GO2-22-042, Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Colling Using the Consolidated Line Item Improvement Process

From kanterella
Jump to navigation Jump to search

Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Colling Using the Consolidated Line Item Improvement Process
ML22145A465
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 05/25/2022
From: David Brown
Energy Northwest
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
GO2-22-042
Download: ML22145A465 (16)


Text

        

ENERGY David P. Brown Columbia Generating Station NORTHWEST P.O. Box 968, PE23 Richland, WA 99352-0968 509.377.8385 dpbrown@energy-northwest.com May 25, 2022 GO2-22-042 10 CFR 50.90 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001

Subject:

COLUMBIA GENERATING STATION, DOCKET NO. 50-397 APPLICATION TO REVISE TECHNICAL SPECIFICATIONS TO ADOPT TSTF-580, PROVIDE EXCEPTION FROM ENTERING MODE 4 WITH NO OPERABLE RHR SHUTDOWN COOLING USING THE CONSOLIDATED LINE ITEM IMPROVEMENT PROCESS

Dear Sir or Madam:

Pursuant to 10 CFR 50.90, Energy Northwest is submitting a request for an amendment to the Technical Specifications (TS) for Columbia Generating Station (Columbia).

Energy Northwest requests adoption of TSTF-580, Provide Exception from Entering Mode 4 With No Operable RHR Shutdown Cooling, which is an approved change to the Improved Standard Technical Specifications, into the Columbia TS. The proposed amendment provides a TS exception to entering Mode 4 if both required Residual Heat Removal shutdown cooling subsystems are inoperable.

The enclosure provides a description and assessment of the proposed changes.

Attachment 1 provides the existing TS pages marked to show the proposed changes.

Attachment 2 provides revised (clean) TS pages. Attachment 3 provides existing TS Bases pages marked to show the proposed changes and is provided for information only.

Approval of the proposed amendment is requested within one year from the date of this letter. Once approved, the amendment shall be implemented within 90 days thereafter.

There are no regulatory commitments made in this submittal.

        

GO2-22-042 Page 2 of 2 In accordance with 10 CFR 50.91, a copy of this application, with attachments, is being provided to the designated Washington State Official.

If there are any questions or if additional information is needed, please contact Mr. R.M. Garcia, Licensing Supervisor, at 509-377-8463.

I declare under penalty of perjury that the foregoing is true and correct.

 !

Executed this ______ day of ___________ 2022.

Respectfully, David P. Brown Site Vice President

Enclosure:

Description and Assessment Attachments: 1. Proposed &ROXPELDTechnical Specification Changes (Mark-Up)

 Revised &ROXPELDTechnical Specification Pages

 Proposed &ROXPELDTechnical Specification Bases Changes

(Mark-Up forInformation Only) cc: NRC RIV Regional Administrator NRC NRR Project Manager NRC Senior Resident Inspector/988C CD Sonoda - BPA/1399 EFSECutc.wa.gov - EFSEC E Fordham - WDOH R Brice - WDOH L Albin - WDOH

        

GO2-22-042 Enclosure Page 1 of 4 DESCRIPTION AND ASSESSMENT

1.0 DESCRIPTION

Energy Northwest requests adoption of TSTF-580, Provide Exception from Entering Mode 4 With No Operable RHR Shutdown Cooling, which is an approved change to the Improved Standard Technical Specifications (ISTS), into the Columbia Generating Station (Columbia) Technical Specifications (TS). The proposed amendment provides a TS exception to entering Mode 4 if both required Residual Heat Removal (RHR) shutdown cooling subsystems are inoperable.

2.0 ASSESSMENT 2.1 Applicability of Safety Evaluation Energy Northwest has reviewed the safety evaluation for TSTF-580 provided to the Technical Specifications Task Force in letter dated July 11, 2021. This review included a review of the Nuclear Regulatory Commission (NRC) staffs evaluation, as well as the information provided in TSTF-580. Energy Northwest has concluded that the justifications presented in TSTF-580 and the safety evaluation prepared by the NRC staff are applicable to Columbia and justify this amendment for the incorporation of the changes to the Columbia TS.

Adoption of TSTF-566, Revise Actions for Inoperable RHR Shutdown Cooling Subsystems, was approved by the NRC for Columbia on January 25, 2021 (ADAMS Accession No. ML21005A178).

2.2 Variations TSTF-580 makes additional changes to the Actions of TS 3.4.9, RHR Shutdown Cooling System - Hot Shutdown that were revised by TSTF-566, Revise Actions for Inoperable RHR Shutdown Cooling Subsystems, which is consistent with the staffs approval of TSTF-580. The TSTF-580 justification states that adoption is dependent on previous adoption of TSTF-566-A, which was implemented at Columbia on March 4, 2021.

