Category:Letter
MONTHYEARNMP1L3570, Supplemental Information Letter - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation2024-02-0101 February 2024 Supplemental Information Letter - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation IR 05000220/20230042024-02-0101 February 2024 Integrated Inspection Report 05000220/2023004 and 05000410/2023004 NMP1L3569, CFR 50.46 Annual Report2024-01-26026 January 2024 CFR 50.46 Annual Report ML24004A2122024-01-0808 January 2024 Senior Reactor and Reactor Operator Initial License Examinations ML23354A0012024-01-0404 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0059 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML23278A1292023-12-14014 December 2023 Units 1 & 2; Limerick, Units 1 & 2; Nine Mile Point, Units 1 & 2; and Peach Bottom, Units 2 & 3 -Revision to Approved Alternatives to Use Boiling Water Reactor Vessel and Internals Project Guidelines NMP1L3566, Radiological Emergency Plan Document Revision. Includes EP-AA-1013, Revision 10, Radiological Emergency Plan Annex for Nine Mile Point Station2023-12-14014 December 2023 Radiological Emergency Plan Document Revision. Includes EP-AA-1013, Revision 10, Radiological Emergency Plan Annex for Nine Mile Point Station IR 05000410/20243012023-12-14014 December 2023 Initial Operator Licensing Examination Report 05000410/2024301 ML23305A1402023-12-13013 December 2023 Units 1 & 2; Nine Mile Point, Unit 2; Peach Bottom, Units 2 & 3; and Quad Cities, Units 1 and 2 - Issuance of Amendments to Adopt Traveler TSTF-580 NMP1L3564, Supplemental Response to Part 73 Exemption Request - Withdrawal of Request for Exemption from 10 CFR 73, Subpart B, Preemption Authority Requirements2023-12-0707 December 2023 Supplemental Response to Part 73 Exemption Request - Withdrawal of Request for Exemption from 10 CFR 73, Subpart B, Preemption Authority Requirements ML23291A4642023-12-0707 December 2023 Issuance of Amendment No. 251 Regarding the Adoption of Title 10 the Code of Federal Regulations Section 50.69, Risk-Informed Categorization and Treatment of SSC for Nuclear Power Plants ML23289A0122023-12-0606 December 2023 Issuance of Amendment No. 250 Regarding the Revision to Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b NMP1L3563, Submittal of Relief Request I5R-12, Revision 0, Concerning the Installation of a Full Structural Weld Overlay on Reactor Pressure Vessel Recirculation Inlet Nozzle N2E Safe End-to-Nozzle Dissimilar Metal Weld (32-WD-208)2023-12-0404 December 2023 Submittal of Relief Request I5R-12, Revision 0, Concerning the Installation of a Full Structural Weld Overlay on Reactor Pressure Vessel Recirculation Inlet Nozzle N2E Safe End-to-Nozzle Dissimilar Metal Weld (32-WD-208) IR 05000220/20234022023-11-28028 November 2023 Security Baseline Inspection Report 05000220/2023402 and 05000410/2023402 NMP1L3557, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-11-22022 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23317A1192023-11-10010 November 2023 Constellation Energy Generation, LLC - 2023 Annual Report - Guarantees of Payment of Deferred Premiums IR 05000220/20234202023-11-0101 November 2023 Security Baseline Inspection Report 05000220/2023420 and 05000410/2023420 ML23305A0052023-11-0101 November 2023 Operator Licensing Examination Approval IR 05000220/20230032023-10-25025 October 2023 Integrated Inspection Report 05000220/2023003 and 05000410/2023003 IR 05000220/20235012023-10-17017 October 2023 Emergency Preparedness Biennial Exercise Inspection Report 05000220/2023501 and 05000410/2023501 IR 05000220/20230112023-10-16016 