| Quarter | Site | Title |
---|
05000313/FIN-2018003-01 | 2018Q3 | Arkansas Nuclear | Failure to Translate the Design Requirements into Instructions for Refueling Emergency Diesel Generators |
05000400/FIN-2018002-01 | 2018Q2 | Harris | Failure to Promptly Identify and Correct a Condition Adverse to Quality For a Through-Wall Leak in the ESW Screen Wash Piping |
05000272/FIN-2018001-01 | 2018Q1 | Salem | Implementing Procedures for Beyond Design Basis FLEX Mitigating Strategies Not Followed |
05000263/FIN-2018001-01 | 2018Q1 | Monticello | Failure to Follow Procedure for Storage of Equipment Near Safety-Related Equipment |
05000266/FIN-2018001-01 | 2018Q1 | Point Beach | Failure to Evaluate and Characterize Fire Protection Pipe Wall Degradation |
05000353/FIN-2017003-01 | 2017Q3 | Limerick | Operational Condition Mode Change from Startup to Run was Made with RCIC Inoperable |
05000313/FIN-2017003-01 | 2017Q3 | Arkansas Nuclear | Failure to Maintain Service Water Train Separation |
05000250/FIN-2017003-01 | 2017Q3 | Turkey Point | Failure to Identify and Correct CCW Pipe Corrosion |
05000352/FIN-2017001-02 | 2017Q1 | Limerick | Failure to Implement Human Performance Tools Results in Draining of Emergency Diesel Generator Jacket Water System |
05000445/FIN-2017001-02 | 2017Q1 | Comanche Peak | Failure to Evaluate Heat Loads on Control Room Air Conditioning System |