Columbia is a Boiling Water Reactor (BWR)/5 plant. Columbias TS 3.4.9 is aligned with BWR/6 Standard Technical Specifications (NUREG-1434). Energy Northwest is not proposing any variations from the TS changes described in TSTF-580 or the applicable parts of the NRC staffs safety evaluation dated July 11, 2021.

Energy Northwest is proposing the following variations associated with TS Bases markups provided in NUREG-1434 for TSTF-580. These variations do not affect the applicability of TSTF-580 or the NRC staffs safety evaluation dated July 11, 2021.

        

GO2-22-042 Enclosure Page 2 of 4 2.2.1 TS Bases 3.4.9 NUREG-1434 contains Spent Fuel Pool Cooling System as alternate methods for decay heat removal. Columbias TS Bases do not contain Spent Fuel Pool Cooling System, as Columbias Fuel Pool Cooling System does not contain the word Spent. This is an acceptable variation.

Columbias Fuel Pool Cooling System cannot be aligned for use for decay heat removal from the core as an alternate method of decay heat removal without the Reactor Pressure Vessel (RPV) head off and the RPV cavity flooded up to the Fuel Pool level with the gates open between the RPV cavity and the Fuel Pool. This is an acceptable variation.

Additionally, Columbia TS Bases contain additional systems not included in NUREG-1434: Condensate, Main Steam, Control Rod Drive, and Emergency Core Cooling Systems. These systems are specific to Columbia used in alternate decay heat removal alignments and provide more detail than currently specified in NUREG-1434 and TSTF-580. As such, this is an acceptable variation.

3.0 REGULATORY ANALYSIS

3.1 No Significant Hazards Consideration Analysis Energy Northwest requests adoption of TSTF-580, Provide Exception from Entering Mode 4 With No Operable RHR Shutdown Cooling, which is an approved change to the ISTS, into the Columbia TS. The proposed amendment provides a TS exception to entering Mode 4 if both required RHR shutdown cooling subsystems are inoperable.

Energy Northwest has evaluated whether or not a significant hazards consideration is involved with the proposed amendment by focusing on the three standards set forth in 10 CFR 50.92, Issuance of Amendment as discussed below:

1. Does the proposed amendment involve a significant increase in the probability or consequences of an accident previously evaluated?

Response: No The proposed change would exempt entering Mode 4 if both required RHR

shutdown cooling subsystems are inoperable and other operating modes of the

RHR System are inoperable, such as Low Pressure CoRODQW Injection and RHR

suppression pool cooling, and both subsystems of the support system for the RHR

System heat exchangers, the RHR Service Water (RHRSW) System, are

inoperable. The TS for those RHR operating modes and the RHRSW System

require entering Mode 4 when both required subsystems are inoperable. Those

operating modes and systems are not initiators to any accident previously

evaluated but are used to mitigate the consequences of an accident previously

        

GO2-22-042 Enclosure Page 3 of 4 evaluated. However, the consequences of an accident previously evaluated resulting from remaining in Mode 3 versus Mode 4 when RHR shutdown cooling subsystems are inoperable are not significantly increased because there would be no dependable method to remove post-accident decay heat in Mode 4 if both required RHR shutdown cooling subsystems are inoperable.

Therefore, the proposed change does not involve a significant increase in the probability or consequences of an accident previously evaluated.

2. Does the proposed amendment create the possibility of a new or different kind of accident from any accident previously evaluated?

Response: No The proposed change provides a TS exception to entering Mode 4 if both required RHR shutdown cooling subsystems are inoperable. The proposed change does not affect the design function or operation of the RHR shutdown cooling subsystems.

No new equipment is being installed as a result of the proposed change. The proposed change only affects the actions taken when both RHR shutdown cooling subsystems are inoperable, so no new failure mechanisms are created.

Therefore, the proposed change does not create the possibility of a new or different kind of accident from any accident previously evaluated.

3. Does the proposed amendment involve a significant reduction in a margin of safety?

Response: No The proposed change provides a TS exception to entering Mode 4 if both required RHR shutdown cooling subsystems are inoperable. The proposed change does not change any specific values or controlling parameters that define margin in the design or licensing basis. No safety limits are affected by the proposed change.

The proposed change applies when both required RHR shutdown cooling subsystems are inoperable; therefore, no design or safety limits associated with the operation of the RHR System are affected.

Therefore, the proposed change does not involve a significant reduction in a margin of safety.