October 2023 Comprehensive Engineering Team Inspection Report 05000220/2023011 and 05000410/2023011 RS-23-097, Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans2023-10-12012 October 2023 Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans NMP1L3554, Submittal of Revision 28 to the Final Safety Analysis Report (Updated), Fire Protection Design Criteria Document, 10CFR50.59 Evaluation Summary Report, 10CFR54.37(b) Aging Management Review, and Technical Specifications with Revised Bases2023-10-0606 October 2023 Submittal of Revision 28 to the Final Safety Analysis Report (Updated), Fire Protection Design Criteria Document, 10CFR50.59 Evaluation Summary Report, 10CFR54.37(b) Aging Management Review, and Technical Specifications with Revised Bases C IR 05000220/20233032023-09-20020 September 2023 Retake Operator Licensing Examination Report 05000220/2023303 ML23250A0822023-09-19019 September 2023 Regulatory Audit Summary Regarding LARs to Adopt TSTF-505, Rev. 2, and 10 CFR 50.69 ML23257A1732023-09-14014 September 2023 Requalification Program Inspection IR 05000220/20230052023-08-31031 August 2023 Updated Inspection Plan for Nine Mile Point Nuclear Station, Units 1 and 2 (Report 05000220/2023005 and 05000410/2023005) RS-23-080, Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs2023-08-30030 August 2023 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs NMP2L2851, Relief Request Associated with Successive Inspections for Generic Letter 88-01 / BWRVIP-75-A Augmented Examinations2023-08-25025 August 2023 Relief Request Associated with Successive Inspections for Generic Letter 88-01 / BWRVIP-75-A Augmented Examinations ML23151A3472023-08-21021 August 2023 Issuance of Amendments to Adopt TSTF-295-A, Modify Note 2 to Actions of PAM Table to Allow Separate Condition Entry for Each Penetration NMP1L3534, License Amendment Request - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation2023-08-18018 August 2023 License Amendment Request - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation ML23220A0262023-08-0808 August 2023 Licensed Operator Positive Fitness-for-Duty Test IR 05000220/20234012023-08-0808 August 2023 Cyber Security Inspection Report 05000220/2023401 and 05000410/2023401 (Cover Letter Only) NMP1L3545, Supplemental Information Letter to Adopt TSTF-505, Provide Risk- Informed Extended Completion Times - RITSTF Initiative 4b, Revision 2 and 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems .2023-08-0404 August 2023 Supplemental Information Letter to Adopt TSTF-505, Provide Risk- Informed Extended Completion Times - RITSTF Initiative 4b, Revision 2 and 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems . RS-23-087, Revision to Approved Alternatives Associated with the Use of the BWRVIP Guidelines in Lieu of Specific ASME Code Requirements on Reactor2023-08-0404 August 2023 Revision to Approved Alternatives Associated with the Use of the BWRVIP Guidelines in Lieu of Specific ASME Code Requirements on Reactor IR 05000220/20230022023-08-0101 August 2023 Integrated Inspection Report 05000220/2023002 and 05000410/2023002 ML23207A0762023-07-14014 July 2023 EN 56557 - Update to Part 21 Report Re Potential Defect with Trane External Auto/Stop Emergency Stop Relay Card Pn: XI2650728-06 NMP1L3544, Fifth Inservice Inspection Interval, First Inservice Inspection Period 2023 Owner'S Activity Report for RFO-27 Inservice Examinations2023-07-14014 July 2023 Fifth Inservice Inspection Interval, First Inservice Inspection Period 2023 Owner'S Activity Report for RFO-27 Inservice Examinations ML23186A1642023-07-0606 July 