Letter Sequence Withdrawal |
---|
|
|
|
Similar Documents at Perry |
---|
Category:Federal Register Notice
MONTHYEARML23249A1042023-10-0404 October 2023 Federal Register Notice: Notice of Intent to Conduct Scoping Process and Prepare an Environmental Impact Statement-Perry Nuclear Power Plant, Unit 1 ML23237B4412023-09-29029 September 2023 Energy Harbor Nuclear Corp. - Vistra Operations Company LLC - Federal Register Notice, Direct and Indirect License Transfer Issuance Order ML23198A0402023-08-0303 August 2023 LRA Availability FRN ML23124A0772023-05-17017 May 2023 Notice of Consideration of Approval of Indirect and Direct License Transfer for Comanche Peak Plant, Units 1 & 2, Beaver Valley Station, Units 1 & 2, Davis Besse Station, Unit 1 and Perry Plant, Unit 1 (EPID L-2023-LLM-0000) (FRN) ML23129A0112023-05-16016 May 2023 Notice of Consideration of Approval of Indirect and Direct License Transfer for Comanche Peak Plant, Units 1 & 2, Beaver Valley Station, Units 1 & 2, Davis Besse Station, Unit 1 and Perry Plant, Unit 1 (EPID L-2023-LLM-0000) (Letter) ML20335A0902020-12-21021 December 2020 Federal Register Notice - November 2020 COVID-19 Exemptions ML20271A0002020-10-13013 October 2020 FRN - Notice of Issuance of Multiple Exemptions Regarding Various Parts of 10 CFR Due to COVID-19 Impacts for September 2020 ML20213A7422020-09-24024 September 2020 Environmental Assessment and Finding of No Significant Impact Regarding Amendment to Recapture Low-Power Testing Time ML20213A7392020-09-24024 September 2020 Environmental Assessment and Finding of No Significant Impact; Issuance ML20252A0262020-09-18018 September 2020 Relief Request IR-062 Regarding Weld Examination Coverage for the Third Inservice Inspection Interval ML20171A3182020-07-13013 July 2020 FRN for Timely License Renewal Protection Requirements L-2020-LLE-0089 ML20119A0592020-05-12012 May 2020 FRN, Exemption Request from Certain Requirements of 10 CFR Part 73, Appendix B, General Criteria for Security Personnel ML19303A0672019-12-0202 December 2019 Firstenergy Nuclear Operating Company - Federal Register Notice, Order Approving Direct and Indirect Transfer of Licenses and Draft Conforming Amendments for Beaver Valley Units 1 and 2, Davis-Besse Unit 1, and Perry Unit 1 ML19238A3692019-09-0303 September 2019 Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: 09/10/2019 ML19162A1502019-07-11011 July 2019 Environmental Assessment and Finding of No Significant Impact Regarding License Amendment Request to Change Emergency Plan Staffing ML19162A1252019-07-11011 July 2019 Environmental Assessment and Finding of No Significant Impact, Issuance ML19151A4742019-06-24024 June 2019 Letter to FENOC - Individual FRN Regarding Application for Order Consenting to Transfer of Licenses and Conforming Amendments. Notice of Consideration of Approval of Transfers and Conforming Amendments and Opportunity for Comments and a Hea ML19151A4932019-06-24024 June 2019 Individual FRN Regarding Application for Transfer of Licenses and Conforming Amendments. Notice of Consideration of Approval of Transfer of Facility Operating Licenses and Conforming Amendments, and Opportunity for Comments and a Hearing ML19067A0222019-06-0404 June 2019 FENOC - Exemption (EPID-L-2018-LLE-0016) ML19067A0232019-06-0404 June 2019 FENOC - Notice of Issuance of Exemption FRN (EPID-L-2018-LLE-0016) ML19052A0412019-04-0404 April 2019 OEDO-18-00160 - Notice of Issuance of Final Director'S Decision in FRN NRC-2019-0065, Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: 03/12/20192019-02-28028 February 2019 Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: 03/12/2019 ML19056A5352019-02-28028 February 2019 Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: 03/12/2019 NRC-2018-0287, Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: 01/02/20192019-01-0202 January 2019 Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: 01/02/2019 ML18351A0022019-01-0202 January 2019 Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: 01/02/2019 NRC-2018-0187, Firstenergy Nuclear Operating Company (Fenoc); Firstenergy Nuclear Generation Company, LLC - Environmental Assessment2018-09-0404 September 2018 Firstenergy Nuclear Operating Company (Fenoc); Firstenergy Nuclear Generation Company, LLC - Environmental Assessment ML18130A8202018-09-0404 September 2018 Firstenergy Nuclear Operating Company (Fenoc); Firstenergy Nuclear Generation Company, LLC - Environmental Assessment ML18130A8852018-08-29029 August 2018 FENOC Fleet - Beaver Valley; Davis-Besse; Perry - Environment Assessment and Finding of No Significant Impact Related to Exemption Request for a Physical Barrier Requirement (CAC Nos. MG0010, MG0011, MG0012, and MG0013; EPID L-2018-LLE-0019 ML18220B3172018-08-27027 August 2018 OEDO-18-00160, Individual Fr Notice for Publication, 10 CFR 2206 Request-Action, FENOC Fleet 2.206 Petition ML18220B3142018-08-27027 August 2018 OEDO-18-00160 - Acknowledgement Letter 2.206 Petition for Citizen Complaint and Request for Enforcement Action Regarding Firstenergy Nuclear Facility Operations in Ohio and Pennsylvania NRC-2018-0174, OEDO-18-00160, Individual Fr Notice for Publication, 10 CFR 2206 Request-Action, FENOC Fleet 2.206 Petition2018-08-27027 August 2018 OEDO-18-00160, Individual Fr Notice for Publication, 10 CFR 2206 Request-Action, FENOC Fleet 2.206 Petition ML18180A2182018-07-0505 July 2018 Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: 7/17/2018 NRC-2018-0140, Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: 7/17/20182018-07-0505 July 2018 Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: 7/17/2018 ML18135A4272018-05-22022 May 2018 License Amendment Application; Withdrawal by Applicant ML18135A4352018-05-22022 May 2018 Withdrawal of Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-500, Revision 2, DC Electrical Rewrite - Update to TSTF-360 ML17213A1842017-08-0404 August 2017 Biweekly Sholly Report - Federal Register Notice Fr Publication Date: August 15, 2017 NRC-2017-0175, Biweekly Sholly Report - Federal Register Notice Fr Publication Date: August 15, 20172017-08-0404 August 2017 Biweekly Sholly Report - Federal Register Notice Fr Publication Date: August 15, 2017 ML16078A1202016-04-15015 April 2016 FRN Notice of Issuance for the Direct Transfer of License ML16061A3012016-03-0202 March 2016 Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: March 15, 2016 ML15261A6852015-09-23023 September 2015 Consideration of Approval of Transfer of License and Conforming Amendment; Correction NRC-2015-0212, Correction to Notice of Consideration of Approval of Transfer of Facility Operating License and Conforming Amendment, Opportunity for a Hearing, and Order (TAC No. MF6412) (L-15-195)2015-09-22022 September 2015 Correction to Notice of Consideration of Approval of Transfer of Facility Operating License and Conforming Amendment, Opportunity for a Hearing, and Order (TAC No. MF6412) (L-15-195) ML15261A7692015-09-22022 September 2015 Correction to Notice of Consideration of Approval of Transfer of Facility Operating License and Conforming Amendment, Opportunity for a Hearing, and Order (TAC No. MF6412) (L-15-195) ML15219A2712015-09-0808 September 2015 Federal Register Notice for Application for Direct Transfer of License, Opportunity to Comment, Request a Hearing and Petition for Leave to Intervene (TAC No. MF6412) (L-15-195) ML15219A2562015-08-26026 August 2015 Notice of Consideration of Approval of Transfer of Facility Operating License and Conforming Amendment, Opportunity for a Hearing, and Order (TAC No. MF6412) (L-15-195) NRC-2015-0204, Biweekly FRN - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - September 1, 20152015-08-21021 August 