Based on the above, Energy Northwest concludes that the proposed change presents no significant hazards consideration under the standards set forth in 10 CFR 50.92(c), and, accordingly, a finding of no significant hazards consideration is justified.

        

GO2-22-042 Enclosure Page 4 of 4 3.2 Conclusion In conclusion, based on the considerations discussed above, (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) such activities will be conducted in compliance with the Commissions regulations, and (3) the issuance of the amendment will not be inimical to the common defense and security or to the health and safety of the public.

4.0 ENVIRONMENTAL CONSIDERATION

The proposed change would change a requirement with respect to installation or use of a facility component located within the restricted area, as defined in 10 CFR 20, or would change an inspection or surveillance requirement. However, the proposed change does not involve (i) a significant hazards consideration, (ii) a significant change in the types or significant increase in the amounts of any effluents that may be released offsite, or (iii) a significant increase in individual or cumulative occupational radiation exposure.

Accordingly, the proposed change meets the eligibility criterion for categorical exclusion set forth in 10 CFR 51.22(c)(9). Therefore, pursuant to 10 CFR 51.22(b), no environmental impact statement or environmental assessment need be prepared in connection with the proposed change.

        

GO2-22-042 Attachment 1 Page 1 of 3 Proposed Columbia Technical Specification Changes (Mark-Up)

        

GO2-22-042 Attachment 1 RHR Shutdown Cooling System - Hot Shutdown Page 2 of 3 3.4.9 3.4 REACTOR COOLANT SYSTEM (RCS) 3.4.9 Residual Heat Removal (RHR) Shutdown Cooling System - Hot Shutdown LCO 3.4.9 Two RHR shutdown cooling subsystems shall be OPERABLE, and, with no recirculation pump in operation, at least one RHR shutdown cooling subsystem shall be in operation.


NOTES-------------------------------------------

1. Both RHR shutdown cooling subsystems and recirculation pumps may be removed from operation for up to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> per 8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> period.
2. One RHR shutdown cooling subsystem may be inoperable for up to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> for performance of Surveillances.

APPLICABILITY: MODE 3 with reactor steam dome pressure less than 48 psig.

ACTIONS


NOTE-----------------------------------------------------------

Separate Condition entry is allowed for each RHR shutdown cooling subsystem.

CONDITION REQUIRED ACTION COMPLETION TIME A. One or two RHR A.1 Verify an alternate method 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> shutdown cooling of decay heat removal is subsystems inoperable. available for each AND inoperable RHR shutdown cooling subsystem. Once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> thereafter B. Required Action and B.1 Initiate action to restore Immediately associated Completion RHR shutdown cooling Time of Condition A not subsystem(s) to met. OPERABLE status.

Columbia Generating Station 3.4.9-1 Amendment No. 169,187 225 263

        

GO2-22-042 RHR Shutdown Cooling System - Hot Shutdown Attachment 1 3.4.9 Page 3 of 3 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME

&. 7ZR RHR shutdown &.1 9HULI\DQDOWHUQDWHPHWKRG hour cooling subsystemV RIGHFD\KHDWUHPRYDOLV

LQRSHUDEOH. DYDLODEOHIRUHDFK AND LQRSHUDEOH5+5VKXWGRZQ

FRROLQJVXEV\VWHP. Once per 2 hours thereafter

'. RHTXLUHG$FWLRQDQG 127(

DVVRFLDWHG&RPSOHWLRQ /&2DQGDOORWKHU/&2

7LPHRI&RQGLWLRQ& 5HTXLUHG$FWLRQVUHTXLULQJD

QRWPHW. 02'(FKDQJHWR02'(PD\EH

VXVSHQGHGXQWLORQH5+5

VKXWGRZQFRROLQJVXEV\VWHPLV

UHVWRUHGWR23(5$%/(VWDWXV



'.1 Initiate action to restore Immediately one RHR shutdown cooling subsystem WR

23(5$%/(VWDWXV.

(&. No RHR shutdown (&.1 Initiate action to restore one Immediately cooling subsystem in RHR shutdown cooling operation. subsystem or one recirculation pump to AND operation.

No recirculation pump in AND operation.

(&.2 Verify reactor coolant 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> from discovery circulation by an alternate of no reactor coolant method. circulation AND Once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> thereafter AND

(&.3 Monitor reactor coolant Once per hour temperature and pressure.

