Notice of Meeting with Firstenergy Nuclear Operating Company to Discuss Nrc'S Assessment of Safety Performance at Beaver Valley Power Station, Units 1 & 2 for Calendar Year 2009, as Described in Annual Assessment Letter Dated 03/03/2010
ML100960041
Person / Time
Site: Beaver Valley  FirstEnergy icon.png
Issue date: 04/06/2010
From: Bellamy R
NRC/RGN-I/DRP/PB6
To:
BELLAMY, RR
References
10-015
Download: ML100960041 (3)


Text

No.10-015 U.S. NUCLEAR REGULATORY COMMISSION REGION I NOTICE OF LICENSEE MEETING April 6, 2010 Licensee!: FirstEnergy Nuclear Operating Company (FENOC)

Facility: Beaver Valley Power Station, Units 1 & 2 Docket No. 50-334 and 50-412 Date and Time: May 4,2010 from 6:00 p.m. to 7:30 p.m.

Location: Shippingport Community and Municipal Building 164 State Road 3016 Shippingport, PA. 15077

Purpose:

The NRC will provide an open house meeting with the public to discuss the NRC's assessment of the safety performance at the Beaver Valley Power Station, Units 1 & 2 for calendar year 2009, as described in the Annual Assessment Letter dated March 3,2010. The NRC will also be available to engage interested stakeholders on specific performance issues at the plant and our role in ensuring safe plant operations.

NRC Attendees: R. Bellamy, Chief, Projects Branch 6, Region I D. Werkheiser, Senior Resident Inspector, Beaver Valley E. Bonney, Resident Inspector, Beaver Valley N. Morgan, Project Manager, Nuclear Reactor Regulation Public Participation: This is a Category 3 Meeting. The public is invited to this open house and will have opportunities to interact with NRC personnel regarding our assessment of the safety performance of the Beaver Valley Power Station, Units 1 & 2 for the previous year.

Meeting

Contact:

Rona[d R. Bellamy, Ph.D., Chief, Projects Branch 6 610-337-5200 E-mail: ronald.bellamy@nrc.gov.

The NRC's Annual Assessment Letter for Beaver Valley Power Station, Units 1 & 2 can be located in ADAMS with Accession Number ML100621324. ADAMS is accessible from the NRC Web Site at http://www.nrc.gov/reading-rmfadams.html.

Additional information relative to the NRC's Annual Assessment process and the safety performance of the Beaver Valley Units 1 & 2 can be found on the NRC's web site at:

http://www.nrc.gov/NRRlOVERSIGHT/ASSESS/index.html.

2 The NRC's Policy Statement, "Enhancing Public Participation in NRC Meetings," effective May 28. 2002, applies to this meeting. The policy statement may be found on the NRC Web site, http://wwW.nrc.govlreading-rm/doc-collections/commission/policy/67fr36920.htmland contains information regarding visitors and security.

Meeting

Contact:

Ronald R Bellamy, Ph.D., Chief, Projects Branch 6 610-337-5200 E-mail: ronald.bellamy@nrc.gov.

  • Handicapped persons requiring assistance to attend the meeting shall make their requests known to the NRC meeting contact no later than two business days prior to the meeting, to provide the NRC staff adequate notice to determine whether the request can be accommodated. Attendance by NRC personnel at this meeting should be made known by April 30, 2010, via telephone to the NRC meeting contact.

APprOVedby:~*\L. ~ANV\.

Ronald R. Bellamy, Ph.~~* ~

Projects Branch 6 Division of Reactor Projects cc: Distribution via LislServ

3 The NRC's Policy Statement, "Enhancing Public Participation in NRC Meetings," effective May 28, 2002, applies to this meeting. The policy statement may be found on the NRC Web site, http://www.nrc.gov/reading-rm/doc-coliections/commission/polici:/67fr36920.htmland contains information regarding visitors and security.

Meeting

Contact:

Ronald R. Bellamy, Ph.D., Chief, Projects Branch 6 610-337 -5200 E-mail: ronald.bellamy@nrc.gov.

  • Handicapped persons requiring assistance to attend the meeting shall make their requests known to the NRC meeting contact no later than two business days prior to the meeting, to provide the NRC staff adequate notice to determine whether the request can be accommodated. Attendance by NRC personnel at this meeting should be made known by April 30, 2010, via telephone to the NRC meeting contact.

Approved by: ~_-:..:/Rc..:;AI==- _ _~ _ _~

Ronald R. Bellamy, Ph.D., Chief Projects Branch 6 Division of Reactor Projects Distribution: (Via E-Mail):

Executive Director for Operations, OEDO (RIDSEDOMAILCENTER)

Deputy Executive Director for Reactor Programs. OEDO (RIOSEDOMAILCENTER)

Director, Office of Nuclear Reactor RegUlation. NRR (RIOSNRROO)

Deputy Director, Office of Nuclear Reactor Regulation, NRR (RIOSNRROD)

Director, Division of Inspection and Regional Support, NRRJDIRS (RIDSNRROIRS)

Director, Division of Operating Reactor Licensing. NRRJDORL (RIOSNRROORL)

Project Directorate 1-1 (PD1-2). NRR (RIDSNRRDORILpI1-2)

Asst. General Counsel Materials Litigation and Enforcement, OGC (RIDSOGCMAILCENTER)

S. Collins, RA J. Greives, ORP D. Tifft, SLO M. Oapas, ORA L. Trocine, RI OEDO J. Thompson, NRR O. Lew, DRIP O. Werkheiser, DRP, SRI G. Matakas, ORA J. Clifford, DRP E. Bonney, DRP, RI K. Heater, DRP D. Roberts. DRS P. Garrett, DRP, OA D. Bearde, DRS P. WRson, C'RS D. Serenci, PAO V. Lewis, RI Receptionist R. Bellamy, DRP N. Sheehan, PAO ROPreporlsResource@nre.gov S. Barber, DRP R. Barkley, ORA RidsNrrPMBeaveNalleyResource.gv C. Newport, ORP N, McNamara, SLO SUNSI R.EVIEW COMPLETE: ........,:.R..:..:R..:..:B=--_ _ (Reviewer's Initials) ML100960041 DOC NAME:G:\DRP\8RANCH6\ROP ASSESSMENT FOLDERS\ROP 10\BEAVERVALLEy\END-OF*CYCLE\

BV AA OPENHOUSE MTG NOTICE ROP 10.DOC .

After declaring this document "An Official Agency Record" it will be released to the Public.

To receive acopy of this document, Indicate in the box: 'C" = Copy without attachment/enclosure 'E' =Copy with attachment/enclosure 'N'::: No copy OFFICE: RI/DRP IIDRP NAME: SBarber I SB Bellamy I RRB DATE: 03/24110 04/06/10 OFFICIAL RECORD COPY