2023 Operator Licensing Retake Examination Approval NMP2L2846, Nine Mire Point Nuclear Station, Units 1 and 2, General License 30-day Cask Registration Notifications2023-07-0505 July 2023 Nine Mire Point Nuclear Station, Units 1 and 2, General License 30-day Cask Registration Notifications ML23192A0622023-06-30030 June 2023 Engine Systems, Inc., 10CFR21 Reporting of Defects and Non-Compliance, Report No. 10CFR21-0136, Rev. 0 IR 05000220/20230102023-06-29029 June 2023 Biennial Problem Identification and Resolution Inspection Report 05000220/2023010 and 05000410/2023010 ML23131A4242023-06-23023 June 2023 Issuance of Amendment No. 249 Regarding the Revision to Technical Specification 3.3.1 to Adopt Technical Specifications Task Force Traveler TSTF-568 RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations NMP1L3539, Day Commitment Response - Relief Request I5R-11 Concerning the Installation of a Weld Overlay on Reactor Pressure Vessel Recirculation Inlet Nozzle N2E Safe End-to-Nozzle Dissimilar Metal Weld (32-WD-208)2023-06-0909 June 2023 Day Commitment Response - Relief Request I5R-11 Concerning the Installation of a Weld Overlay on Reactor Pressure Vessel Recirculation Inlet Nozzle N2E Safe End-to-Nozzle Dissimilar Metal Weld (32-WD-208) ML23159A0052023-06-0505 June 2023 56557-EN 56557 - Paragon - Redlined RS-23-042, Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling2023-05-25025 May 2023 Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling IR 05000410/20233022023-05-15015 May 2023 Initial Operator Licensing Examination Report 05000410/2023302 2024-02-01
[Table view] Category:License-Operator Examination Report
MONTHYEARIR 05000410/20243012023-12-14014 December 2023 Initial Operator Licensing Examination Report 05000410/2024301 IR 05000220/20233032023-09-20020 September 2023 Retake Operator Licensing Examination Report 05000220/2023303 IR 05000220/20203012021-01-25025 January 2021 Initial Operator Licensing Examination Report 05000220/2020301 IR 05000410/20193012020-02-11011 February 2020 Initial Operator Licensing Examination Report 05000410/2019301 IR 05000220/20183012019-02-21021 February 2019 Initial Operator Licensing Examination Report 05000220/2018301 IR 05000410/20173022018-02-12012 February 2018 Initial Operator Licensing Examination Report 05000410/2017302 IR 05000220/20173012017-04-13013 April 2017 NRC Initial Operator Licensing Examination Report 05000220/2017301 IR 05000410/20153022016-01-27027 January 2016 Er 05000410/2015302; 11-30-12/22/2015; Nine Mile Point Unit 2 Initial Operator Licensing Examination Report IR 05000220/20153012015-05-0606 May 2015 Er 05000220/2015301; March 2- to 10, 2015, and March 12, 2015; Nine Mile Point Nuclear Station, Unit 1; Initial Operator Licensing Examination Report ML15057A0142015-02-25025 February 2015 Initial Operator Licensing Operating Test and Written Examination Approval, Nine Mile Point, Unit 1 RS-14-164, (EGC) Response to NRC Regulatory Issue Summary 2014-05, Preparation and Scheduling of Operator Licensing Examinations2014-05-29029 May 2014 (EGC) Response to NRC Regulatory Issue Summary 2014-05, Preparation and Scheduling of Operator Licensing Examinations IR 05000410/20143012014-05-0505 May 2014 Er 05000410/2014301; March 3 10, 2014; Nine Mile Point Nuclear Station, Unit 2; Initial Operator Licensing Examination Report ML13200A0062013-07-15015 July 2013 Response to NRC Regulatory Issue Summary 2013-06 IR 05000410/20123012012-04-23023 April 2012 Er 05000410-12-301, on March 19-26, 2012, Nine Mile Point Unit 2, Initial Operator Licensing Examination Report IR 