reactor Coolant System Overpressure Events2022-09-19019 September 2022 Submittal of Supplemental Information for the Reanalysis for Protection Against Low Temperature Reactor Coolant System Overpressure Events L-22-203, Submittal of Evacuation Time Estimates2022-09-12012 September 2022 Submittal of Evacuation Time Estimates L-22-050, Summary of Changes to the Energy Harbor Nuclear Corp. Quality Assurance Program Manual2022-08-0909 August 2022 Summary of Changes to the Energy Harbor Nuclear Corp. Quality Assurance Program Manual L-22-152, Response to Request for Additional Information Regarding a License Amendment Request That Revises the Davis-Besse Nuclear Power Station Emergency Plan2022-07-0505 July 2022 Response to Request for Additional Information Regarding a License Amendment Request That Revises the Davis-Besse Nuclear Power Station Emergency Plan L-22-068, Cycle 22 and Refueling Outage 22 Inservice Inspection Summary Report2022-06-30030 June 2022 Cycle 22 and Refueling Outage 22 Inservice Inspection Summary Report L-22-037, 2021 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models2022-06-30030 June 2022 2021 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models L-22-149, Post Accident Monitoring Report2022-06-23023 June 2022 Post Accident Monitoring Report L-22-153, Readiness for NRC Supplemental Inspection Required for a White Finding2022-06-22022 June 2022 Readiness for NRC Supplemental Inspection Required for a White Finding L-22-098, Withdrawal of Proposed Inservice Inspection Alternative RR-A22022-06-22022 June 2022 Withdrawal of Proposed Inservice Inspection Alternative RR-A2 L-22-136, Steam Generator Tube Circumferential Crack Report - Spring 2022 Refueling Outage2022-06-0707 June 2022 Steam Generator Tube Circumferential Crack Report - Spring 2022 Refueling Outage L-22-102, Report of Facility Changes, Tests, and Experiments2022-05-16016 May 2022 Report of Facility Changes, Tests, and Experiments L-22-092, Combined Annual Radiological Environmental Operating Report and Radiological Effluent Release Report for the Davis-Besse Nuclear Power Station - 20212022-05-16016 May 2022 Combined Annual Radiological Environmental Operating Report and Radiological Effluent Release Report for the Davis-Besse Nuclear Power Station - 2021 L-22-124, Response to Request for Additional Information Regarding License Amendment Request to Revise the Design Basis for the Shield Building2022-05-12012 May 2022 Response to Request for Additional Information Regarding License Amendment Request to Revise the Design Basis for the Shield Building L-22-047, Unit No.1 - Core Operating Limits Report, Cycle 23, Revision O and Revision 12022-05-10010 May 2022 Unit No.1 - Core Operating Limits Report, Cycle 23, Revision O and Revision 1 L-22-127, Readiness for NRC Supplemental Inspection Required for a Greater than Green Finding2022-05-0606 May 2022 Readiness for NRC Supplemental Inspection Required for a Greater than Green Finding L-22-089, Occupational Radiation Exposure Report for Year 20212022-04-12012 April 2022 Occupational Radiation Exposure Report for Year 2021 L-22-056, Energy Harbor Nuclear Corp., Annual Notification of Property Insurance Coverage2022-03-22022 March 2022 Energy Harbor Nuclear Corp., Annual Notification of Property Insurance Coverage L-22-059, Response to Request for Additional Information on Proposed Inservice Test Alternative RP-32022-03-21021 March 2022 Response to Request for Additional Information on Proposed Inservice Test Alternative RP-3 L-22-074, Response to Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations2022-03-15015 March 2022 Response to Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations L-22-061, Ile Post Exam Letter L-22-0612022-02-24024 February 2022 Ile Post Exam Letter L-22-061 L-22-023, Retrospective Premium Guarantee2022-02-17017 February 2022 Retrospective Premium Guarantee L-21-266, Response to Request for Additional Information on Proposed Inservice Inspection Alternative RR-A22022-01-27027 January 2022 Response to Request for Additional Information on Proposed Inservice Inspection Alternative RR-A2 L-20-289, Emergency Plan Amendment Request2022-01-19019 January 2022 Emergency Plan Amendment Request L-21-290, Response to NRC Inspection Report 05000346/2021091, EA-21-1762021-12-21021 December 2021 Response to NRC Inspection Report 05000346/2021091, EA-21-176 2023-09-12
[Table view] |
Text
FENOC 5501 North State Route 2 Oak Harbor, Ohio 43449 Mark B. Bezilla 419-321-7676 Vice President - Nuclear Fax: 419-321-7582 June 18, 2018 L-18-159 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
SUBJECT:
Davis-Besse Nuclear Power Station, Unit No. 1 Docket No. 50-346, License No. NPF-3 Davis-Besse Nuclear Power Station. Unit 1 Cycle 20 and Refueling Outage 20 lnservice Inspection Summary Report In accordance with the 2007 Edition through the 2008 Addenda of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code, Section XI, Subsubarticle IWA-6240 and ASME Code Case N-532-5, enclosed is the summary report covering inservice inspection (ISi) activities performed during operating cycle 20 and refueling outage 20 for the Davis-Besse Nuclear Power Station.
