UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 August 26, 2015 Mr. Paul A. Harden Senior Vice President and Chief Operating Officer FirstEnergy Nuclear Operating Company 76 South Main Street Akron, OH 44308
SUBJECT:
PERRY NUCLEAR POWER PLANT, UNIT NO. 1 - NOTICE OF CONSIDERATION OF APPROVAL OF TRANSFER OF FACILITY OPERATING LICENSE AND CONFORMING AMENDMENT, OPPORTUNITY FOR A HEARING, AND ORDER (TAC NO. MF6412) (L-15-195)
Dear Mr. Harden:
Enclosed is a copy of a Notice of Consideration of Approval of Transfer of Facility Operating License and Conforming Amendment, and Opportunity for a Hearing related to the application dated June 30, 2015, filed by FirstEnergy Nuclear Operating Company. Portions of the application contain sensitive unclassified non-safeguards information and, accordingly, those portions are withheld from public disclosure. The application, pursuant to Title 10 of the Code of Federal Regulations (10 CFR), Section 50.80, seeks U.S. Nuclear Regulatory Commission (NRC) approval of the proposed direct transfer of the leased interests in the Perry Nuclear Power Plant, Unit No. 1, Facility Operating License No. NPF-58 from the current holder of the license, Ohio Edison Company to FirstEnergy Nuclear Generation, LLC. The application also seeks the issuance of a conforming amendment to the license to reflect the transfer.
This notice is being forwarded to the Office of the Federal Register for publication.
Sincerely, 1-<~<~{g~
Kimberly J. Green, Senior Project Manager Plant Licensing Branch 111-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-440
Enclosure:
Federal Register Notice cc w/encl: Distribution via Listserv
ENCLOSURE FEDERAL REGISTER NOTICE
[7590-01-P]
NUCLEAR REGULATORY COMMISSION Docket No. 50-440; NRC-20YY~:xxxx Perry Nuclear Power Plant, Unit 1; Consideration of Approval of Transfer of License and Conforming Amendment AGENCY: Nuclear Regulatory Commission.
ACTION: Application for direct transfer of license; opportunity to comment, request a hearing, and petition for leave to intervene.
SUMMARY
- The U.S. Nuclear Regulatory Commission (NRC) received and is considering approval of an application filed by FirstEnergy Nuclear Operating Company (FENOC) on June 30, 2015. The application seeks NRC approval of the direct transfer of the leased interests in NPF-58 for Perry Nuclear Power Plant, Unit 1, from the current holder, the Ohio Edison Company (OE), to FirstEnergy Nuclear Generation, LLC (FENGen). The NRC is also considering amending the facility operating license for administrative purposes to reflect the proposed transfer.
DATES: Comments must be filed by [INSERT DATE 30 DAYS FROM DATE OF PUBLICATION IN THE FEDERAL REGISTER]. A request for a hearing must be filed by
[INSERT DATE 20 DAYS FROM DATE OF PUBLICATION IN THE FEDERAL REGISTER].
Any potential party as defined in § 2.4 of Title 10 of the Code of Federal Regulations (1 O CFR),
who believes access to SUNSI is necessary to respond to this notice must request document access by [INSERT DATE 10 DAYS FROM DATE OF PUBLICATION IN THE FEDERAL REGISTER].
ADDRESSES: You may submit comments by any of the following methods (unless this document describes a different method for submitting comments on a specific subject):
- Federal Rulemaking Web site: Go to http://www.regulations.gov and search for Docket ID <1~SEflT: NRC-20YY~XXXX>. Address questions about NRC dockets to Carol Gallagher; telephone: 301-415-3463; e-mail: Carol.Gallagher@nrc.gov. For technical questions contact the individual listed in the FOR FURTHER INFORMATION CONTACT section of this document.
- E-mail comments to: Hearingdocket@nrc.gov. If you do not receive an automatic e-mail reply confirming receipt, then contact us at 301-415-1677.
- Fax comments to: Secretary, U.S. Nuclear Regulatory Commission at 301-415-1101.
- Mail comments to: Secretary, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, ATTN: Rulemakings and Adjudications Staff.
