Title | Failure to Adequately Assess Risk and Implement Risk Management Actions for Proposed Maintenance |
Description | The inspectors identified a non-cited violation of 10 CFR 50.65(a)(4), Requirements for Monitoring the Effectiveness of Maintenance at Nuclear Power Plants, for the licensees failure to adequately assess risk and implement required risk management actions for a planned maintenance activity. Specifically, the licensee failed to evaluate the risk associated with the use of a non-seismically qualified crane when moving loads over an operable train of service water during installation of a temporary modification in 2014. This issue did not represent an immediate safety concern because, at the time of identification, the maintenance activity was no longer in progress. The licensee entered this issue into the corrective action program for resolution as Condition Report CR-2015-001203. The failure to adequately assess the risk and implement required risk management actions for proposed maintenance activities was a performance deficiency. This performance deficiency was more than minor, and therefore a finding, because it was associated with the equipment performance attribute of the Mitigating Systems Cornerstone and affected the associated objective to ensure availability, reliability, and capability of systems that respond to initiating events to prevent undesirable consequences. Using Inspection Manual Chapter 0609, Appendix K, Maintenance Risk Assessment and Risk Management Significance Determination Process, dated May 19, 2005, Flowchart 2, Assessment of Risk Management Actions, the inspectors determined the need to calculate the risk deficit to determine the significance of this issue. Based on a review of the licensees risk model it was determined that the incremental core damage probability associated with this finding was less than 1 x 10-6; therefore, this finding is determined to have very low safety significance (Green). The finding has a human performance cross-cutting aspect associated with consistent processes because the licensee failed to use a consistent, systematic approach to evaluate risk for planned maintenance activities [H.13] |
Site: | Comanche Peak |
---|---|
Report | IR 05000445/2015002 Section 1R13 |
Date counted | Jun 30, 2015 (2015Q2) |
Type: | NCV: Green |
cornerstone | Mitigating Systems |
Identified by: | NRC identified |
Inspection Procedure: | IP 71111.13 |
Inspectors (proximate) | C Cowdrey E Schrader G Guerra J Josey J Kirkland J Larsen M Bloodgood M Williams P Elkmann R Kumana T Farina T Hipschman |
Violation of: | 10 CFR 50.65(a)(4) 10 CFR 50.65 |
CCA | H.13, Consistent Process |
INPO aspect | DM.1 |
' | |
Finding - Comanche Peak - IR 05000445/2015002 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|