2015 Biweekly FRN - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - September 1, 2015 ML15231A8382015-08-21021 August 2015 Biweekly FRN - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - September 1, 2015 ML15148A3762015-06-0101 June 2015 Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Published June 9, 2015 ML13018A2392015-04-0808 April 2015 G20110171 - Letter to Petitioner Saporito on Proposed Director'S Decision Regarding 2.206 Petition Dated: March 12, 2011 ML15062A6212015-03-0909 March 2015 Notice of Consideration of Issuance of Amendment to Facility Operating License, Proposed No Significant Hazards Consideration Determination, and Opportunity for a Hearing; Correction NRC-2015-0007, Notice of Consideration of Issuance of Amendment to Facility Operating License, Proposed No Significant Hazards Consideration Determination, and Opportunity for a Hearing; Correction2015-03-0909 March 2015 Notice of Consideration of Issuance of Amendment to Facility Operating License, Proposed No Significant Hazards Consideration Determination, and Opportunity for a Hearing; Correction 2023-09-29
[Table view] Category:Letter
MONTHYEARIR 05000440/20230042024-01-30030 January 2024 Integrated Inspection Report 05000440/2023004 L-23-207, License Amendment Request (LAR) for Adoption of TSTF-264-A Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs2024-01-24024 January 2024 License Amendment Request (LAR) for Adoption of TSTF-264-A Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs L-24-017, 30-Day Voluntary Report in Accordance with Industry Groundwater Protection Initiative2024-01-24024 January 2024 30-Day Voluntary Report in Accordance with Industry Groundwater Protection Initiative IR 05000440/20234022024-01-10010 January 2024 Cyber Security Inspection Report 05000440/2023402 ML24003A8032024-01-0303 January 2024 Notification of NRC Fire Protection Team Inspection Request for Information ML23321A0472023-12-20020 December 2023 Letter to Rod L. Penfield - Perry Nuclear Power Plant, Unit 1 - License Renewal Regulatory Audit Regarding the Environmental Review of the License Renewal Application L-23-171, CFR 50.55a Request Number VR-9. Revision 0, Feedwater Check Valve Exercising Test Frequency2023-12-0808 December 2023 CFR 50.55a Request Number VR-9. Revision 0, Feedwater Check Valve Exercising Test Frequency L-23-244, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-0606 December 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation IR 05000440/20230112023-11-28028 November 2023 Biennial Problem Identification and Resolution Inspection Report 05000440/2023011 IR 05000440/20234032023-11-27027 November 2023 Security Baseline Inspection Report 05000440/2023403 ML23292A2972023-11-17017 November 2023 Table of Contents LAR (L-2023-LLA-0111) L-23-238, Mid-Cycle Revision to the Core Operating Limits Report for Operating Cycle 202023-11-10010 November 2023 Mid-Cycle Revision to the Core Operating Limits Report for Operating Cycle 20 L-23-052, Submittal of the Updated Safety Analysis Report, Revision 232023-10-27027 October 2023 Submittal of the Updated Safety Analysis Report, Revision 23 ML23292A2482023-10-19019 October 2023 Fws to NRC, Federal Agency Coordination Under ESA Section 7 for Perry Nuclear Plant, Unit 1, License Renewal, and Concurrence with Not Likely to Adversely Affect Determination for Northern Long-eared Bat ML23292A2472023-10-19019 October 2023 Fws to NRC, Perry Nuclear Plant, Unit 1, License Renewal List of Threatened and Endangered Species That May Occur in Your Proposed Project Location or May Be Affected IR 05000440/20230032023-10-11011 October 2023 Integrated Inspection Report 05000440/2023003 ML23249A1032023-10-0303 October 2023 Letter to Rod L. Penfield, Site Vice President-Perry Nuclear Power Plant, Unit 1-Notice of Intent to Conduct Scoping Process and Prepare