- Hand deliver comments to: 11555 Rockville Pike, Rockville, Maryland 20852, between 7:30 a.m. and 4:15 p.m. (Eastern Time) Federal workdays; telephone: 301-415-1677.
For additional direction on obtaining information and submitting comments, see "Obtaining Information and Submitting Comments" in the SUPPLEMENTARY INFORMATION section of this document.
FOR FURTHER INFORMATION CONTACT: Kimberly Green, Office of Nuclear Reactor Regulation, telephone: 301-415-1627, e-mail: Kimberly.Green@nrc.gov; U.S. Nuclear Regulatory Commission, Washington DC 20555-0001.
SUPPLEMENTARY INFORMATION:
2
I. Obtaining Information and Submitting Comments.
A. Obtaining Information.
Please refer to Docket ID <INS~RT: NRC-20YY.-XXXX> when contacting the NRC about the availability of information for this action. You may obtain publicly-available information related to this action by any of the following methods:
- Federal rulemaking Web Site: Go to http://www.regulations.gov and search for Docket ID <Jf9Sef:(:t:: NRc.:2ovy.:xxXX>.
- NRC's Agencywide Documents Access and Management System (ADAMS):
You may obtain publicly-available documents online in the ADAMS Public Documents collection at http://www.nrc.gov/reading-rm/adams.html. To begin the search, select "ADAMS Public Documents" and then select "Begin Web-based ADAMS Search." For problems with ADAMS, please contact the NRC's Public Document Room (PDR) reference staff at 1-800-397-4209, 301-415-4737, or by e-mail to pdr.resource@nrc.gov. The Application for Order Consenting to Transfer of Licenses and Approving Conforming License Amendments is available in ADAMS under Accession No. ML15181A366.
- NRC's PDR: You may examine and purchase copies of public documents at the NRC's PDR, Room 01-F21, One White Flint North, 11555 Rockville Pike, Rockville, Maryland 20852.
B. Submitting Comments.
Please include Docket ID <NRC-20YY-XXXX>, facility name, unit number, application date, and subject in your comment submission.
3
The NRC cautions you not to include identifying or contact information that you do not want to be publicly disclosed in your comment submission. The NRC will post all comment submissions at http://www.regulations.gov as well as enter the comment submissions into ADAMS. The NRC does not routinely edit comment submissions to remove identifying or contact information.
If you are requesting or aggregating comments from other persons for submission to the NRC, then you should inform those persons not to include identifying or contact information that they do not want to be publicly disclosed in their comment submission. Your request should state that the NRC does not routinely edit comment submissions to remove such information before making the comment submissions available to the public or entering the comment into ADAMS.
II. Introduction.
The NRC is considering the issuance of an order under 10 CFR 50.80 approving the direct transfer of Perry Nuclear Power Plant, Unit 1, NPF-58, to the extent currently held by OE.
The transfer would be to FENGen. The NRC is also considering amending the facility operating licenses for administrative purposes to reflect the proposed transfer.
Following approval of the proposed direct transfer of control of the license, FENGen would acquire 12.58 percent of OE's ownership interest in the facility.
No physical changes to the Perry Nuclear Power Plant, Unit 1, or operational changes are being proposed in the application.
The NRC's regulations at 10 CFR 50.80 state that no license, or any right thereunder, shall be transferred, directly or indirectly, through transfer of control of the license, unless the Commission gives its consent in writing. The Commission will approve an application for the 4
direct transfer of a license if the Commission determines that the proposed transferee is qualified to hold the license, and that the transfer is otherwise consistent with applicable provisions of law, regulations, and orders issued by the Commission.
Before issuance of the proposed conforming license amendment, the Commission will have made findings required by the Atomic Energy Act of 1954, as amended (the Act), and the Commission's regulations.
As provided in 10 CFR 2.1315, unless otherwise determined by the Commission with regard to a specific application, the Commission has determined that any amendment to the license of a utilization facility, which does no more than conform the license to reflect the transfer action involves no significant hazards consideration. No contrary determination has been made with respect to this specific license amendment application. In light of the generic determination reflected in 10 CFR 2.1315, no public comments with respect to significant hazards considerations are being solicited, notwithstanding the general comment procedures contained in 10 CFR 50.91.