Columbia Generating Station 3.4.9-2 Amendment No. 164,169 225 238 246 263

        

GO2-22-042 Attachment 2 Page 1 of 3 Revised Columbia Technical Specification Pages

        

GO2-22-042 Attachment 2 RHR Shutdown Cooling System - Hot Shutdown Page 2 of 3 3.4.9 3.4 REACTOR COOLANT SYSTEM (RCS) 3.4.9 Residual Heat Removal (RHR) Shutdown Cooling System - Hot Shutdown LCO 3.4.9 Two RHR shutdown cooling subsystems shall be OPERABLE, and, with no recirculation pump in operation, at least one RHR shutdown cooling subsystem shall be in operation.


NOTES-------------------------------------------

1. Both RHR shutdown cooling subsystems and recirculation pumps may be removed from operation for up to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> per 8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> period.
2. One RHR shutdown cooling subsystem may be inoperable for up to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> for performance of Surveillances.

APPLICABILITY: MODE 3 with reactor steam dome pressure less than 48 psig.

ACTIONS


NOTE-----------------------------------------------------------

Separate Condition entry is allowed for each RHR shutdown cooling subsystem.

CONDITION REQUIRED ACTION COMPLETION TIME A. One 5+5VKXWGRZQ A.1 Verify an alternate method 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> cooling subsystem of decay heat removal is inoperable. available. AND Once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> thereafter B. Required Action and B.1 Initiate action to restore Immediately associated Completion RHR shutdown cooling Time of Condition A not subsystem to met. OPERABLE status.

Columbia Generating Station 3.4.9-1 Amendment No. 169,187 225 263

        

GO2-22-042 RHR Shutdown Cooling System - Hot Shutdown Attachment 2 3.4.9 Page 3 of 3 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME

&. 7ZR RHR shutdown &.1 9HULI\DQDOWHUQDWHPHWKRG hour cooling subsystemV RIGHFD\KHDWUHPRYDOLV

LQRSHUDEOH. DYDLODEOHIRUHDFK AND LQRSHUDEOH5+5VKXWGRZQ

FRROLQJVXEV\VWHP. Once per 2 hours thereafter

'. RHTXLUHG$FWLRQDQG 127(

DVVRFLDWHG&RPSOHWLRQ /&2DQGDOORWKHU/&2

7LPHRI&RQGLWLRQ& 5HTXLUHG$FWLRQVUHTXLULQJD

QRWPHW. 02'(FKDQJHWR02'(PD\EH

VXVSHQGHGXQWLORQH5+5

VKXWGRZQFRROLQJVXEV\VWHPLV

UHVWRUHGWR23(5$%/(VWDWXV



'.1 Initiate action to restore Immediately one RHR shutdown cooling subsystem WR

23(5$%/(VWDWXV.

(. No RHR shutdown (.1 Initiate action to restore one Immediately cooling subsystem in RHR shutdown cooling operation. subsystem or one recirculation pump to AND operation.

No recirculation pump in AND operation.

(.2 Verify reactor coolant 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> from discovery circulation by an alternate of no reactor coolant method. circulation AND Once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> thereafter AND

(.3 Monitor reactor coolant Once per hour temperature and pressure.

Columbia Generating Station 3.4.9-2 Amendment No. 164,169 225 238 246 263

        

GO2-22-042 Attachment 3 Page 1 of 4 Proposed Columbia Technical Specification Bases Changes (Mark-Up For Information Only

        

GO2-22-042 Attachment 3 RHR Shutdown Cooling System - Hot Shutdown Page 2 of 4 B 3.4.9 BASES ACTIONS A Note has been provided to modify the ACTIONS related to RHR shutdown cooling subsystems. Section 1.3, Completion Times, specifies once a Condition has been entered, subsequent divisions, subsystems, components or variables expressed in the Condition, discovered to be inoperable or not within limits, will not result in separate entry into the Condition. Section 1.3 also specifies Required Actions of the Condition continue to apply for each additional failure, with Completion Times based on initial entry into the Condition. However, the Required Actions for inoperable shutdown cooling subsystems provide appropriate compensatory measures for separate inoperable shutdown cooling subsystems. As such, a Note has been provided that allows separate Condition entry for each inoperable RHR shutdown cooling subsystem.

A.1 With one RHR shutdown cooling subsystem inoperable for decay heat removal, except as permitted by LCO Note 2, the overall reliability is reduced because a single failure in the OPERABLE subsystem could result in reduced RHR shutdown cooling capability. Therefore an alternate method of decay heat removal must be provided.

With both RHR shutdown cooling subsystems inoperable, an alternate method of decay heat removal must be provided in addition to that provided for the initial RHR shutdown cooling subsystem inoperability.

