Insp Rept 50-293/93-01 on 930111-14.Weaknesses Noted.Major Areas Inspected:Eop Review,Rev,Approval Process,Qa Involvement in EOP Program & Operator Training in EOPs
ML20128G802
Person / Time
Site: Pilgrim
Issue date: 02/03/1993
From: Conte R, Sisco C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML20128G793 List:
References
50-293-93-01, 50-293-93-1, NUDOCS 9302160112
Download: ML20128G802 (8)


Text

_ _

.

i

.

.U.S. NUCLEAR REGULATORY COMMISSION REGION 1

. REPORT N DOCKET N LICENSE N DPR-35 LICENSEE: Boston Edison Company RFD #1 Rocky Hill Road Plymouth, Massachusetts 02360 FACILITY: Pilgrim Nuclear Power Station INSPECTION AT: Plymouth, Massachusetts INSPECTION DATES: January 11 - 14, 1993 ACCOMPANIED BY: A. Burritt, Operations Engineer

.

e <

LEAD OPERATOR: p - /

C. Spco,' Operations hngineer Date I APPROVED BY: *h 2 17 Richard J. Conte (Chief Date BWR Section, Operations Branch Division of Reactor Safety INSPECTION SUMMARY: Inspection conducted January 11 - 14.1992 (Inspect on i Report 50-293/93-01)

AREAS INSPECTED: A regional initiative safety inspection was conducted of the licensee's EOPs using Inspection Procedure 42001 to include an assessment of the technical adequacy of the EOPs; the EOP review, revision, and approval process;' the QA involvement in the EOP program; the operator training in EOPs. Further, plant housekeeping was assessed with particular focus on the back panels in the main control room.-

RESULTS: Based on this sampling review, the EOPs are generally technically accurate and are written and formatted in accordance with licensee's procedures. The case of use and review of the engineering calculations that support the EOPs is a strength of the licensee's EOP program. The licensee's controls to ensure significant plant problems are made known 9302160112 930205 "

{DR ADOCK 05000293 PDR

_ _ _ - _ _ _ _ _ _ _ _ _ _ - _ _ _ _ - _ _ - _ _ _ _ _ _ - _ __ _ _ _ - _ _ _ _ - _ _ - _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ - - _

T ji

!

to the operating staff in a timely manner were weak. The review, revision and approval process for EOP Support procedures was weak in that they are not reviewed and approved in the same manner as the EOPs. These weak areas were left unresolved (section 3).

The inspector determined that QA auditors routinely perform independent, indepth reviews of the EOP program. The lessons plans used to instruct plant operators in the use of the EOPs are well written and are consistent with the PSTG and EOPs. The EOPs are uscable by the operating crew and the crew understands how to perform the EOP The licensee took prompt corrective actions to improve housekeeping in the back panels of the main control roo ,

f DETAllS INTRODUCTION AND OVERVIEW This regional initiative safety inspection reviewed for adequacy the facility's emergency operating procedures (EOPs) and supporting development documentation, implementing procedures, and training. The requirements for the inspector and related guidance can be found in NRC Inspection Manual Procedure (IP 42001). This IP was developed as a result of special inspections conducted to verify completion of a TMI-2 Accident task action itern (TAP) No, l.C.1, " Guidance for the Evaluation and Development of Procedures for Transients and Accidents" (NUREG-0737 and Supplement 1). TECIINICAL ADEQUACY OF EOPS Scope The scope of the inspection was to determine that the EOPs are consistent with the NRC cndorsed accident mitigation strategies, in addition, the inspection was to determine if the licensee has procedural controls in place to maintain the technical basis, format, verification and validation of the EOP The inspector reviewed the licensee's current Plant Specific Technical Guidelines (PSTGs)

which are used to develop the EOP ndings The inspector determiced the PSTO to be complete, well documented, and generally technically accurate. The inspector reviewed selected enginecting calculations which are used as the bases of various setpoints within the EOPs. The inspector determined the engineering calculations to be consistent with the PSTO. The engineering calculations are contained within a single document which makes for case of use and review. The PSTO and supporting calculations are controlled by procedure 6.08, " Maintaining The Plant Specific Technical Guidelines For EOPs."