Ill. Opportunity to Comment.
Within 30 days from the date of publication of this notice, persons may submit written comments regarding the license transfer application, as provided for in 10 CFR 2.1305. The Commission will consider and, if appropriate, respond to these comments, but such comments will not otherwise constitute part of the decisional record. Comments should be submitted as described in the ADDRESSES section of this document.
IV. Opportunity to Request a Hearing and Petition for Leave to Intervene.
5
Within 20 days from the date of publication of this notice, any person(s) whose interest may be affected by the Commission's action on the application may request a hearing and intervention via electronic submission through the NRC's E-filing system. Requests for a hearing and petitions for leave to intervene should be filed in accordance with the Commission's rules of practice set forth in Subpart C "Rules of General Applicability: Hearing Requests, Petitions to Intervene, Availability of Documents, Selection of Specific Hearing Procedures, Presiding Officer Powers, and General Hearing Management for NRC Adjudicatory Hearings,"
of 10 CFR Part 2. In particular, such requests and petitions must comply with the requirements set forth in 10 CFR 2.309, which is available at the NRC's PDR, located at 01 F21, 11555 Rockville Pike (first floor), Rockville, Maryland 20852. The NRC regulations are accessible electronically from the NRC Library on the NRC's public Web site at http://www.nrc.gov/reading-rm/doc-collections/cfr/.
As required by 10 CFR 2.309, a request for hearing or petition for leave to intervene must set forth with particularity the interest of the petitioner in the proceeding and how that interest may be affected by the results of the proceeding. The hearing request or petition must specifically explain the reasons why intervention should be permitted, with particular reference to the following general requirements: (1) the name, address, and telephone number of the requester or petitioner; (2) the nature of the requester's/petitioner's right under the Act to be made a party to the proceeding; (3) the nature and extent of the requester's/petitioner's property, financial, or other interest in the proceeding; and (4) the possible effect of any decision or order which may be entered in the proceeding on the requester's/petitioner's interest. The hearing request or petition must also include the specific contentions that the requester/petitioner seeks to have litigated at the proceeding.
For each contention, the requester/petitioner must provide a specific statement of the issue of law or fact to be raised or controverted, as well as a brief explanation of the basis for 6
the contention. Additionally, the requester/petitioner must demonstrate that the issue raised by
.each contention is within the scope of the proceeding and is material to the findings that the NRC must make to support the granting of a license amendment in response to the application.
The hearing request or petition must also include a concise statement of the alleged facts or expert opinion that support the contention and on which the requester/petitioner intends to rely at the hearing, together with references to those specific sources and documents. The hearing request or petition must provide sufficient information to show that a genuine dispute exists with the applicant on a material issue of law or fact, including references to specific portions of the application for amendment that the petitioner disputes and the supporting reasons for each dispute. If the requester/petitioner believes that the application for amendment fails to contain information on a relevant matter as required by law, the requester/petitioner must identify each failure and the supporting reasons for the requester's/petitioner's belief. Each contention must be one which, if proven, would entitle the requester/petitioner to relief. A requester/petitioner who does not satisfy these requirements for at least one contention will not be permitted to participate as a party.
Those permitted to intervene become parties to the proceeding, subject to any limitations in the order granting leave to intervene, and have the opportunity to participate fully in the conduct of the hearing with respect to resolution of that person's admitted contentions, including the opportunity to present evidence and to submit a cross-examination plan for cross-examination of witnesses, consistent with NRC regulations, policies, and procedures. The Atomic Safety and Licensing Board will set the time and place for any prehearing conferences and evidentiary hearings, and the appropriate notices will be provided.
Requests for hearing, petitions for leave to intervene, and motions for leave to file contentions after the deadline in 10 CFR 2.309(b) will not be entertained absent a determination 7
by the presiding officer that the new or amended filing demonstrates good cause by satisfying the three factors in 10 CFR 2.309(c)(1 ).
A State, local governmental body, Federally-recognized Indian Tribe, or agency thereof may submit a petition to the Commission to participate as a party under 10CFR2.309(h)(1 ).
The petition should state the nature and extent of the petitioner's interest in the proceeding.