05000410/20103022011-01-18018 January 2011 Er 05000410-10-302, on 11/15/10 - 11/22/10, Nine Mile Point, Unit 2, Initial Operator Licensing Examination Report IR 05000220/20093012009-10-24024 October 2009 Er 05000220-09-301 on 09/08/09 for Nine Mile Point Unit 1 ML0931404432009-10-24024 October 2009 Er 05000220-09-303; 08/31/2009 - 09/08/2009; Nine Mile Point Nuclear Station Unit 1; Initial Operator Licensing Examination Report (Corrected Report) ML0909801382009-04-0808 April 2009 Er 05000220-09-301; March 3, 2009; Nine Mile Point Nuclear Generating Station Unit 1, Operator Licensing Retake Examination Report IR 05000220/20083022008-11-26026 November 2008 Er 05000220-08-302, on October 6-23, 2008, Nine Mile Point Nuclear Station, Unit 1; Initial Operator Licensing Examination Report IR 05000410/20083032008-11-10010 November 2008 Er 05000410-08-303; on October 6-10, 2008; Nine Mile Point Nuclear Generating Station Unit 2, Operator Licensing Retake Examination Report IR 05000410/20083012008-04-23023 April 2008 Er 05000410-08-301, Exam Dates 3/10 - 3/17/2008, Nine Mile Point Nuclear Station, Unit 2, Initial Operator Licensing Examination IR 05000220/20073012007-04-19019 April 2007 IR 05000220-07-301, on 03/12-16/2007; Nine Mile Point Unit 1; Initial Operator Licensing Examination IR 05000220/20053012005-02-0303 February 2005 IR 05000220-05-301 on November 1-18, 2004 for Nine Mile Point Unit 1; Initial Operator Licensing Examination. Seven of Nine Applicants Passed the Examination (Three Reactor Operators, Four SRO Instants) 2023-09-20
[Table view] |
Text
,ffi UNITED STATES NUCLEAR REGULATORY COMMISSION
REGION I
475 ALLENDALE ROAD KING OF PRUSSIA, PENNSYLVANIA 19406-1415 April 23, 20L2 Mr. Kenneth Langdon, Site Vice President Nine Mile Point Nuclear Station, LLC P.O. Box 63 Lycoming, NY 13093-0063 SUBJECT: NINE MILE POINT UNIT 2 - NRC lNlTlAL OPERATOR LICENSING EXAM I NATI ON REPORT 050004 1 0 12012301
Dear Mr. Langdon:
On March 26,2012, the U.S. Nuclear Regulatory Commission (NRC) completed an examination at Nine Mile Point Unit 2. The enclosed report documents the examination findings, which were discussed on in a telephone exit meeting on April 19,2012, with Mr. Aaron Armstrong, Acting General Supervisor Operations Training, and other members of your staff.
The examination included the evaluation of three applicants for reactor operator licenses and eight applicants for instant senior operator licenses. The written and operating examinations were developed using NUREG-1021, "Operator Licensing Examination Standards for Power Reactors," Revision 9, Supplement 1. The license examiners determined all of the eleven applicants satisfied the requirements of 10 CFR Part 55, and the appropriate licenses were issued on April 19,2012. Three licenses were held pending completion of deferred eligibility requirements.
ln accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams/web-based.html (the Public Electronic Reading Room).
Donald E. J Operations Branch Division of Reactor Safety
Mr. Kenneth Langdon, Site Vice President Nine Mile Point Nuclear Station, LLC P.O. Box 63 Lycoming, NY 13093-0063 SUBJECT: NINE MILE POINT UNIT 2 - NRC lNlTlAL OPERATOR LICENSING EXAM I NATION REPORT 050004 1 0 I 201 2301
Dear Mr. Langdon:
On March 26,2012, the U.S. Nuclear Regulatory Commission (NRC) completed an examination at Nine Mile Point Unit 2. The enclosed report documents the examination findings, which were discussed on in a telephone exit meeting on April 19,2012, with Mr. Aaron Armstrong, Acting General Supervisor Operations Training, and other members of your staff.
