Finding | |
---|---|
Title | Failure to Take Appropriate Maintenance Rule Corrective Actions for the 6.9 kV AC System |
Description | The inspectors identified a non-cited violation of 10 CFR Part 50.65(a)(1), for the failure to establish goals that provide reasonable assurance that the 6.9 kV electrical distribution system is capable of fulfilling its intended functions. Specifically, the 6.9 kV electrical distribution system had been in maintenance rule (a)(1) status since 2009 due to the failure of breakers to close on demand. Subsequently, in 2013 and 2015 there were additional breaker failures, which exceeded the established performance criteria, and were due to causes not previously evaluated. These additional failures were determined to be due to inadequate maintenance, but the licensee did not re-evaluate the established goals and revise the corrective actions to address these additional failures. The licensee implemented corrective actions to re-evaluate the goals and corrective actions for the 6.9 kV AC system. The licensee entered this issue into the corrective action program as Condition Report CR-2015-009077. The licensees failure to evaluate existing goals and corrective actions for a system that did not meet established performance goals was a performance deficiency. The performance deficiency was more than minor, and therefore a finding, because it affected the equipment performance attribute of the Mitigating Systems cornerstone and affected the cornerstone objective to ensure the availability, reliability, and capability of systems that respond to initiating events to prevent undesirable consequences. Specifically, the failure to take appropriate corrective actions adversely affected the reliability of a system scoped in the plant's maintenance rule program. Using Inspection Manual Chapter 0609, Appendix A, The Significance Determination Process (SDP) for Findings At-Power, Exhibit 2, Mitigating Systems Screening Questions, dated June 19, 2012, the finding was determined to be of very low safety significance (Green) because the finding: (1) was not a deficiency affecting the design and qualification of a mitigating structure, system, or component, and did not result in a loss of operability or functionality, (2) did not represent a loss of system and/or function, (3) did not represent an actual loss of function of at least a single train for longer than its allowed outage time, or two separate safety systems out-of-service for longer than their technical specification allowed outage time, and (4) does not represent an actual loss of function of one or more non-technical specification trains of equipment designated as high safety-significant for greater than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> in accordance with the licensees maintenance rule program. The finding has a human performance cross-cutting aspect associated with procedure adherence, in that, the licensee failed to follow maintenance rule implementing procedures. [H.8]. |
Site: | Comanche Peak |
---|---|
Report | IR 05000445/2015005 Section 1R12 |
Date counted | Dec 31, 2015 (2015Q4) |
Type: | NCV: Green |
cornerstone | Mitigating Systems |
Identified by: | NRC identified |
Inspection Procedure: | IP 71111.12 |
Inspectors (proximate) | G George G Guerra J Choate J Groom J Josey J Tice J Watkins M Chambers P Hernandez R Kumana |
Violation of: | 10 CFR 50.65(a)(1) Technical Specification - Procedures 10 CFR 50.65 Technical Specification |
CCA | H.8, Procedure Adherence |
INPO aspect | WP.4 |
' | |