The petition should be submitted to the Commission by [INSERT DATE 20 DAYS FROM DATE OF PUBLICATION IN THE FEDERAL REGISTER]. The petition must be filed in accordance with the filing instructions in Section IV of this document, and should meet the requirements for petitions for leave to intervene set forth in this section, except that under § 2.309(h)(2) a State, local governmental body, or Federally-recognized Indian tribe, or agency thereof does not need to address the standing requirements in 10 CFR 2.309(d) if the facility is located within its boundaries. A State, local governmental body, Federally-recognized Indian Tribe, or agency thereof may also have the opportunity to participate under 10 CFR 2.31 S(c).
If a hearing is granted, any person who does not wish, or is not qualified, to become a party to the proceeding may, in the discretion of the presiding officer, be permitted to make a limited appearance pursuant to the provisions of 10 CFR 2.315(a). A person making a limited appearance may make an oral or written statement of position on the issues, but may not otherwise participate in the proceeding. A limited appearance may be made at any session of the hearing or at any prehearing conference, subject to the limits and conditions as may be imposed by the presiding officer. Persons desiring to make a limited appearance are requested to inform the Secretary of the Commission by [INSERT DATE 60 DAYS FROM DATE OF PUBLICATION IN THE FEDERAL REGISTER].
V. Electronic Submissions (E-Filing).
8
All documents filed in NRC adjudicatory proceedings, including a request for hearing, a petition for leave to intervene, any motion or other document filed in the proceeding prior to the submission of a request for hearing or petition to intervene, and documents filed by interested governmental entities participating under 10 CFR 2.31 S(c), must be filed in accordance with the NRC's E-Filing rule (72 FR 49139; August 28, 2007). The E-Filing process requires participants to submit and serve all adjudicatory documents over the internet, or in some cases to mail copies on electronic storage media. Participants may not submit paper copies of their filings unless they seek an exemption in accordance with the procedures described below.
To comply with the procedural requirements of E-Filing, at least 1O days prior to the filing deadline, the participant should contact the Office of the Secretary by e-mail at hearing.docket@nrc.gov, or by telephone at 301-415-1677, to request (1) a digital identification (ID) certificate, which allows the participant (or its counsel or representative) to digitally sign documents and access the E-Submittal server for any proceeding in which it is participating; and (2) advise the Secretary that the participant will be submitting a request or petition for hearing (even in instances in which the participant, or its counsel or representative, already holds an NRG-issued digital ID certificate). Based upon this information, the Secretary will establish an electronic docket for the hearing in this proceeding if the Secretary has not already established an electronic docket.
Information about applying for a digital ID certificate is available on the NRC's public Web site at http://www.nrc.gov/site-help/e-submittals/qetting-started.html. System requirements for accessing the E-Submittal server are detailed in the NRC's "Guidance for Electronic Submission," which is available on the agency's public Web site at http://www.nrc.gov/site-help/e-submittals.html. Participants may attempt to use other software not listed on the Web site, but should note that the NRC's E-Filing system does not support unli~ted software, and the NRC Meta System Help Desk will not be able to offer assistance in using unlisted software.
9
If a participant is electronically submitting a document to the NRC in accordance with the E-Filing rule, the participant must file the document using the NRC's online, Web-based submission form. In order to serve documents through the Electronic Information Exchange System, users will be required to install a Web browser plug-in from the NRC's Web site.
Further information on the Web-based submission form, including the installation of the Web browser plug-in, is available on the NRC's public Web site at http://www.nrc.gov/site-help/e-submittals.html.
Once a participant has obtained a digital ID certificate and a docket has been created, the participant can then submit a request for hearing or petition for leave to intervene.
Submissions should be in Portable Document Format (PDF) in accordance with NRC guidance available on the NRC's public Web site at http://www.nrc.gov/site-help/e-submittals.html. A filing is considered complete at the time the documents are submitted through the NRC's E-Filing system. To be timely, an electronic filing must be submitted to the E-Filing system no later than 11 :59 p.m. Eastern Time on the due date. Upon receipt of a transmission, the E-Filing system time-stamps the document and sends the submitter an e-mail notice confirming receipt of the document. The E-Filing system also distributes an e-mail notice that provides access to the document to the NRC's Office of the General Counsel and any others who have advised the Office of the Secretary that they wish to participate in the proceeding, so that the filer need not serve the documents on those participants separately. Therefore, applicants and other participants (or their counsel or representative) must apply for and receive a digital ID certificate before a hearing request/petition to intervene is filed so that they can obtain access to the document via the E-Filing system.