The inspector reviewed the EOPs and determined the procedures are consistent with the PSTG and engineering calculations except as described in section 3.0 of this report. The EOPs are controlled by procedures 1.3.413, "EOP Verincation Program," and 1.3.4-14,

"EOP Validation Program."

The inspector determined the EOPs are written and formatted in accordance with procedure 1.3.410 ' Writers Guide For Emergency Operating Procedures."

o y

u I 4

/

Conclusion Based on this sampling review, the EOPs are generally technically accurate and are written and formatted in accordance with licensee's procedures. The case of use and review of the engineering calculations that support the EOPs is a strength of the licensee's EOP progra .0 EOP REVIEW, REVISION AND APPROVAL PROCESS Scope The scope of the inspection was to determine whether significant changes to the licensee's EOPs impact plant operations and to verify that the licensee's administrative procedures adequately govern the review, revision, and approval process of the EOPs and support procedures.

l Findings The inspector reviewed a Quality Assurance department audit (Report No. 92-06) conducted in August 1992 that identified an error in the EOP support calculations. The error concerned the incorrect elevation of the High Pressure Coolant Injection (HPCI) system exhaust line inside the pressure suppression chamber. The calculation incorrectly determined the elevation of the HPCI system exhaust line inside the pressure suppression chamber to be 8 ft. The correct elevation is 92.5 ft. This error was evaluated by the Nuclear Engineering Department to be of little safety significance, but this basis was not documented by the licensee. The licensee also reviewed the supporting calculations and verified that no other i errors were evident. The licensee representatives concluded the cause of this error to have been a miscalculation made while using station drawing The licensee initiated a Procedure Change Notice to icvise the EOps to include the 92.5 ft, setpoint, which included a safety evaluation, a Plant Deficiency Report to revise the support i calculations, and scheduled the completion of the necetsary revisions by the end of refueling outage 9, scheduled for April 199 Based on a review of the licensee's safety evaluation, the inspector concluded that the change i did have some safety significance. Although the EOPs with the error would still assure containment integrity, containment pressures would unnecessarily increase to about 18 psig for some accident scenario '

The inspector further noted that the plant operating staff had not been made aware of this significant plant problem. When brought to the licensee's attention, the licensee's immediate corrective actions were to brief the on-shift operating staff of the problem, and issue a standing order to all plant operators requiring that the HPCI system be secured at a pressure suppression chamber water level of 95 ft. In addition, all ott'er EOP related pending

, , .

..

,

Procedure Change Notices and Deficiency Reports were reviewed by the licensec to verify that no other signincant problems remained. The licensee conducted a critique (No.93-013)

to review the events relating to the management of this significant problem. In addition, the licensee issued Problem Report No. 93.900 Based on a review of the process used to assess QA audit report findings, the inspector concluded that licensee's process of promptly notifying plant operating staff of significant plant problems was weak. Licensee representatives agreal to review this process. This area is an unresolved pending completion of lleensee action as noted abovs and subsequent NRC staff review (293/93-01-01).

The inspectw audited the review and revision process of the EOP support procedures. The inspector determined the review and revision process of EOP support procedures differs from that of the EOPs. The EOP support procedures are reviewed and revised as plant operating procedures. The EOPs are reviewed and revised in accordance with the EOP program requirements. A notable difference in these processes is the procedural field verification and validation that occurs for each of the EOP The EOP support procedures contain some of the accident mitigation strategies that are defined in the PSTG and the EOPs. Therefore, EOP support procedures should be clearly identified as EOPs and receive the same level of review and revision as the EOPs For example, the following deficiencies in EOP support procedures could have been identified by an EOP type validation and verification level of review and approva As one example of this problem, two EOP support procedures are not transitioned into from the EOPs. These procedures are:

  • Procedure 5.3.21, " Bypassing Selected Interlocks," Attachment 4. "IIPCI law RPV Pressure Isolation"
  • Procedure 5.3.26, "RPV Injection During Emergencies," Section 2.1, " Fire Water Crosstled to Feedwater."

