MONTHYEARNMP1L3570, Supplemental Information Letter - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation2024-02-0101 February 2024 Supplemental Information Letter - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation IR 05000220/20230042024-02-0101 February 2024 Integrated Inspection Report 05000220/2023004 and 05000410/2023004 NMP1L3569, CFR 50.46 Annual Report2024-01-26026 January 2024 CFR 50.46 Annual Report ML24004A2122024-01-0808 January 2024 Senior Reactor and Reactor Operator Initial License Examinations ML23354A0012024-01-0404 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0059 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML23278A1292023-12-14014 December 2023 Units 1 & 2; Limerick, Units 1 & 2; Nine Mile Point, Units 1 & 2; and Peach Bottom, Units 2 & 3 -Revision to Approved Alternatives to Use Boiling Water Reactor Vessel and Internals Project Guidelines NMP1L3566, Radiological Emergency Plan Document Revision. Includes EP-AA-1013, Revision 10, Radiological Emergency Plan Annex for Nine Mile Point Station2023-12-14014 December 2023 Radiological Emergency Plan Document Revision. Includes EP-AA-1013, Revision 10, Radiological Emergency Plan Annex for Nine Mile Point Station IR 05000410/20243012023-12-14014 December 2023 Initial Operator Licensing Examination Report 05000410/2024301 ML23305A1402023-12-13013 December 2023 Units 1 & 2; Nine Mile Point, Unit 2; Peach Bottom, Units 2 & 3; and Quad Cities, Units 1 and 2 - Issuance of Amendments to Adopt Traveler TSTF-580 NMP1L3564, Supplemental Response to Part 73 Exemption Request - Withdrawal of Request for Exemption from 10 CFR 73, Subpart B, Preemption Authority Requirements2023-12-0707 December 2023 Supplemental Response to Part 73 Exemption Request - Withdrawal of Request for Exemption from 10 CFR 73, Subpart B, Preemption Authority Requirements ML23291A4642023-12-0707 December 2023 Issuance of Amendment No. 251 Regarding the Adoption of Title 10 the Code of Federal Regulations Section 50.69, Risk-Informed Categorization and Treatment of SSC for Nuclear Power Plants ML23289A0122023-12-0606 December 2023 Issuance of Amendment No. 250 Regarding the Revision to Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b NMP1L3563, Submittal of Relief Request I5R-12, Revision 0, Concerning the Installation of a Full Structural Weld Overlay on Reactor Pressure Vessel Recirculation Inlet Nozzle N2E Safe End-to-Nozzle Dissimilar Metal Weld (32-WD-208)2023-12-0404 December 2023 Submittal of Relief Request I5R-12, Revision 0, Concerning the Installation of a Full Structural Weld Overlay on Reactor Pressure Vessel Recirculation Inlet Nozzle N2E Safe End-to-Nozzle Dissimilar Metal Weld (32-WD-208) IR 05000220/20234022023-11-28028 November 2023 Security Baseline Inspection Report 05000220/2023402 and 05000410/2023402 NMP1L3557, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-11-22022 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23317A1192023-11-10010 November 2023 Constellation Energy Generation, LLC - 2023 Annual Report - Guarantees of Payment of Deferred Premiums IR 05000220/20234202023-11-0101 November 2023 Security Baseline Inspection Report 05000220/2023420 and 05000410/2023420 ML23305A0052023-11-0101 November 2023 Operator Licensing Examination Approval IR 05000220/20230032023-10-25025 October 2023 Integrated Inspection Report 05000220/2023003 and 05000410/2023003 IR 05000220/20235012023-10-17017 October 2023 Emergency Preparedness Biennial Exercise Inspection Report 05000220/2023501 and 05000410/2023501 IR 05000220/20230112023-10-16016 October 2023 Comprehensive Engineering Team Inspection Report 05000220/2023011 and 05000410/2023011 RS-23-097, Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans2023-10-12012 October 2023 Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans NMP1L3554, Submittal of Revision 28 to the Final Safety Analysis Report (Updated), Fire Protection Design Criteria Document, 10CFR50.59 Evaluation Summary Report, 