an Environmental Impact Statement ML23237B4222023-09-28028 September 2023 Energy Harbor Nuclear Corp. - Vistra Operations Company LLC - Letter Regarding Order Approving Transfer of Licenses and Draft Conforming License Amendments ML23269A1242023-09-27027 September 2023 Request for Withholding Information from Public Disclosure ML23261B0192023-09-25025 September 2023 Aging Management Audit Plan Regarding the License Renewal Application Review ML23261C3642023-09-25025 September 2023 License Renewal Application Online Reference Portal ML23256A3592023-09-22022 September 2023 Determination of Acceptability and Sufficiency for Docketing, Proposed Review Schedule, and Opportunity for a Hearing Regarding the Energy Harbor Nuclear Corp. Application for License Renewal L-23-206, Ohio National Pollutant Discharge Elimination System (NPDES) Permit 3IB00016 MD2023-09-12012 September 2023 Ohio National Pollutant Discharge Elimination System (NPDES) Permit 3IB00016 MD L-23-205, Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-09-12012 September 2023 Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments L-23-172, Quality Assurance Program Manual2023-08-31031 August 2023 Quality Assurance Program Manual IR 05000440/20234012023-08-28028 August 2023 Public - Perry Nuclear Power Plant Security Baseline Inspection Report 05000440/2023401 ML23129A1722023-08-25025 August 2023 Request for Withholding Information from Public Disclosure for Beaver Valley Power Station, Units 1 and 2; Davis Besse Nuclear Power Station, Unit 1; and Perry Nuclear Power Plant, Unit 1 IR 05000440/20230052023-08-24024 August 2023 Updated Inspection Plan for Perry Nuclear Power Plant (Report 05000440/2023005) ML23172A2852023-08-23023 August 2023 Safety Evaluation Irradiated Fuel Management Plan and Preliminary Decommissioning Cost Estimate ML23227A2202023-08-15015 August 2023 Information Request to Support Upcoming Problem Identification and Resolution Inspection at Perry Nuclear Power Plant L-23-001, License Amendment Request to Remove the Table of Contents from the Technical Specifications2023-08-0707 August 2023 License Amendment Request to Remove the Table of Contents from the Technical Specifications L-23-188, Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-08-0707 August 2023 Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments IR 05000440/20230022023-08-0202 August 2023 Integrated Inspection Report 05000440/2023002 L-23-174, 30-Day Voluntary Report in Accordance with Industry Groundwater Protection Initiative2023-07-19019 July 2023 30-Day Voluntary Report in Accordance with Industry Groundwater Protection Initiative ML23198A2842023-07-17017 July 2023 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection L-23-146, License Renewal Application for the Perry Nuclear Power Plant2023-07-0303 July 2023 License Renewal Application for the Perry Nuclear Power Plant IR 05000440/20230102023-06-29029 June 2023 Comprehensive Engineering Team Inspection Report 05000440/2023010 ML23178A2422023-06-28028 June 2023 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch III L-23-051, Plan, Nineteenth Inservice Inspection Summary Report2023-06-22022 June 2023 Plan, Nineteenth Inservice Inspection Summary Report L-23-050, 2022 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models2023-06-22022 June 2023 2022 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models L-22-249, License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-276-A Revision 2, Change TS 3.8.1. AC Sources-Operating. to Clarify the Power Factor Requirements When Performing Diesel Gener2023-06-0505 June 2023 License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-276-A Revision 2, Change TS 3.8.1. AC Sources-Operating. to Clarify the Power Factor Requirements When Performing Diesel Gener ML23144A3562023-05-25025 May 2023 Information Meeting