Senior Reactor and Reactor Operator Initial License Examinations - Nine Mile Point Unit 2
ML111820284
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 06/30/2011
From: Hansell S
Operations Branch I
To: Belcher S
Nine Mile Point 3 Nuclear Project
Shared Package
ML110030686 List:
References
Download: ML111820284 (4)


Text

UNITED STATES NUCLEAR REGU LATORY COMMISSION REGION I 475 ALLENDALE ROAD KlNG OF PRUSSlA. PA 19406-1415 June 30, 2011 Mr. Sam Belcher Vice President Nine Mile Point Nuclear Station, LLC P.O. Box 63 Lycoming, NY 13093-0063

SUBJECT:

SENIOR REACTOR AND REACTOR OPERATOR lNlTlAL LICENSE EXAMINATIONS _ NINE MILE POINT UNIT 2

Dear Mr. Belcher:

ln a telephone conversation on June 28, 2011, between Mr. David Huff, Lead Exam Author, and Mr. Joseph D'Antonio, Senior Operations Engineer, arrangements were made for the administration of licensing examinations at Nine Mile Point Unit 2 during the week of November 7,2011.

As agreed during the telephone conversation, your staff will prepare the examinations based on the guidelines in NUREG-1021, "Operator Licensing Examination Standards for Power Realtors," Revision 9, Supplement 1. The NRC's regional office will discuss with your staff any changes that might be necessary before the examinations are administered.

To meet the above schedule, it will be necessary for your staff to furnish the examination outlines by August 22,2011. The written examinations, operating tests, and the supporting reference materials identified by Mr. D'Antonio will be due by September 19,2011. Pursuant to Title 1 0, Section 55.40(b) (3), of the Code of Federal Regulations ( 10 CFR 55.40(b) (3)), an authorized representative of the facility licensee shall approve the outlines, examinations, and tests before they are submitted to the NRC for review and approval. All materials should be complete and ready-to-use. We request that any personal, proprietary, sensitive unclassified, or safeguards information in your response be contained in a separate enclosure and marked appropriately. Any delay in receiving the required examination and reference materials, or the submittal of inadequate or incomplete materials, may cause the examinations to be rescheduled.

ln order to conduct the requested written examinations and operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402, and to make the simulation facility available on the dates noted above. In accordance with ES-302, your staff should retain the original simulator performance data (e.9., system pressures, temperatures, and levels) generated during the dynamic operating tests until the examination results are final. Appendix E of NUREG-1021contains a number of NRC policies and guidelines that will be in effect while the written examinations and operating tests are being administered.

S. Belcher 2

To permit timely NRC review and evaluation, your staff should submit preliminary reactor operator and senior reactor operator license applications (Office of Management and Budget (OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024),

and waiver requests (if any) (OMB approval number 3150-0090) at least 30 days before the first examination date. lf the applications are not received at least 30 days before the examination date, a postponement may be necessary. Signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date.

After you have been notified by the NRC Chief Examiner or Branch Chief that operator licenses have been issued, please direct any inquiries concerning a formal presentation of certificates to this office. Our goal is to have the operator certificates available for your celebration. At least one month advance notice of your celebration arrangements would be appreciated to plan our senior manager attendance and process the certificates.

This letter contains information collections that are subject to the Papenvork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). The OMB, under approval number 3150-0018, approved these information collections. The public reporting burden for this collection of information is estimated to average 500hours per response, including the time for reviewing instructions, gathering and maintaining the data needed, writing the examinations, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of these information collections, including suggestions for reducing the burden, to the Records and FOIA/Privacy Services Branch (T-5 F52), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by electronic mail to infocollects@nrc.qov; and to the Desk Officer, Office of Information and RegulatoryAffairs, NEOB-10202, (3150-0018),

Office of Management and Budget, Washington, DC 20503. The NRC may not conduct or sponsor, and a person is not required to respond to, an information collection, unless it displays a currently valid OMB control number.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosures will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the Electronic Reading Room page of the NRC's public Web site at http://www.nrc.qov/readinq-rm/adams/web-based. html.

S. Belcher 3

Thank you for your cooperation in this matter. Mr. Huff has been advised of the policies and guidelines referenced in this letter,. lf you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. Joseph D'Antonio at (610) 337-5085, or me at (610) 337-5046.

Sincerely, x

L--

Samuel L. Hansell, Jr., Chief U

Operations Branch Division of Reactor Safety Docket No.: 50-410 License No.: NPF-69 cc: Distribution via ListServ

S. Belcher 3

Thank you for your cooperation in this matter. Mr. Huff has been advised of the policies and guidelines referenced in this letter. lf you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. Joseph D'Antonio at (610) 337-5085, or me at (610) 337-5046.

Sincerely,

/RN Samuel L. Hansell, Jr., Chief Operations Branch Division of Reactor Safety Docket No.: 50-410 License No.: NPF-69 cc: Distribution via ListServ Distribution: (via e-mail)

W. Dean, RA (RIORAMAIL RESOURCE)

D. Lew, DRA (RIORAMAIL RESOURCE)

D. Roberts, DRP (RIDRPMAlL RESOURCE)

J. Clifford, DRP (RIDRPMAIL RESOURCE)

C. Miller, DRS (RIDRSMAIL RESOURCE)

P. Wilson, DRS (RIDRSMAIL RESOURCE)

J. McHale, RIOEDO G. Dentel, DRP N. Perry, DRP J. Hawkins, DRP K. Cronk. DRP N. Floyd, DRP K. Kolaczyk, DRP, SRI D. Dempsey, DRP, Rl K. Kolek, DRP, OA D. Bearde, DRS RidsNrrPMNineMilePointResource RidsNrrDorlLpl 1 -1 Resource S. Hansell, DRS J. D'Antonio, DRS DRS Master Exam File (C. Bixler) (w/concurrences)

SUNSI Review Complete: JMD (Reviewer's Initials)

ADAMS PKG: ML110030686 ADAMS Document No.: ML111820284 DOCUMENT NAME: GlDRS\\Operations Branch\\DANTONIO\\Exam 12-NMP2 Nov 11 (U01841)\\l2Odayexamltr.docx After this document "An Official

" it will be released to the Public.

)FFICE RI/DRS/OB RI/DRS/OB NAME JD'Antonio/JMD*

SHansell/SLH DATE 06128111 06t30t11

  • See Previous Concurrence OFFICIAL RECORD COPY