The enclosure contains the alternate to the summary report, Form OAR-1, "Owner's Activity Report" for inservice inspections for the Class 1, 2, and 3 components. The report is for examinations performed during the cycle that were scheduled in accordance with the Fourth Interval Inspection Plan beginning September 21, 2012.
There are no regulatory commitments contained in this letter. If there are any questions or if additional information is required, please contact Mr. Thomas A Lentz, Manager- Nuclear Licensing & Regulatory Affairs, at 330-315-6810.
Jii16~
Mark B. Bezilla I
Enclosure:
ISi Owner's Activity Report, Cycle 20 and 20th Refueling Outage cc: Nuclear Regulatory Commission Region (NRC) Ill Administrator Nuclear Reactor Regulation Project Manager NRC Resident Inspector Utility Radiological Safety Board
Report No. DB-OAR1-20R Davis-Besse Nuclear Power Station Inservice Inspection Program 1R20 Owner's Activity Report FENOC .... 1 of6 ISi OWNER'S ACTIVITY REPORT CYCLE 20 & 20m REFUELING OUTAGE OUTAGE START DATE: March 3 rd, 2018 OUTAGE COMPLETION DATE: March 2?lli, 2018 REPORTING DA TE: May 31st, 2018 DAVIS-BESSE NUCLEAR POWER STATION, UNIT No. 1 5501 North State Route #2 Oak Harbor, OH 43449 OWNER: FffiSTENERGY NUCLEAR GENERATION, LLC 76 South Main St.
Akron, OH 44308 NRC DOCKET NUMBER: 50-346 OPERATION LICENSE: NPF-3 COMMERCIAL OPERATION: July 31, 1978
Report No. DB-OAR1-20R Davis-Besse Nuclear Power Station Inservice Inspection Program 1R20 Owner's Activity Report FENOC... 2of6 Prepared By: Alan Scheanwald Approved By:
Signature Date Approved By:
Report No. DB-OAR1-20R Davis-Besse Nuclear Power Station Inservice Inspection Program 1R20 Owner's Activity Report FENOC.... 3 of6 ABSTRACT The 20th cycle of operation at the Davis-Besse Nuclear Power Station began on May 9 th , 2016 and lasted until March 27th , 2018. Examinations performed during the cycle were scheduled in accordance with the 4th Interval Inspection Plan beginning September 21, 2012.
The following report is a summary of the Class 1, 2, 3 and Metal Containment (MC) inspection results performed during the 20th cycle of operation. This report was prepared in accordance with the requirements of subsubarticle IWA-6240 of Section XI of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code, 2007 Edition; with 2008 Addenda, as well as Code Case N-532-5.
The application of Code Case-N-532-5, as endorsed in Table 1, "Acceptable Section XI Code Cases" of Regulatory Guide 1.147, Revision 17 permits the issuance of an Owner's Activity Report form (OAR-1) in lieu of a traditional summary report.
Report No. DB-OAR1-20R Davis-Besse Nuclear Power Station lnservice Inspection Program 1R20 Owner's Activity Report FENOCa... 4 of6 FORM OAR-1 OWNER'S ACTIVITY REPORT Report Number DB-OAR1-20R Plant Davis-Besse Nuclear Power Station UnitNo. 1
Commercial Service Date July 31, 1978 Refueling Outage No. IR20 (if applicable)
Current Inspection Interval 41h Interval beginning 9/21/12 Current Inspection Period 2nd Period, beginning 9/21/15 w,2 nd,3ffl)
Edition and Addenda of Section XI applicable to the inspection plan 2007 Ed./ 2008 Add (4th Int.)