with a Question and Answer Session to Discuss NRC 2022 End of Cycle Plant Performance Assessment of Perry Nuclear Power Plant, Unit 1 L-23-134, Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations2023-05-23023 May 2023 Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations L-23-065, Annual Financial Report2023-05-22022 May 2023 Annual Financial Report ML23124A1742023-05-17017 May 2023 Energy Harbor Fleet Vistra License Transfer - Request for Withholding Information from Public Disclosure for Commance Peak Plant, Units 1 & 2, Beaver Valley Station, Units 1 & 2, Davis Besse Station, Unit 1 and Perry Plant, Unit 1 ML23129A0112023-05-16016 May 2023 Notice of Consideration of Approval of Indirect and Direct License Transfer for Comanche Peak Plant, Units 1 & 2, Beaver Valley Station, Units 1 & 2, Davis Besse Station, Unit 1 and Perry Plant, Unit 1 (EPID L-2023-LLM-0000) (Letter) IR 05000440/20230012023-05-0404 May 2023 Integrated Inspection Report (05000440/2023001) L-23-121, Annual Radiological Effluent Release Report2023-04-26026 April 2023 Annual Radiological Effluent Release Report L-23-122, Annual Radiological Environmental Operating Report2023-04-26026 April 2023 Annual Radiological Environmental Operating Report 2024-01-30
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 May 22, 2018 Mr. David B. Hamilton Site Vice President FirstEnergy Nuclear Operating Company Mail Stop A-PY-A290 P.O. Box 97, 10 Center Road Perry, OH 44081-0097
SUBJECT:
PERRY NUCLEAR POWER PLANT, UNIT NO. 1 - WITHDRAWAL OF AMENDMENT REQUEST FOR ADOPTION OF TECHNICAL SPECIFICATIONS TASK FORCE (TSTF) TRAVELER TSTF-500, REVISION 2, "DC ELECTRICAL REWRITE- UPDATE TO TSTF-360" (EPID L-2017-LLA-0438)
Dear Mr. Hamilton:
By letter dated December 20, 2017, you applied for an amendment to the Perry Nuclear Power Plant, Unit No. 1, Facility Operating License No. NPF-58. The proposed change would have modified the facility technical specifications (TSs) pertaining to direct current (DC) electrical systems, specifically limiting conditions for operation 3.8.4, 3.8.5, and 3.8.6. The proposed amendment would have also added a new Battery and Monitoring Maintenance Program to TS Section 5.5, "Programs and Manuals." As noted in your application, the proposed changes were consistent with Technical Specifications Task Force (TSTF) Traveler TSTF-500, Revision 2, "DC Electrical Rewrite - Update to TSTF-360." Subsequently, by letter dated May 14, 2018, you withdrew the amendment request.
The U.S. Nuclear Regulatory Commission has filed the enclosed Notice of Withdrawal of Application for Amendment to Facility Operating License with the Office of the Federal Register for publication.
Sincerely, Kimberly J. Green, Senior Project Manager Plant Licensing Branch Ill Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-440
Enclosure:
Notice of Withdrawal cc: Listserv
ENCLOSURE FEDERAL REGISTER NOTICE
[7590-01-P]
NUCLEAR REGULATORY COMMISSION
[Docket No. 50-440; NRC-2018-0021]
FirstEnergy Nuclear Operating Company Perry Nuclear Power Plant, Unit No. 1 AGENCY: Nuclear Regulatory Commission.
ACTION: License amendment application; withdrawal by applicant.
SUMMARY
- The U.S. Nuclear Regulatory Commission (NRC) has granted the request of FirstEnergy Nuclear Operating Company to withdraw its application dated December 20, 2017, for a proposed amendment to the Perry Nuclear Power Plant, Unit. No. 1, Facility Operating License No. NPF-58. The proposed amendment would have modified the facility technical specifications (TSs) pertaining to direct current electrical systems, specifically limiting conditions for operation 3.8.4, 3.8.5, and 3.8.6. The proposed amendment would have also added a new Battery and Monitoring Maintenance Program to TS Section 5.5, "Programs and Manuals."
DATES: [INSERT DATE OF PUBLICATION IN THE FEDERAL REGISTER].
