Forwards Insp Rept 50-293/93-01 on 930111-14.Section 3 of Rept Addressed Two Unresolved Items
ML20128G789
Person / Time
Site: Pilgrim
Issue date: 02/05/1993
From: Bettenhausen L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Boulette E
BOSTON EDISON CO.
Shared Package
ML20128G793 List:
References
NUDOCS 9302160107
Download: ML20128G789 (4)


See also: IR 05000293/1993001

Text

+ .

4

,:

i

FEB 5 1993

Docket No. 50 293

Dr. E. 'Il s.nas Boulette

Acting kaor Vice President-Nuclear

Pilgrim Nuclear Power Station

Boston Edison Company

RFD #1 Rocky Hill Road

Plymouth, Massachusetts 02360

Dear Dr. Boulette:

SUBJECT: INSPECTION REPORT NO. 50-293/93-01 (EMERGENCY OPERATING

PROCEDURE INSPECTION)

This letter transmits the report of a safety inspection of your facility's emergency operating

procedures _ lead by Mr. Carl Sisco from January 11 to January 14, 1993, a* the Pilgrim

. Nuclear Power Station. The inspection activities are authorized by NRC License No.

DPR-35. Discussions of our findings were held between our staffs at the conclusion of the

inspection.

The inspection is a selective review for adequacy of your facility's emergency operating

.

l

'

procedures (EOPs) and supporting development documentation, implementing procedures,

and training. This area is important to safety because it assures the continued

-implementation of generic guidance for the evaluation and development of procedures used to

mitigate the effects of transients and accidents.

The inspection concluded that your EOPs are generally technically adequate and the operating

- staff understands how to use them. Section 3 of the report addressed two unresolved items

- dealing with the timely notification of the plant operating staff of significant plant problems

and with the level of review and approval of EOP support procedures being different than -

that of the EOPs.

Mb

-Q [ OFFICIAL RECORD COPY G:PL9301.CES

JE0Y\ \

n. y

. *.

.,

Dr. E. Thomas Boulette 2 gg3

In accordance with 10 CFR 2,790 of the Commission's regulations, a copy of this letter.and

the enclosed report will be placed in the NRC Public Document Room.

Should you have any questions, please contact Mr. Richard Conte, Chief, BWR Section at

(215) 337-5210.

Sincerely,

01 , ' ' "

'

Vuut,:: L). L >

/

.O

l

Lee H. Bettenhausen, Chief

Operations Branch

Division of Reactor Safety

Enclosure: Inspection Report No. 50-293/934)1

OFFICIAL RECORD COPY G:PL9301.CES

r --

,- i

.

Dr. E. Thomas Boulette 3 FEB 5F

cc w/ encl:

E. Kraft, Acting Vice President, Nuclear Operations and Station Director

L. Schmeling, Plant Manager

V. Oheim, Manager, Regulatory Affairs and Emergency Planning Department

D. Tarantino, Nuclear Information Manager

N. Desmond, Compliance Division Manager

R. Hallisey, Department of Public Health, Commonwealth of Massachusetts

R. Adams, Department of Labor and Industries, Commonwealth of Massachusetts

The Honorable Edward M. Kennedy

The Honorable John F. Kerry

The Honorable Edward J. Markey

The Honorable Terese Murray

The Honorable Peter V. Forman

B. Abbanat, Department of Public Utilities

Chairman, Plymouth BU of Selectmen

Chairman, Duxbury Ika 1 of Selectmen

Plymouth Civil Defense Director

Paul W. Gromer, Massachusetts Secretary of Energy Resources

Sarah Woodhouse, Legislative Assistant

A. Nogee, MASSPIRG

Regional Administrator, FEMA

Office of the Commissioner, Massachusetts Department of Environmental

Engineering

Office of the Attorney General, Commonwealth of Massachusetts

T. Rapone, Massachusetts Executive Office of Public Safety

Chairman, Citizens Urging Responsible Energy-

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

K. Abraham, PAO (2)

NRC Resident Inspector

Commonwealth of Massachusetts, SLO Designee

OFFICIAL RECORD COPY G:PL9301.CES

_.

_ ___- - ---- ----- ~~

m

i

,,

_

,

Dr. E. Thomas Boulette 4

RB 5 FJM

bec w/ encl:

Region I Docket Room (with concurrences and IFS Forms)

L.- Bettenhausen, DRS

DRS/EB SALP Coordinator

R. Conte, DRS

J. Linville, DRP'

E. Kelly, DRP

J. Macdonald, SRI - Pilgrim (with concurrences and IFS Forms)

W. Butler, NRR

R. Eaton, NRR

- V. McCree, OEDO

A. Burritt, DRS

i

C. Sisco, DRS

OL Facility File

DRS File

i

,

!

'

o d k t nha

-

//h'd 2)Jfff

02/03/93

02/)93 02/3/93. g

OFFICIAL RECORD COPY G:PL9301.CES  !

i

-i

!