The examination included the evaluation of three applicants for reactor operator licenses and eight applicants for instant senior operator licenses. The written and operating examinations were developed using NUREG-1021, "Operator Licensing Examination Standards for Power Reactors," Revision 9, Supplement 1. The license examiners determined all of the eleven applicants satisfied the requirements of 10 CFR Part 55, and the appropriate licenses were issued on April 19,2012. Three licenses were held pending completion of deferred eligibility requirements.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system Agencyrrvide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams/web-based.html (the Public Electronic Reading Room).
Sincerely,
/RN Donald E. Jackson, Chief Operations Branch Division of Reactor Safety DOCUMENT NAME: GlDRS\Operations Branch\DANTONIO\Exam 12-NMP2Mar 12 (U01841)\NMP2 EXAM REPORT.docx ADAMS PKG: Ml110030686 ADAMS ACCESSION NUMBER: ML12115A002 g V Non-sensitive g Publicly Available suNslReview
! Sensitive n Non-Publicly Available OFFICE RI/DRS RI/DRS NAME JDAntonio DJackson DATE 4t23t12 4123112 RECORD COPY
Enclosure:
NRC lnitial Operator Licensing Examination Report 0500041012012301 w/Attachment: Supplemental Information
REGION I==
Dockets: 50-410 Licenses: NPF-69 Report : 0500041012012301 Licensee: Constellation Energy Group, LLC Facility: Nine Mile Point Unit 2 Location: P.O. Box 63 Lycoming, NY 13093-0063 Dates: March 17-23,2}12(Operating Test Administration)
March 26, 2012(Written Examination Administration)
March 30,2012 (Licensee Submitted Post Exam Package)
March 26 - April 12 (NRC Examination Grading)
April 19, 2012 (Licenses lssued)
Examiners: Joseph M. D'Antonio, Senior Operations Engineer Joyce Tomlinson, Operations Engineer Brian Fuller, Operations Engineer Richard DeVercelly, Reactor Technology Instructor Approved By: Donald E. Jackson, Jr., Chief Operations Branch Division of Reactor Safety Enclosure
SUMMARY OF FINDINGS
ER 0500041012012301; March 19-26,2012; Nine Mile Point Unit 2; Initial Operator Licensing
Examination Report.
NRC examiners evaluated the competency of three applicants for reactor operator licenses, and eight applicants for instant senior operator licenses at Nine Mile Point Unit 2. The facility licensee developed the examinations using NUREG-1021, "Operator Licensing Examination Standards for Power Reactors," Revision 9, Supplement 1. The written examination was administered by the facility on March 26,2012. NRC examiners administered the operating tests on March 19-23,2012. The license examiners determined that all of the eleven applicants satisfied the requirements of 10 CFR Part 55, and the appropriate licenses have been issued.
REPORT DETAILS
4. OTHER ACTTVTTTES (OA)
4OA5 Other Activities (lnitial Operator License Examination)
.1 License Applications
a. Examination Scope
The examiners reviewed all eleven license applications submitted by the licensee to ensure the applications reflected that each applicant satisfied relevant license eligibility requirements. The applications were submitted on NRC Form 398, "Personal Qualification Statement," and NRC Form 396, "Certification of Medical Examination by Facility Licensee." The examiners also audited all of the license applications in detail to confirm that they accurately reflected the subject applicant's qualifications. This audit focused on the applicant's experience and on{he-job training, including control manipulations that provided significant reactivity changes.
b. Findinqs No findings were identified.
.2 Operator Knowledge and Performance
a. Examination Scope
On March 26,2012, the licensee proctored the administration of the written examinations to all eleven applicants. The licensee staff graded the written examinations, analyzed the results, and presented their analysis to the NRC on March 30,2012.