A person filing electronically using the NRC's adjudicatory E-Filing system may seek assistance by contacting the NRC Meta System Help Desk through the "Contact Us" link located on the NRC's public Web site at http://www.nrc.gov/site-help/e-submittals.html, by e-mail to 10
MSHD.Resource@nrc.gov, or by a toll-free call at 1-866-672-7640. The NRC Meta System Help Desk is available between 8 a.m. and 8 p.m., Eastern Time, Monday through Friday, excluding government holidays.
Participants who believe that they have a good cause for not submitting documents electronically must file an exemption request, in accordance with 10 CFR 2.302(g), with their initial paper filing requesting authorization to continue to submit documents in paper format.
Such filings must be submitted by: (1) first class mail addressed to the Office of the Secretary of the Commission, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, Attention: Rulemaking and Adjudications Staff; or (2) courier, express mail, or expedited delivery service to the Office of the Secretary, Sixteenth Floor, One White Flint North, 11555 Rockville Pike, Rockville, Maryland, 20852, Attention: Rulemaking and Adjudications Staff.
Participants filing a document in this manner are responsible for serving the document on all other participants. Filing is considered complete by first-class mail as of the time of deposit in the mail, or by courier, express mail, or expedited delivery service upon depositing the document with the provider of the service. A presiding officer, having granted an exemption request from using E-Filing, may require a participant or party to use E-Filing if the presiding officer subsequently determines that the reason for granting the exemption from use of E-Filing no longer exists.
Documents submitted in adjudicatory proceedings will appear in the NRC's electronic hearing docket which is available to the public at http://ehd1 .nrc.qov/ehd/, unless excluded pursuant to an order of the Commission, or the presiding officer. Participants are requested not to include personal privacy information, such as social security numbers, home addresses, or home phone numbers in their filings, unless an NRC regulation or other law requires submission of such information. However, in some instances, a request to intervene will require including information on local residence in order to demonstrate a proximity assertion of interest in the 11
proceeding. With respect to copyrighted works, except for limited excerpts that serve the purpose of the adjudicatory filings and would constitute a Fair Use application, participants are requested not to include copyrighted materials in their submission.
The Commission will issue a notice or order granting or denying a hearing request or intervention petition, designating the issues for any hearing that will be held and designating the Presiding Officer. A notice granting a hearing will be published in the Federal Register and served on the parties to the hearing.
For further details with respect to this application, see the application dated June 30, 2015.
Order Imposing Procedures for Access to Sensitive Unclassified Non-Safeguards Information for Contention Preparation.
A. This Order contains instructions regarding how potential parties to this proceeding may request access to documents containing SUNSI.
B. Within 10 days after publication of this notice of hearing and opportunity to petition for leave to intervene, any potential party who believes access to SUNSI is necessary to respond to this notice may request such access. A "potential party" is any person who intends to participate as a party by demonstrating standing and filing an admissible contention under 10 CFR 2.309. Requests for access to SUNSI submitted later than 1O days after publication of this notice will not be considered absent a showing of good cause for the late filing, addressing why the request could not have been filed earlier.
C. The requester shall submit a letter requesting permission to access SUNSI to the Office of the Secretary, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, Attention: Rulemakings and Adjudications Staff, and provide a copy to the Associate General 12
Counsel for Hearings, Enforcement and Administration, Office of the General Counsel, Washington, DC 20555-0001. The expedited delivery or courier mail address for both offices is:
U.S. Nuclear Regulatory Commission, 11555 Rockville Pike, Rockville, Maryland 20852. The e-mail address for the Office of the Secretary and the Office of the General Counsel are Hearinq.Docket@nrc.gov and OGCmailcenter@nrc.gov, respectively. 1 The request must include the following information:
(1) A description of the licensing action with a citation to this Federal Register notice; (2) The name and address of the potential party and a description of the potential party's particularized interest that could be harmed by the action identified in C.(1 ); and (3) The identity of the individual or entity requesting access to SUNS! and the requester's basis for the need for the information in order to meaningfully participate in this adjudicatory proceeding. In particular, the request must explain why publicly-available versions of the information requested would not be sufficient to provide the basis and specificity for a proffered contention.
