Category:Inservice/Preservice Inspection and Test Report
MONTHYEARML24255A8032024-09-11011 September 2024 Technical Specification 5.6.6 Steam Generator Tube Inspection 180-Day Report L-24-032, Cycle 23 and Refueling Outage 23 Inservice Inspection Summary Report2024-07-15015 July 2024 Cycle 23 and Refueling Outage 23 Inservice Inspection Summary Report L-24-031, Unit No.1 - Steam Generator Tube Circumferential Crack Report - Spring 2024 Refueling Outage2024-05-14014 May 2024 Unit No.1 - Steam Generator Tube Circumferential Crack Report - Spring 2024 Refueling Outage L-23-175, Submittal of Fifth Ten Year Inservice Testing Program2023-08-0101 August 2023 Submittal of Fifth Ten Year Inservice Testing Program L-22-068, Cycle 22 and Refueling Outage 22 Inservice Inspection Summary Report2022-06-30030 June 2022 Cycle 22 and Refueling Outage 22 Inservice Inspection Summary Report L-22-136, Steam Generator Tube Circumferential Crack Report - Spring 2022 Refueling Outage2022-06-0707 June 2022 Steam Generator Tube Circumferential Crack Report - Spring 2022 Refueling Outage L-21-214, Proposed Inservice Inspection Alternative RR-A22021-09-13013 September 2021 Proposed Inservice Inspection Alternative RR-A2 L-18-198, Submittal of Technical Specification 5.6.6 Steam Generator Tube Inspection 180-Day Report2018-08-21021 August 2018 Submittal of Technical Specification 5.6.6 Steam Generator Tube Inspection 180-Day Report L-18-159, Station. Unit 1 Cycle 20 and Refueling Outage 20 Inservice Inspection Summary Report2018-06-18018 June 2018 Station. Unit 1 Cycle 20 and Refueling Outage 20 Inservice Inspection Summary Report L-16-288, Submittal of Technical Specification 5.6.6 Steam Generator Tube Inspection 180-Day Report2016-10-31031 October 2016 Submittal of Technical Specification 5.6.6 Steam Generator Tube Inspection 180-Day Report L-16-253, Cycle 19 and Refueling Outage 19 Inservice Inspection Summary Report2016-08-0404 August 2016 Cycle 19 and Refueling Outage 19 Inservice Inspection Summary Report L-14-149, Cycle 18 and Refueling Outage 18, Lnservice Inspection Summary Report2014-08-0505 August 2014 Cycle 18 and Refueling Outage 18, Lnservice Inspection Summary Report L-13-067, 10 CFR 50.55a Requests RP-1, RP-1A, RP-3, RP-5, RP-6 and RV-1 Regarding Inservice Pump and Valve Testing2013-02-27027 February 2013 10 CFR 50.55a Requests RP-1, RP-1A, RP-3, RP-5, RP-6 and RV-1 Regarding Inservice Pump and Valve Testing L-13-076, 10 CFR 50.55a Notification of Impracticality and Requests for Alternatives Supporting the Third and Fourth to-Year Inservice Inspection Intervals2013-02-27027 February 2013 10 CFR 50.55a Notification of Impracticality and Requests for Alternatives Supporting the Third and Fourth to-Year Inservice Inspection Intervals L-12-288, Cycle 17 and Refueling Outage 17 Inservice Inspection Summary Report2012-09-0707 September 2012 Cycle 17 and Refueling Outage 17 Inservice Inspection Summary Report L-10-271, Cycle 16 & Refueling Outage 16 Inservice Inspection Summary Report2010-09-23023 September 2010 Cycle 16 & Refueling Outage 16 Inservice Inspection Summary Report L-08-136, Cycle 15 and Refueling Outage 15 Inservice Inspection Summary Report2008-04-29029 April 2008 Cycle 15 and Refueling Outage 15 Inservice Inspection Summary Report ML0628500982006-10-0606 October 2006 Technical Specification 4.4.5.5.b and 6.9.1.5.b: Report of Steam Generator Tube Inservice Inspection Results ML0620601832006-07-21021 July 2006 Inservice Inspection Summary Report of Cycle 14 and 14th Refueling Outage Activities ML0609404242006-03-31031 March 2006 Supplemental Information for 10 CFR 50.55a Request Regarding Inservice Inspection Requirements for the Third Ten-Year Interval (RR-A29) ML0609003742006-03-29029 March 2006 CFR 50.55a