Date and Revision of inspection plans 4th Interval Inspection Plan Rev. 2 (3/2/16)
Edition and Addenda of Section XI applicable to repair/replacement activities, if different than the inspection plans ........ Sam=e_______
Code Case Used: N-513-3, N-532-5, N-638-4, N-639, N-663 2 N-705. N-706-1, N-722-1, N-729-4, N-770-2 (if applicable, including cases modified by Case N-532 and later revisions)
CERTIFICATE OF CONFORMANCE I certify that (a) the statements made in this report are correct; (b) the examinations and tests meet the Inspection Plan as required by the ASME Code, Section XI; and (c) the repair/replacement activities and evaluations supporting completion of iRZ.O (refueling outage number) t I CERTIFICATE OF INSERVICE INSPECTION I, the undersigned. holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and employed by "1]\t= H-~ *Q . r-, f. /J), of H:Att:f:o~b ' L, have inspected the items described in the Owner's Activity Report, and state that, to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair/replacement activities and evaluation described in this report. Furthennore, neither the Inspector nor his employer shall be liable in any manner f; any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
. Commission tJB tf'3-2'P "1 J:: A Ottrt O l OJJ,11.Jt .
(National Board Number and Endon;ement)
Report.No. DB-OAR] -20R Davis-Besse Nuclear Power Station Inservice Inspection Program IR20 Owner's Activity Report FENOC 5 of6 TABLE 1 ITEMS WITH FLAWS OR RELEVANT CONDITIONS THAT REQUIRED EVALUATION FOR CONTINUED SERVICE Examination Category and Item Description, Item Number Component ID Evaluation Description The following relevant conditions were noted during examination of Class 1 bolted connections.
- Valve DH11 (Condition Report 2018-02261) - Borated water leak at valve packing.
- Valve DH12 (Condition Report 2018-02257)- Borated water leak at valve packing.
RC13 Pressure Test
- Valve DH21 (Condition Report 2018-01918)- Borated water leak at 8-P & 815.10 Zone (Class 1 Bolted valve body-to-bonnet bolted connection.
Connections)
- Valve HP56 (Condition Report 2018-01917)- Borated water leak at valve packing.
- E24-1 Lower Manway (Condition Report 2018-02025) - Borated water leak at manway bolted connection.
All relevant conditions were addressed per IWA-5250 as necessary and evaluated per IWA-5251 and the site's boric acid program. In addition, they were cleaned prior to being returned to service.
Through-wall pinhole leak on CCW Heat Exchanger #3 (Service Water side) as noted in Condition Report 2018-00844. Evaluation completed in accordance with Component Cooling ASME Code Case N-705, "Evaluation Criteria for Temporary Acceptance of D-8 & D2.10 Water Heat Degradation in Moderate Energy Class 2 or 3 Vessels and Tanks" and First Exchanger#3 Energy procedure NOP-OP-1009, "Operability Determinations and Functionality Assessments".
Report No. DB*OARI -20R Davis-Besse Nuclear Power Station Inservice Inspection Program IR20 Owner's Activity Report FENOC 6of6 TABLE2 ABSTRACT OF REPAIR/REPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE Description of Repair/Replacement Code Class Item Description Work Date Completed Plan Number Plug tubes I OTSG I B Tubes folJowing 03/19/2018 200688195 examinations Plug tubes 1 OTSG 2A Tubes following 03/19/2018 200688194 examinations High Pressure Injection Replace socket 2 Drain Line Socket weld upstream of 03/12/2018 200743703 Weld valve 2 Valve SP9A3B Replace valve 03/25/2018 200745895 Replace muffler Hydrogen Dilution 3 with through-wall 02/22/2017 200610969 Blower Inlet Muffler defect Replace piping 3 Service Water Piping with through-wall 03/30/2018 200710491 defect Replace piping Strainer Blowdown 3 with through-wall 09/27/2017 200726604 Piping, Fl5-l defect Replace piping Strainer Blowdown 3 with through*wall 10/20/2017 200728350 Piping, F15-3 defect