This re-establishes backup decay heat removal capabilities, similar to the requirements of the LCO. The 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> Completion Time is based on the decay heat removal function and the probability of a loss of the available decay heat removal capabilities. Furthermore, verification of the functional availability of these alternate method(s) must be reconfirmed every 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> thereafter. This will provide assurance of continued heat removal capability.

The required cooling capacity of the alternate method should be sufficient to maintain or reduce temperature. Decay heat removal by ambient losses can be considered as, or contributing to, the alternate method capability. Alternate methods that can be used include (but are not limited to) the Condensate and Main Steam Systems, the Reactor Water Cleanup System (by itself, or using feed and bleed in combination with the Control Rod Drive System or Condensate System), a combination of an ECCS pump and a safety/relief valve, or an inoperable but functional RHR shutdown cooling subsystem.

Columbia Generating Station B 3.4.9-3 Revision 120

        

GO2-22-042 RHR Shutdown Cooling System - Hot Shutdown Attachment 3 B 3.4.9 Page 3 of 4 BASES ACTIONS (continued)

B.1 If the required alternate method(s) of decay heat removal cannot be verified within one hour, immediate action must be taken to restore the inoperable RHR shutdown cooling subsystem(s) to operable status. The Required Action will restore redundant decay heat removal paths. The immediate Completion Time reflects the importance of maintaining the availability of two paths for heat removal.

Insert 1 >

- (C.2, (C.1, - and (C.3 -

With no RHR shutdown cooling subsystem and no recirculation pump in operation, except as is permitted by LCO Note 1, reactor coolant circulation by the RHR shutdown cooling subsystem or one recirculation pump must be restored without delay.

Until RHR or recirculation pump operation is re-established, an alternate method of reactor coolant circulation must be placed into service. This will provide the necessary circulation for monitoring coolant temperature.

The 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> Completion Time is based on the coolant circulation function and is modified such that the 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> is applicable separately for each occurrence involving a loss of circulation. Furthermore, verification of the functioning of the alternate method must be reconfirmed every 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> thereafter. This will provide assurance of continued temperature monitoring capability.

During the period when the reactor coolant is being circulated by an alternate method (other than by the required RHR shutdown cooling subsystem or recirculation pump), the reactor coolant temperature and pressure must be periodically monitored to ensure proper function of the alternate method. The once per hour Completion Time is deemed appropriate.

SURVEILLANCE SR 3.4.9.1 REQUIREMENTS This Surveillance verifies that one RHR shutdown cooling subsystem or recirculation pump is in operation and circulating reactor coolant. The required flow rate is determined by the flow rate necessary to provide sufficient decay heat removal capability. The Surveillance Frequency is controlled under the Surveillance Frequency Control Program.

Columbia Generating Station B 3.4.9-4 Revision 120

        

GO2-22-042 Attachment 3 Page 4 of 4 Insert 1:

C.1 With both RHR shutdown cooling subsystems inoperable, an alternate method of decay heat removal must be provided in addition to that provided for the initial RHR shutdown cooling subsystem inoperability. This re-establishes backup decay heat removal capabilities, similar to the requirements of the LCO. The 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> Completion Time is based on the decay heat removal function and the probability of a loss of the available decay heat removal capabilities. Furthermore, verification of the functional availability of these alternate method(s) must be reconfirmed every 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> thereafter. This will provide assurance of continued heat removal capability.

The required cooling capacity of the alternate method should be sufficient to maintain or reduce temperature. Decay heat removal by ambient losses can be considered as, or contributing to, the alternate method capability. Alternate methods that can be used include (but are not limited to) the Condensate and Main Steam Systems, the Reactor Water Cleanup System (by itself, or using feed and bleed in combination with the Control Rod Drive System or Condensate System), a combination of an ECCS pump and a safety/relief valve, or an inoperable but functional RHR shutdown cooling subsystem.

D.1 If the required alternate methods of decay heat removal cannot be verified within one hour, immediate action must be taken to restore at least one RHR shutdown cooling subsystem to OPERABLE status. The immediate Completion Time reflects the importance of restoring a method of heat removal.

Required Action D.1 is modified by a Note indicating that all required MODE changes to MODE 4 may be suspended until one RHR shutdown cooling subsystem is restored to OPERABLE status. In this case, LCO 3.0.3 and other Required Actions directing entry into MODE 4 could force the unit into a less safe condition in which there may be no adequate means to remove decay heat. It is more appropriate to allow the restoration of one of the RHR shutdown cooling subsystems before requiring entry into a condition in which that subsystem would be needed and exiting a condition where other sources of cooling are available. When at least one RHR subsystem is restored to OPERABLE status, the Completion Times of LCO 3.0.3 or other Required Actions resume at the point at which they were suspended.