10CFR54.37(b) Aging Management Review, and Technical Specifications with Revised Bases2023-10-0606 October 2023 Submittal of Revision 28 to the Final Safety Analysis Report (Updated), Fire Protection Design Criteria Document, 10CFR50.59 Evaluation Summary Report, 10CFR54.37(b) Aging Management Review, and Technical Specifications with Revised Bases C IR 05000220/20233032023-09-20020 September 2023 Retake Operator Licensing Examination Report 05000220/2023303 ML23250A0822023-09-19019 September 2023 Regulatory Audit Summary Regarding LARs to Adopt TSTF-505, Rev. 2, and 10 CFR 50.69 ML23257A1732023-09-14014 September 2023 Requalification Program Inspection IR 05000220/20230052023-08-31031 August 2023 Updated Inspection Plan for Nine Mile Point Nuclear Station, Units 1 and 2 (Report 05000220/2023005 and 05000410/2023005) RS-23-080, Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs2023-08-30030 August 2023 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs NMP2L2851, Relief Request Associated with Successive Inspections for Generic Letter 88-01 / BWRVIP-75-A Augmented Examinations2023-08-25025 August 2023 Relief Request Associated with Successive Inspections for Generic Letter 88-01 / BWRVIP-75-A Augmented Examinations ML23151A3472023-08-21021 August 2023 Issuance of Amendments to Adopt TSTF-295-A, Modify Note 2 to Actions of PAM Table to Allow Separate Condition Entry for Each Penetration NMP1L3534, License Amendment Request - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation2023-08-18018 August 2023 License Amendment Request - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation ML23220A0262023-08-0808 August 2023 Licensed Operator Positive Fitness-for-Duty Test IR 05000220/20234012023-08-0808 August 2023 Cyber Security Inspection Report 05000220/2023401 and 05000410/2023401 (Cover Letter Only) NMP1L3545, Supplemental Information Letter to Adopt TSTF-505, Provide Risk- Informed Extended Completion Times - RITSTF Initiative 4b, Revision 2 and 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems .2023-08-0404 August 2023 Supplemental Information Letter to Adopt TSTF-505, Provide Risk- Informed Extended Completion Times - RITSTF Initiative 4b, Revision 2 and 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems . RS-23-087, Revision to Approved Alternatives Associated with the Use of the BWRVIP Guidelines in Lieu of Specific ASME Code Requirements on Reactor2023-08-0404 August 2023 Revision to Approved Alternatives Associated with the Use of the BWRVIP Guidelines in Lieu of Specific ASME Code Requirements on Reactor IR 05000220/20230022023-08-0101 August 2023 Integrated Inspection Report 05000220/2023002 and 05000410/2023002 ML23207A0762023-07-14014 July 2023 EN 56557 - Update to Part 21 Report Re Potential Defect with Trane External Auto/Stop Emergency Stop Relay Card Pn: XI2650728-06 NMP1L3544, Fifth Inservice Inspection Interval, First Inservice Inspection Period 2023 Owner'S Activity Report for RFO-27 Inservice Examinations2023-07-14014 July 2023 Fifth Inservice Inspection Interval, First Inservice Inspection Period 2023 Owner'S Activity Report for RFO-27 Inservice Examinations ML23186A1642023-07-0606 July 2023 Operator Licensing Retake Examination Approval NMP2L2846, Nine Mire Point Nuclear Station, Units 1 and 2, General License 30-day Cask Registration Notifications2023-07-0505 July 2023 Nine Mire Point Nuclear Station, Units 1 and 2, General License 30-day Cask Registration Notifications ML23192A0622023-06-30030 June 2023 Engine Systems, Inc., 10CFR21 Reporting of Defects and Non-Compliance, Report No. 10CFR21-0136, Rev. 0 IR 05000220/20230102023-06-29029 June 2023 Biennial Problem Identification and Resolution Inspection Report 05000220/2023010 and 05000410/2023010 ML23131A4242023-06-23023 June 2023 Issuance of Amendment No. 249 Regarding the Revision to Technical Specification 3.3.1 to Adopt Technical Specifications Task Force Traveler TSTF-568 RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations NMP1L3539, Day Commitment Response - Relief Request I5R-11 Concerning the Installation of a Weld Overlay on Reactor Pressure Vessel Recirculation Inlet Nozzle N2E Safe End-to-Nozzle Dissimilar Metal Weld (32-WD-208)2023-06-0909 June 2023 Day Commitment Response - Relief Request I5R-11 Concerning the Installation of a Weld Overlay on Reactor Pressure Vessel Recirculation Inlet Nozzle N2E Safe End-to-Nozzle Dissimilar Metal Weld (32-WD-208) ML23159A0052023-06-0505 June 2023 56557-EN 56557 - Paragon - Redlined RS-23-042, Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling2023-05-25025 May 2023 Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling IR 05000410/20233022023-05-15015 May 2023 Initial Operator Licensing Examination Report 05000410/2023302 2024-02-01
[Table view] Category:License-Operator Examination Report
MONTHYEARIR 05000410/20243012023-12-14014 December 2023 Initial Operator Licensing Examination Report 05000410/2024301 IR 05000220/20233032023-09-20020 September 2023 Retake Operator Licensing Examination Report 05000220/2023303 IR 05000220/20203012021-01-25025 January 2021 Initial Operator Licensing Examination Report 05000220/2020301 IR 05000410/20193012020-02-11011 February 2020 Initial Operator Licensing Examination Report 05000410/2019301 IR 05000220/20183012019-02-21021 February 2019 Initial Operator Licensing Examination Report 05000220/2018301 IR 05000410/20173022018-02-12012 February 2018 Initial Operator Licensing Examination Report 05000410/2017302 IR 05000220/20173012017-04-13013 April 2017 NRC Initial Operator Licensing Examination Report 05000220/2017301 IR 05000410/20153022016-01-27027 January 2016 Er 05000410/2015302; 11-30-12/22/2015; Nine Mile Point Unit 2 Initial Operator Licensing Examination Report IR 05000220/20153012015-05-0606 May 2015 Er 05000220/2015301; March 2- to 10, 2015, and March 12, 2015; Nine Mile Point Nuclear Station, Unit 1; Initial Operator Licensing Examination Report ML15057A0142015-02-25025 February 2015 Initial Operator Licensing Operating Test and Written Examination Approval, Nine Mile Point, Unit 1 RS-14-164, (EGC) Response to NRC Regulatory Issue Summary 2014-05, Preparation and Scheduling of Operator Licensing Examinations2014-05-29029 May 2014 (EGC) Response to NRC Regulatory Issue Summary 2014-05, Preparation and Scheduling of Operator Licensing Examinations IR 05000410/20143012014-05-0505 May 2014 Er 05000410/2014301; March 3 10, 2014; Nine Mile Point Nuclear Station, Unit 2; Initial Operator Licensing Examination Report ML13200A0062013-07-15015 July 2013 Response to NRC Regulatory Issue Summary 2013-06 IR 05000410/20123012012-04-23023 April 2012 Er 05000410-12-301, on March 19-26, 2012, Nine Mile Point Unit 2, Initial Operator Licensing Examination Report IR 05000410/20103022011-01-18018 January 2011 Er 05000410-10-302, on 11/15/10 - 11/22/10, Nine Mile Point, Unit 2, Initial Operator Licensing Examination Report IR 05000220/20093012009-10-24024 October 2009 Er 05000220-09-301 on 09/08/09 for Nine Mile Point Unit 1 ML0931404432009-10-24024 October 2009 Er 05000220-09-303; 08/31/2009 - 09/08/2009; Nine Mile Point Nuclear Station Unit 1; Initial Operator Licensing Examination Report (Corrected Report) ML0909801382009-04-0808 April 2009 Er 05000220-09-301; March 3, 2009; Nine Mile Point Nuclear Generating Station Unit 1, Operator Licensing Retake Examination Report IR 05000220/20083022008-11-26026 November 2008 Er 05000220-08-302, on October 6-23, 2008, Nine Mile Point Nuclear Station, Unit 1; Initial Operator Licensing Examination Report IR 05000410/20083032008-11-10010 November 2008 Er 05000410-08-303; on October 6-10, 2008; Nine Mile Point Nuclear Generating Station Unit 2, Operator Licensing Retake Examination Report IR 05000410/20083012008-04-23023 April 2008 Er 05000410-08-301, Exam Dates 3/10 - 3/17/2008, Nine Mile Point Nuclear Station, Unit 2, Initial Operator Licensing Examination IR 05000220/20073012007-04-19019 April 2007 IR 05000220-07-301, on 03/12-16/2007; Nine Mile Point Unit 1; Initial Operator Licensing Examination IR 05000220/20053012005-02-0303 February 2005 IR 05000220-05-301 on November 1-18, 2004 for Nine Mile Point Unit 1; Initial Operator Licensing Examination. Seven of Nine Applicants Passed the Examination (Three Reactor Operators, Four SRO Instants) 2023-09-20