ADDRESSES: Please refer to Docket ID NRC-2018-0021 when contacting the NRC about the availability of information regarding this document. You may obtain publicly-available information related to this document using any of the following methods:
- Federal Rulemaking Web Site: Go to http://www.regulations.gov and search for Docket ID NRC-2018-0021. Address questions about NRC dockets to Jennifer Borges; telephone: 301-287-9127; e-mail: Jennifer.Borges@nrc.gov. For technical questions, contact the individual listed in the FOR FURTHER INFORMATION CONTACT section of this document.
- NRC's Agencywide Documents Access and Management System
{ADAMS): You may obtain publicly-available documents online in the ADAMS Public Documents collection at http://www.nrc.gov/reading-rm/adams.html. To begin the search, select "ADAMS Public Documents" and then select "Begin Web-based ADAMS Search." For problems with ADAMS, please contact the NRC's Public Document Room (PDR) reference staff at 1-800-397-4209, 301-415-4737, or by e-mail to pdr.resource@nrc.gov. The ADAMS accession number for each document referenced (if it is available in ADAMS) is provided the first time that it is mentioned in this document.
- NRC's PDR: You may examine and purchase copies of public documents at the NRC's PDR, Room 01-F21, One White Flint North, 11555 Rockville Pike, Rockville, Maryland 20852.
FOR FURTHER INFORMATION CONTACT: Kimberly Green, Office of Nuclear Reactor Regulation, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001; telephone: 301-415-1627, e-mail: Kimberly.Green@nrc.gov.
2
SUPPLEMENTARY INFORMATION: The NRC has granted the request of FirstEnergy Nuclear Operating Company {the licensee) to withdraw its December 20, 2017, application (ADAMS Accession No. ML17355A019) for proposed amendment to Facility Operating License No. NPF-58 for the Perry Nuclear Power Plant, Unit No. 1, located in Lake County, Ohio.
The proposed amendment would have revised TS requirements related to direct current electrical systems, specifically limiting conditions for operation 3.8.4, 3.8.5, and 3.8.6. The amendment would have also added a new Battery and Monitoring Maintenance Program to TS Section 5.5, "Programs and Manuals."
The Commission had previously issued a Notice of Consideration of Issuance of Amendment published in the Federal Register on February 13, 2018 (83 FR 6225).
However, by letter dated May 14, 2018, the licensee withdrew the proposed change (ADAMS Accession No. ML18135A012).
For further details with respect to this action, see the application for amendment dated December 20, 2017, and the licensee's letter dated May 14, 2018, which withdrew the application for license amendment.
Dated at Rockville, Maryland, this 22nd day of May, 2018.
For the Nuclear Regulatory Commission.
IRA/
Kimberly J. Green, Senior Project Manager, Plant Licensing Branch Ill, Division of Operating Reactor Licensing, Office of Nuclear Reactor Regulation.
3
SUBJECT:
PERRY NUCLEAR POWER PLANT, UNIT NO. 1 - WITHDRAWAL OF AMENDMENT REQUEST FOR ADOPTION OF TECHNICAL SPECIFICATIONS TASK FORCE (TSTF) TRAVELER TSTF-500, REVISION 2, "DC ELECTRICAL REWRITE- UPDATE TO TSTF-360" (EPID L-2017-LLA-0438)
DATED MAY 22, 2018 DISTRIBUTION:
PUBLIC PM Reading File RidsACRS_MailCTR Resource RidsNrrDorlLpl3 Resource RidsNrrDeEeob Resource RidsNrrPMPerry Resource RidsNrrLASRohrer Resource RidsRgn3MailCenter Resource ADAMS Accession Nos.: LTR (NRR-106) ML18135A435 FRN (ADM-012) ML18135A427 OFFICE NRR/D0RL/LPL3/PM NRR/D0RL/LPL3/LA NRR/D0RL/LPL3/BC NRR/D0RL/LPL3/PM NAME KGreen SRohrer DWrona KGreen DATE 05/16/18 05/16/18 05/18/18 05/22/18 OFFICIAL AGENCY RECORD