05000400/FIN-2018002-01
Jump to navigation
Jump to search
Site: | Harris |
---|---|
Report | IR 05000400/2018002 Section 1R04 |
Date counted | Jun 30, 2018 (2018Q2) |
Type: | NCV: Green |
cornerstone | Mitigating Systems |
Identified by: | NRC identified |
Inspection Procedure: | IP 71111.04 |
Inspectors (proximate) | J Zeiler A Patz A Butcavage C Fontana R Kellner J Panfel S Sanchez J Walker R Williams S Rose |
Violation of: | 10 CFR 50 Appendix B 10 CFR 50 Appendix B Criterion XVI |
CCA | P.1, Identification |
INPO aspect | PI.1 |
' | |