Request Regarding Inservice Inspection Requirements Third Ten-Year Interval (RR-A29) ML0605305942006-02-16016 February 2006 Technical Specifications 4.4.5.5.b and 6.9.1.5.b: Report of Steam Generator Tube Inservice Inspection Results ML0407505332004-03-11011 March 2004 Technical Specifications 4.4.5.5.b and 6.9.1.5.b: Report of Steam Generator Tube Inservice Inspection Results ML0328103882003-10-0303 October 2003 Correction of Information Provided in 10CFR50.55a Relief Requests Regarding ASME Boiler and Pressure Vessel Code Inservice Inspection Program ML0309303742003-03-31031 March 2003 Technical Specifications 4.4.5.5.b & 6.9.1.5.b: Report on Steam Generator Tube Inservice Inspection Results ML0234400122002-12-0606 December 2002 Revision to 10 CFR 50.55a Request RP-3 and Submittal of 10 CFR 50.55a Request RP-5 for the Davis-Besse Third Ten-Year Interval Inservice Testing Program ML0316405292002-03-0909 March 2002 13RFO, CRDM Nozzle, Examination Report ML0134803652002-02-13013 February 2002 Inservice Inspection Relief Request No. RR-A23 for the Second 10-year Inspection Interval ML0202505042002-01-11011 January 2002 Third Ten-Year Interval Inservice Testing Program for Davis-Besse Nuclear Power Station, Unit 1 ML0530704871994-05-27027 May 1994 Request for Modification 94-0025 2024-09-11
[Table view] Category:Letter
MONTHYEARL-24-233, Proposed Alternative Request to Defer ASME Code Section XI Inservice Inspection Examinations for Pressurizer and Steam Generator Pressure-Retaining Welds and Full Penetration Welded Nozzles2024-12-18018 December 2024 Proposed Alternative Request to Defer ASME Code Section XI Inservice Inspection Examinations for Pressurizer and Steam Generator Pressure-Retaining Welds and Full Penetration Welded Nozzles L-24-259, ISFSI; Davis-Besse Nuclear Power Station, Unit No. 1 ISFSI & Perry Nuclear Power Plant, Unit No. 1 ISFSI - Triennial ISFSI Decommissioning Funding Plan2024-12-17017 December 2024 ISFSI; Davis-Besse Nuclear Power Station, Unit No. 1 ISFSI & Perry Nuclear Power Plant, Unit No. 1 ISFSI - Triennial ISFSI Decommissioning Funding Plan 05000346/LER-2021-001-02, Emergency Diesel Generator Speed Switch Failure Due to Direct Current System Ground2024-12-0909 December 2024 Emergency Diesel Generator Speed Switch Failure Due to Direct Current System Ground IR 05000346/20240102024-12-0606 December 2024 Comprehensive Engineering Team Inspection Report 05000346/2024010 L-24-227, Response to Request for Additional Information for Relief Request RR-A 12024-11-20020 November 2024 Response to Request for Additional Information for Relief Request RR-A 1 IR 05000346/20244022024-11-19019 November 2024 Material Control and Accounting Program Inspection Report 05000346/2024402 (Public) IR 05000346/20240032024-11-14014 November 2024 Integrated Inspection Report 05000346/2024003 ML24303A3282024-10-29029 October 2024 Information Request for the Cyber Security Baseline Inspection Identification to Perform Inspection ML24281A0662024-10-0404 October 2024 EN 57363 - MPR Associates, Inc. Report in Accordance with 10 CFR Part 21 on Incomplete Dedication of Contactors Supplied as Basic Components IR 05000346/20244032024-09-27027 September 2024 Security Baseline Inspection Report 05000346/2024403 ML24269A0552024-09-25025 September 2024 Submittal of the Updated Final Safety Analysis Report, Revision 35 05000346/LER-2021-001-01, Emergency Diesel Generator Speed Switch Failure Due to Direct Current System Ground2024-09-19019 September 2024 Emergency Diesel Generator Speed Switch Failure Due to Direct Current System Ground ML24134A1522024-09-17017 September 2024 Exemption from the Requirements of 10 CFR 50.71(e)(4) Final Safety Analysis Report Update Schedule (EPID L-2024-LLE-0005) - Letter ML24260A2382024-09-16016 