[Table view] |
Text
ary 21, 2019
SUBJECT:
NINE MILE POINT NUCLEAR STATION, UNIT 1 - INITIAL OPERATOR LICENSING EXAMINATION REPORT 05000220/2018301
Dear Mr. Hanson:
On December 12, 2018, the U.S. Nuclear Regulatory Commission (NRC) completed an examination at Nine Mile Point Nuclear Station, Unit 1. The enclosed examination report documents the examination results, which were discussed on January 25, 2019, with Messrs.
Julian Thompson, James Tsardakas, Gregory Elkins, and other members of your staff.
The examination included the evaluation of three applicants for reactor operator licenses, six applicants for instant senior reactor operator licenses, and three applicants for upgrade senior reactor operator licenses. The written and operating examinations were developed using NUREG-1021, "Operator Licensing Examination Standards for Power Reactors," Revision 11.
The license examiners determined that all 12 of the applicants satisfied the requirements of Title 10 of the Code of Federal Regulations (10 CFR) Part 55, and the appropriate licenses were issued on January 25, 2019.
No findings were identified during this examination. This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations (10 CFR), Part 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely,
/RA/
Donald E. Jackson, Chief Operations Branch Division of Reactor Safety Docket No. 50-220 License No. DPR-63 Enclosure:
Examination Report 05000220/2018301 w/Attachment: Supplementary Information cc w/encl: Distribution via ListServ
SUMMARY
ER 05000220/2018301; December 3-7, 2018, December 12, 2018; Nine Mile Point Nuclear
Station (Nine Mile Point), Unit 1; Initial Operator Licensing Examination Report.
Four NRC examiners evaluated the competency of three applicants for reactor operator licenses, six applicants for instant senior reactor operator licenses, and three applicants for upgrade senior reactor operator licenses at Nine Mile Point, Unit 1. The facility licensee developed the examinations using NUREG-1021, "Operator Licensing Examination Standards for Power Reactors," Revision 11. The written examination was administered by the facility on December 12, 2018. NRC examiners administered the operating tests on December 3-7, 2018.
The NRC examiners determined that all 12 of the applicants satisfied the requirements of Title 10 of the Code of Federal Regulations (10 CFR) Part 55, and the appropriate licenses have been issued.
NRC-Identified and Self-Revealing Findings
No findings were identified.
Licensee-Identified Violations
None.
REPORT DETAILS
OTHER ACTIVITIES (OA)
4OA5 Other Activities (Initial Operator License Examination)
.1 License Applications
a. Scope
The examiners reviewed all 12 license applications submitted by the licensee to ensure the applications reflected that each applicant satisfied relevant license eligibility requirements. The applications were submitted on NRC Form 398, Personal Qualification Statement, and NRC Form 396, Certification of Medical Examination by Facility Licensee. The examiners also audited three of the license applications in detail to confirm that they accurately reflected the subject applicants qualifications. This audit focused on the applicants experience and on-the-job training, including control manipulations that provided significant reactivity changes.
b. Findings
No findings were identified.
.2 Operator Knowledge and Performance
a. Examination Scope
On December 12, 2018, the licensee proctored the administration of the written examinations to all 12 applicants. The licensee staff graded the written examinations, analyzed the results, and presented their analysis to the NRC on December 18, 2018.