D. Based on an evaluation of the information submitted under paragraph C.(3) the NRG staff will determine within 10 days of receipt of the request whether:
(1) There is a reasonable basis to believe the petitioner is likely to establish standing to participate in this NRG proceeding; and (2) The requester has established a legitimate need for access to SUNS!.
E. If the NRG staff determines that the requester satisfies both D.(1) and D.(2) above, the NRG staff will notify the requester in writing that access to SUNS! has been granted.
The written notification will contain instructions on how the requester may obtain copies of the requested documents, and any other conditions that may apply to access to those documents.
1 While a request for hearing or petition to intervene in this proceeding must comply with the filing requirements of the NRC's "E-Filing Rule," the initial request to access SUNSI under these procedures should be submitted as described in this paragraph.
13
These conditions may include, but are not limited to, the signing of a Non-Disclosure Agreement or Affidavit, or Protective Order2 setting forth terms and conditions to prevent the unauthorized or inadvertent disclosure of SUNSI by each individual who will be granted access to SUNSI.
F. Filing of Contentions. Any contentions in these proceedings that are based upon the information received as a result of the request made for SUNSI must be filed by the requester no later than 25 days after the requester is granted access to that information.
However, if more than 25 days remain between the date the petitioner is granted access to the information and the deadline for filing all other contentions (as established in the notice of hearing or opportunity for hearing), the petitioner may file its SUNSI contentions by that later deadline. This provision does not extend the time for filing a request for a hearing and petition to intervene, which must comply with the requirements of 10 CFR 2.309.
G. Review of Denials of Access.
(1) If the request for access to SUNSI is denied by the NRG staff after a determination on standing and need for access, the NRG staff shall immediately notify the requestor in writing, briefly stating the reason or reasons for the denial.
(2) The requester may challenge the NRG staff's adverse determination by filing a challenge within 5 days of receipt of that determination with: (a) the presiding officer designated in this proceeding; (b) if no presiding officer has been appointed, the Chief Administrative Judge, or if he or she is unavailable, another administrative judge, or an administrative law judge with jurisdiction pursuant to 10CFR2.31 S{a); or (c) officer if that officer has been designated to rule on information access issues.
H. Review of Grants of Access. A party other than the requester may challenge an NRG staff determination granting access to SUNSI whose release would harm that party's 2 Any motion for Protective Order or draft Non-Disclosure Affidavit or Agreement for SUNS! must be filed with the presiding officer or the Chief Administrative Judge if the presiding officer has not yet been designated, within 30 days of the deadline for the receipt of the written access request.
14
interest independent of the proceeding. Such a challenge must be filed with the Chief Administrative Judge within 5 days of the notification by the NRG staff of its grant of access.
If challenges to the NRG staff determinations are filed, these procedures give way to the normal process for litigating disputes concerning access to information. The availability of interlocutory review by the Commission of orders ruling on such NRG staff determinations (whether granting or denying access) is governed by 10 CFR 2.311. 3 3 Requesters should note that the filing requirements of the NRC's E-Filing Rule (72 FR 49139; August 28, 2007) apply to appeals of NRC staff determinations (because they must be served on a presiding officer or the Commission, as applicable), but not to the initial SUNSI request submitted to the NRC staff under these procedures.
15
I. The Commission expects that the NRC staff and presiding officers (and any other reviewing officers) will consider and resolve requests for access to SUNSI, and motions for protective orders, in a timely fashion in order to minimize any unnecessary delays in identifying those petitioners who have standing and who have propounded contentions meeting the specificity and basis requirements in 10 CFR Part 2. Attachment 1 to this Order summarizes the general target schedule for processing and resolving requests under these procedures.
Dated at Rockville, Maryland, this_ day of [MONTH] [YEAR].
For the Nuclear Regulatory Commission.
Annette L. Vietti-Cook, Secretary of the Commission.