September 2024 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information ML24255A8032024-09-11011 September 2024 Technical Specification 5.6.6 Steam Generator Tube Inspection 180-Day Report ML24255A8642024-09-0606 September 2024 Rscc Wire & Cable LLC Dba Marmon Industrial Energy & Infrastructure - Part 21 Retraction of Final Notification ML24249A1602024-09-0505 September 2024 Information Request to Support Upcoming Material Control and Accounting Inspection at Davis-Besse Nuclear Power Station L-24-188, Submittal of Quality Assurance Program Manual, Revision 302024-08-27027 August 2024 Submittal of Quality Assurance Program Manual, Revision 30 ML24239A3972024-08-23023 August 2024 Rssc Wire & Cable LLC Dba Marmon - Part 21 Final Notification - 57243-EN 57243 IR 05000346/20240052024-08-22022 August 2024 Updated Inspection Plan for Davis-Besse Nuclear Power Station (Report 05000346/2024005) L-24-186, Response to RAI for Exemption Request from 10 CFR 50.71(e)(4) Final Safety Analysis Update Schedule2024-08-15015 August 2024 Response to RAI for Exemption Request from 10 CFR 50.71(e)(4) Final Safety Analysis Update Schedule IR 05000346/20240022024-08-0101 August 2024 Integrated Inspection Report 05000346/2024002 IR 05000346/20244012024-07-30030 July 2024 Security Baseline Inspection Report 05000346/2024401 ML24208A0962024-07-25025 July 2024 57243-EN 57243 - Rssc Wire & Cable LLC, Dba Marmon - Part 21 Notification L-24-032, Cycle 23 and Refueling Outage 23 Inservice Inspection Summary Report2024-07-15015 July 2024 Cycle 23 and Refueling Outage 23 Inservice Inspection Summary Report L-24-063, License Amendment Request to Remove the Table of Contents from the Technical Specifications2024-07-0808 July 2024 License Amendment Request to Remove the Table of Contents from the Technical Specifications L-24-024, Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models2024-06-19019 June 2024 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models L-23-214, Submittal of Relief Request for Impractical American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI Examination Requirements2024-06-0505 June 2024 Submittal of Relief Request for Impractical American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI Examination Requirements L-24-019, Unit No.1 - Report of Facility Changes, Tests, and Experiments2024-05-22022 May 2024 Unit No.1 - Report of Facility Changes, Tests, and Experiments ML24142A3532024-05-21021 May 2024 Station—Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection L-24-111, Response to Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-05-15015 May 2024 Response to Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations L-24-072, Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report - 20232024-05-15015 May 2024 Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report - 2023 L-24-031, Unit No.1 - Steam Generator Tube Circumferential Crack Report - Spring 2024 Refueling Outage2024-05-14014 May 2024 Unit No.1 - Steam Generator Tube Circumferential Crack Report - Spring 2024 Refueling Outage IR 05000346/20240012024-05-0303 May 2024 Integrated Inspection Report 05000346/2024001 L-24-069, Occupational Radiation Exposure Report for Year 20232024-04-30030 April 2024 Occupational Radiation Exposure Report for Year 2023 L-24-018, Submittal of Core Operating Limits Report, Cycle 24, Revision 02024-04-16016 April 2024 Submittal of Core Operating Limits Report, Cycle 24, Revision 0 ML24089A2582024-04-0101 April 2024 Request for Information for the NRC Quuadrennial Comprehensive Engineering Team Inspection: Inspection Report 05000346/2024010 L-24-013, Annual Notification of Property Insurance Coverage2024-03-26026 March 2024 Annual Notification of Property Insurance Coverage