The NRC examination team administered the various portions of the operating examination to all eleven applicants on Month 19-23,2012. The three applicants for reactor operator licenses participated in three dynamic simulator scenarios, in a control room and facilities walkthrough test consisting of eleven system tasks, and an administrative test consisting of four administrative tasks. The eight applicants seeking an instant senior operator license participated in two or three dynamic simulator scenarios, a control room and facilities walkthrough test consisting of ten system tasks, and an administrative test consisting of five administrative tasks.
b. Findinqs All eleven of the applicants passed all parts of the examination. For the written examinations, the reactor operator applicants' average score was 85.77 percent and ranged from 81.33 to 88 percent, the senior operator applicants' average score was 89.25 percent and ranged from 82 to 97 percent. The overall written examination average was 88,30 percent. The text of the examination questions, the licensee's examination analysis, and the licensee's post-examination comments may be accessed in the ADAMS system under the accession numbers noted in Attachment 1. In accordance with current NRC policy, the release of this written examination in ADAMS to the public will be delayed for two years.
The NRC examiners completed the final grading of the written examination on April 3, 2012, and conducted a review of each missed question to determine the accuracy and validity of the examination questions. In accordance with current NRC policy, the release of this written examination will be delayed for two years, The text of the examination questions, the licensee's examination analysis, and the licensee's post-examination comments may be accessed in the ADAMS system under the accession numbers noted in the attachment.
Chapter ES-403 and Form ES-403-1 of NUREG 1021 require the licensee to analyze the validity of any written examination questions that were missed by half or more of the applicants. The licensee conducted this performance analysis and submitted the analysis to the chief examiner.
.3 Initial Licensinq Examination Development
a. Examination Scope
The facility licensee developed the examinations in accordance with NUREG-1021 ,
Revision 9, Supplement 1, All licensee facility training and operations staff involved in examination preparation and validation were listed on a security agreement. The facility licensee submitted both the written and operating examination outlines on August 19, 2011. The chief examiner reviewed the outlines against the requirements of NUREG-1021 , and provided comments to the licensee. The facility licensee submitted the draft examination package on November 3, 2011. The chief examiner reviewed the draft examination package against the requirements of NUREG-1021, and provided final comments to the licensee on the examination on January 25,2012. The NRC conducted an onsite validation of the operating examinations and provided further comments during the week of February 20,2012. The licensee satisfactorily completed comment resolution on March 19, 2011.
b. Findinqs The NRC approved the initial examination outline and advised the licensee to proceed with the operating examination development.
The examiners determined that the written and operating examinations initially submitted by the licensee were within the range of acceptability expected for a proposed examination.
No findings were identified.
.4 Simulation Facilitv Performance
a. Examination Scope
The examiners observed simulator performance with regard to plant fidelity during the examination validation and administration.
b. Findinqs No findings were identified.
.5 Examination Securitv
a. Examination Scope
The examiners reviewed examination security for examination development and during both the onsite preparation week and examination administration week for compliance with NUREG-1021requirements. Plans for simulator security and applicant control were reviewed and discussed with licensee personnel, b. Findinqs No findings were identified.
4OAO Meetinqs. Includinq Exit The chief examiner presented observations concerning the examination to Mr. Julian Thompson, NMP2 General Supervisor of Shift Operations, and other members of the licensee's staff during an outbrief meeting on March 23,2012. Final examination results were provided to Mr. Aaron Armstrong, Acting General Supervisor Operations Training and other members of the licensee's management staff on April 19,2012. The licensee acknowledged the observations and presented.
The licensee did not identify any information or materials used during the examination as proprietary.
ATTACHMENTS:
SUPPLEMENTAL INFORMATION
KEY POINTS OF CONTACT
Licensee Personnel
Julian Thompson, NMP2 General Supervisor of Shift Operations
Greg Pitts, Acting General Supervisor Operations Training
Aaron Armstrong, Acting General Supervisor Operations Training
David Britt, NMP2 InitialTraining Supervisor
David Huff, Lead Exam Developer
NRC Personnel
Joseph
- M. D'Antonio, Senior operations Engineer
Richard DeVercelly, Senior Reactor Technology Instructor
ITEMS OPENED, CLOSED, AND DISCUSSED
Opened
NONE
Opened and Closed
NONE
Closed
NONE
Discussed
NONE
ADAMS DOCUMENTS REFERENCED