05000445/FIN-2015008-04
From kanterella
Jump to navigation
Jump to search
Finding | |
|---|---|
| Title | Failure to Maintain Adequate Controls for Design Calculations |
| Description | The team identified a non-cited violation of 10 CFR Part 50, Appendix B, Criterion III, Design Control, with two examples associated with the licensees failure to ensure that design changes were subject to design control measures commensurate with those applied to the original design and were approved by the designated responsible organization. Specifically: (1) The licensee instituted an engineering change package to modify the design and setpoints for the station service water (SSW) system vacuum breaker valves (CP1/2-SWVAVB-01/02/03/04) and did not consider the allowable tolerance for the setpoint for all design basis events and operating conditions. The licensee adequately addressed this issue by reperforming the calculation incorporating the setpoint allowable tolerance. (2) The licensee failed to account for system design leakage in design calculation DBD-CS-096, for the safe shutdown impoundment minimum level. The licensee evaluated the water loss from the impoundment due to evaporation, but failed to account for losses due to system design leakage. The licensee adequately addressed this issue by applying the design system leak rate for a 30-day mission time to the available water in the safe shutdown impoundment. The licensees failure to evaluate properly the effects of modifying the setpoint including allowable tolerances for all modes of operation and all sources of water loss from the safe shutdown impoundment was a performance deficiency. The performance deficiency was more than minor, and therefore a finding, because it was associated with the configuration control attribute of the Mitigating Systems Cornerstone, and affected the cornerstone objective to ensure the availability, reliability, and capability of systems that respond to initiating events to prevent undesirable consequences. Using Inspection Manual Chapter 0609, Appendix A, The Significance Determination Process (SDP) for Findings AtPower, Exhibit 2, Mitigating Systems Screening Questions, dated June 19, 2012, the team determined that the finding is of very low safety significance (Green) because (1) the finding was not a deficiency affecting the design or qualification of a mitigating system; (2) the finding did not represent a loss of system and/or function; (3) the finding did not represent an actual loss of function of a single train for greater than its technical specification allowed outage time; and (4) the finding does not represent an actual loss of function of one or more non-technical specification trains of equipment designated as high safety-significant in accordance with the licensees maintenance rule program for greater than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. The inspectors determined that this finding does not have a cross-cutting aspect because the most significant contributor of this finding occurred more than three years ago and does not reflect current licensee performance. |
| Site: | Comanche Peak |
|---|---|
| Report | IR 05000445/2015008 Section 4OA2 |
| Date counted | Sep 30, 2015 (2015Q3) |
| Type: | NCV: Green |
| cornerstone | Mitigating Systems |
| Identified by: | NRC identified |
| Inspection Procedure: | IP 71152 |
| Inspectors (proximate) | C Alldredge E Ruesch H Freeman J Drake J Josey |
| Violation of: | 10 CFR 50 Appendix B Criterion III, Design Control Technical Specification |
| INPO aspect | |
| ' | |
Finding - Comanche Peak - IR 05000445/2015008 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|