Another example of this problem was found during the walkdown of EOP Support procedure 5.3.21, " Bypassing Selected Interlocks." The inspector determined that individual jumpers :

'

are not provided and labeled for each of the evolutions described in the procedure. In addition, the electrical jumpers that are provided are equipped with various sized alligator clips that are to be attached to pan head screws. This type of a an electrical connection may not provide a secure method to install a necessary electrical bypas [;

.c w*

~!he review, revision and approval process for EOP support procedures is not at the level as inat of the EOPs Licensee representatives agreed to review this area. This area is an i nresolved pending completion of licensee action as noted above and subsequent NRC staff review (293/93-01-02).

Conclusion The lleensce's controls to ensure significant plant problems are made known to the operating staff in a timely manner is weak. The review, revision and approval process for EOP Support procedures was weak in that they are not reviewed and approved in the same manner as the EOP , QUALITY ASSURANCE INVOLVfLMENT IN Tile EOP PROGRAM j Scolm .

The scope of the inspection was to verify that the licensec conducts independent quality- +

assurance (QA) audits of the EOP program. The inspector reviewed two QA audit reports ,

'

and conducted an interview with a Senior QA staff audito I Findings The QA audits that have been conducted were in depth reviews of the licensce's progra This was particularly evident as noted above by the calculation error identified in Audit No, i 92 80. In addition, future QA audits are scheduled as a routine QA activity. - From a review of these records and interviews, the inspector determined that the QA involvement in the i EOP program is a strength of the licensee's progra l Conclusion  ;

The inspector determined that QA auditors perform independent, in depth reviews of the  !

EOP program. These reviews are scheduled to continue on a routine basi : PLANT OPERATOR TRAINING  ;

Scope 3

,

The scope of the inspection was to verify, primarily based on performance in the simulator,-

that the control room staff understands how to implement the EOPs and are aware of recent :

changes to the procedure :

l'

':

l

.

. . _ _

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

o

.

Findings The inspector reviewed lesson plans used to instruct the plant c wrating staff in the use of EOPs. The inspector determined that the lesson plans were well written and technically consistent with the PSTG and the EOP The inspector conducted two operating scenarios using the plant referenced simulator. A plant operating crew, in dieir training cycle, demonstrated their abilities to carry out the procedural requirements of the EOPs during plant upset conditions. Following each scenario, the inspector conducted in depth discussions with the operating cre Based on interviews conducted and observed performance of the selected operating crew, the inspector determined the crew understands how to perform the EOP . The inspector also determined that the crew was knowledgeable in the requirement to secure the HPCI system at a suppression chamber water level of 95 f Conchiston The lessons plans used to instruct plant operators in the use of the EOPs are well written and are consistent with the PSTO and EOPs. The EOPs are useable by the operating crew and the crew understands how to perform the EOPs. Also, the crew is aware of recent changes to the EOPs.

l OTHER OBSERVATIONS The inspector conducted a walkthrough inspection of the back panels in the main control room. The inspector determined that housekeeping was poor in the panels inspected. The floor areas inside the back panels contained miscellaneous small nuts, screws, and discarded instrument brackets. The licensee took prompt corrective actions to improve housekeeping in the back panels of the main control roo .0 EXIT MEETING An exit meeting was conducted at the Chiltonville Training Center on January 11, 199 The inspector discussed the findings of the inspection with those individuals identified belo The licensee committed to reviewing the EOP support procedure issues and control those procedures as EOP The following personnel were contacted during the inspectio Boston Edison Company

-

  • E. S. Kraft, J Vice President, Nuclear Operations
  • L, Schmeling Plant Manager l

___ _ _ _ _ _ - _ _ _ _ _ _ _

O I

.

Iloston Edison Company

  • T. Sullivan Operations Section hianager T. Trepanier Chief Operating Engineer
  • N. Desmond Compliance Division hianager
  • R. Cannon Sr. Compliance Engineer D.long Safety Analysis Engineer
  • hi. Williams Senior QA Engineer J. Gerety FS & hic Division hianager J. Alexander Training hianager
  • T. Swan Operations Training Supervisor A. Shiever Operator Training Supervisor
  • E. Olson Training Specialist
  • W. Rothert General hianager, Technical U.S. Nuclear Regulatory Conunission

'C. Sisco Operations Engineer

  • A. Burritt Operations Engineer

,

a-__._--._______._.___._.--_---_---_---.---.-_.----_.._-..-____..--.____--.____- x