ML24036A3472024-03-0707 March 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0076 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML24057A0752024-03-0101 March 2024 The Associated Independent Spent Fuel Storage Installations IR 05000346/20230062024-02-28028 February 2024 Re-Issue Annual Assessment Letter for Davis-Besse Nuclear Power Station (Report 05000346/2023006) ML24057A3362024-02-28028 February 2024 Annual Assessment Letter for Davis-Besse Nuclear Power Station (Report 05000346/2023006) L-23-264, Request for Exemption from 10 CFR 50.71(e)(4) Final Safety Analysis Report Update Schedule2024-02-23023 February 2024 Request for Exemption from 10 CFR 50.71(e)(4) Final Safety Analysis Report Update Schedule CP-202300502, Notice of Planned Closing of Transaction and Provision of Documents to Satisfy Order Conditions2024-02-23023 February 2024 Notice of Planned Closing of Transaction and Provision of Documents to Satisfy Order Conditions L-24-050, Retrospective Premium Guarantee2024-02-22022 February 2024 Retrospective Premium Guarantee IR 05000346/20243012024-02-0202 February 2024 NRC Initial License Examination Report 05000346/2024301 IR 05000346/20230042024-01-31031 January 2024 Integrated Inspection Report 05000346/2023004 ML23313A1352024-01-17017 January 2024 Authorization and Safety Evaluation for Alternative Request RP 5 for the Fifth 10 Year Interval Inservice Testing Program ML23353A1192023-12-19019 December 2023 Operator Licensing Examination Approval Davis Besse Nuclear Power Station, January 2024 L-23-260, Corrections to the 2022 Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report for the Davis-Besse Nuclear Power Station2023-12-0707 December 2023 Corrections to the 2022 Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report for the Davis-Besse Nuclear Power Station 2024-09-06
[Table view] |
Text
FENOC "-%5501 North State Route 2 FirstEnergy Nuclear Operating Company Oak Harbor, Ohio 43449 Mark B. Beazilla 419-321-7676 Vice President - Nuclear Fax: 419-321-7582 Docket Number 50-346 License Number NPF-3 Serial Number 3031 March 11, 2004 United States Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555-0001
Subject:
Technical Specifications 4.4.5.5.b and 6.9.1.5.b: Report of Steam Generator Tube Inservice Inspection Results Ladies and Gentlemen:
This letter is submitted in accordance with the Davis-Besse Nuclear Power Station (DBNPS), Unit Number 1, Operating License, Appendix A, Technical Specifications.
Technical Specification Surveillance Requirement 4.4.5.5.b and Administrative Controls requirement 6.9.1.5.b require the FirstEnergy Nuclear Operating Company (FENOC) to submit the complete results of Steam Generator tube inservice inspections on an annual basis. No inservice inspection of the DBNPS Steam Generator tubes was performed in 2003.
Should you have any questions or require additional information, please contact Mr. Gregory A. Dunn, Manager - Regulatory Affairs, at (419) 321-8450.
Very truly yours, MAR Enclosure cc: Regional Administrator, NRC Region III J. B. Hopkins, NRC/NRR Senior Project Manager C. S. Thomas, NRC Region III, DB-1 Senior Resident Inspector Utility Radiological Safety Board foQl
Docket Number 50-346 License Number NPF-3 Serial Number 3031 Enclosure COMMITMENT LIST The following list identifies those actions committed to by the Davis-Besse Nuclear Power Station (DBNPS) in this document. Any other actions discussed in the submittal represent intended or planned actions by the DBNPS. They are described only for information and are not regulatory commitments. Please notify the Manager -
Regulatory Affairs (419-321-8450) at the DBNPS of any questions regarding this document or any associated regulatory commitments.
COMMITMENT DUE DATE None N/A