The NRC examination team administered the various portions of the operating examination to all 12 applicants on December 3-7, 2018. The three applicants for reactor operator licenses participated in two dynamic simulator scenarios, in a control room and facilities walkthrough test consisting of 11 system tasks, and an administrative test consisting of four administrative tasks. The six applicants seeking an instant senior reactor operator license participated in three dynamic simulator scenarios, a control room and facilities walkthrough test consisting of ten system tasks, and an administrative test consisting of five administrative tasks. The three applicants for upgrade senior reactor operator licenses participated in two dynamic simulator scenarios, a control room and facilities walkthrough test consisting of five system tasks, and an administrative test consisting of five administrative tasks.
b. Findings
All 12 of the applicants passed all parts of the operating test. For the written examinations, the reactor operator applicants average score was 93.33 percent and ranged from 92 to 94.66 percent, and the senior operator applicants average score was 91.22 percent and ranged from 88 to 93 percent. Chapter ES-403 and Form ES-403-1 of NUREG-1021 require the licensee to analyze the validity of any written examination questions that were missed by half or more of the applicants. The licensee conducted this performance analysis for six questions that met these criteria and submitted the analysis to the chief examiner. The NRC examiners completed the final grading of the written examination on January 25, 2019, and conducted a review of each missed question to determine the accuracy and validity of the examination questions.
The licensee submitted one post-examination comment, reanalyzing the expected technical specification action requirements for Event 5 in Simulator Scenario 5. The NRC reviewed the facilitys post-exam comment submittal package and generally agreed with the facility analysis and graded the operating test technical specification action statements in accordance with this assessment. The text of the written examination questions, the operating test, and the licensees post-examination comments with the NRC resolutions may be accessed in the ADAMS system under the accession numbers noted in the Attachment 1. In accordance with current NRC policy the release of these documents will be delayed for two years.
.3 Initial Licensing Examination Development
a. Examination Scope
The facility licensee developed the examinations in accordance with NUREG-1021, Revision 11. All licensee facility training and operations staff involved in examination preparation and validation were listed on a security agreement. The facility licensee submitted both the written and operating examination outlines on July 3, 2018. The chief examiner reviewed the outlines against the requirements of NUREG-1021, and provided comments to the licensee. The facility licensee submitted the draft examination package on September 19, 2018. The chief examiner reviewed the draft examination package against the requirements of NUREG-1021. The NRC conducted an onsite validation of the operating examinations and provided comments during the week of November 5, 2018. The licensee satisfactorily completed comment resolution on November 28, 2018.
b. Findings
The NRC approved the initial examination outline and advised the licensee to proceed with the operating examination development.
The examiners determined that the written and operating examinations initially submitted by the licensee were within the range of acceptability expected for a proposed examination.
No findings were identified.
.4 Simulation Facility Performance
a. Examination Scope
The examiners observed simulator performance with regard to plant fidelity during the examination validation and administration.
b. Findings
No findings were identified.
.5 Examination Security
a. Examination Scope
The examiners reviewed examination security for examination development and during both the onsite preparation week and examination administration week for compliance with NUREG-1021, Revision 11 requirements. Plans for simulator security and applicant control were reviewed and discussed with licensee personnel.
b. Findings
No findings were identified.
4OA6 Meetings, Including Exit
The chief examiner presented the examination results to Messrs. Julian Thompson, Director Site Operations and James Tsardakas, Director Site Training, and other members of the licensee's management staff on January 25, 2019. The licensee acknowledged the findings presented.
The licensee did not identify any information or materials used during the examination as proprietary.
4OA7 Licensee-Identified Violations
None ATTACHMENT:
SUPPLEMENTARY INFORMATION
KEY POINTS OF CONTACT
Licensee Personnel
- G. Elkins, Operations Training Manager
- P. Isham, Exam Developer
- I. Van Brocklin, Initial License Training Lead
ITEMS OPENED, CLOSED, AND DISCUSSED
Opened
NONE
Opened and Closed
NONE
Closed
NONE
Discussed
NONE
ADAMS DOCUMENTS REFERENCED