05000373/FIN-2018003-03 | LaSalle | Constellation | 2018Q3 | Failure to Establish Goals to Monitor Steam Tunnel Check Dampers | Green | IP 71111.12 | |
05000298/FIN-2017010-04 | Cooper | Entergy | 2017Q2 | Failure to Monitor No. 2 Diesel Generator under 50.65(a)(1) due to Inadequate Maintenance Rule Evaluation | Green | IP 71152, Problem Identification and Resolution (PI&R) | Significance Determination Process Maintenance Rule Program |
05000293/FIN-2016011-08 | Pilgrim | Holtec | 2017Q1 | Failure to Adequately Monitor the Performance of Maintenance Rule Scoped Components | Green | IP 95003 | Significance Determination Process |
05000348/FIN-2017001-04 | Farley | Southern Nuclear | 2017Q1 | Licensee-Identified Violation | Green | | |
05000348/FIN-2017001-03 | Farley | Southern Nuclear | 2017Q1 | Licensee-Identified Violation | Green | | |
05000352/FIN-2016004-01 | Limerick | Constellation | 2016Q4 | Failure to Demonstrate Effective Preventive Maintenance Under 50.65(a)(2) for the Instrument Air System | Green | IP 71111.12 | |
05000293/FIN-2016003-01 | Pilgrim | | 2016Q3 | Process Radiation Monitor Subsystems 10 CFR 50.65(a)(2) Not Met | Green | IP 71111.12 | Significance Determination Process |
05000338/FIN-2016002-03 | North Anna | Dominion | 2016Q2 | Licensee-Identified Violation | Green | | |
05000255/FIN-2015004-05 | Palisades | Entergy | 2015Q4 | Licensee-Identified Violation | Green | | Mission time Probabilistic Risk Assessment Foreign Material Exclusion Maintenance Rule Program Overspeed trip Overspeed |
05000331/FIN-2015004-01 | Duane Arnold | NextEra Energy | 2015Q4 | Failure to Scope Safety Related and Nonsafety Related Breaker Into the Maintenance Rule | Green | IP 71111.12 | Maintenance Rule Program |
05000334/FIN-2015004-01 | Beaver Valley | Vistra | 2015Q4 | Inadequate Maintenance Rule Monitoring of the Auxiliary Feedwater System | Green | IP 71111.12 | Maintenance Rule Program |
05000272/FIN-2015004-02 | Salem | PSEG | 2015Q4 | Inadequate Maintenance Effectiveness of Control Room Ventilation Radiation Monitors | Green | IP 71111.12 | |
05000445/FIN-2015005-02 | Comanche Peak | Luminant | 2015Q4 | Failure to Take Appropriate Maintenance Rule Corrective Actions for the 6.9 kV AC System | Green | IP 71111.12 | Significance Determination Process Maintenance Rule Program |
05000272/FIN-2015009-01 | Salem | | 2015Q3 | Licensee-Identified Violation | Green | | |
05000445/FIN-2015003-01 | Comanche Peak | Luminant | 2015Q3 | Failure to Take Appropriate Maintenance Rule Corrective Actions for the Instrument Air System | Green | IP 71111.12 | Significance Determination Process Maintenance Rule Program |
05000293/FIN-2015003-01 | Pilgrim | | 2015Q3 | Main Control Room Annunciators 10 CFR 50.65(a)(2) Not Met | Green | IP 71111.12 | Significance Determination Process |
05000220/FIN-2015009-02 | Nine Mile Point | Constellation | 2015Q3 | Inadequate Maintenance Rule Monitoring of Unit 1 600 VAC Breaker Super System | Green | IP 71152, Problem Identification and Resolution (PI&R) | Significance Determination Process Maintenance Rule Program |
05000255/FIN-2015002-01 | Palisades | | 2015Q2 | Failure to Take Appropriate Corrective Action for the Charging System While in Maintenance Rule (a)(1) Status | Green | IP 71111.12 | Significance Determination Process |
05000250/FIN-2015007-01 | Turkey Point | NextEra Energy | 2015Q1 | Failure to Establish a Reasonable Maintenance Effectiveness Demonstration for the Unit 3 Containment Atmospheric Temperature System Used in EOPs | Green | IP 71111.17 | Maintenance Rule Program |
05000354/FIN-2015008-03 | Hope Creek | PSEG | 2015Q1 | Failure to Monitor the Reactor Manual Control System under 50.65(a)(1) due to Inadequate Maintenance Rule Functional Failure Evaluations | Green | IP 71152, Problem Identification and Resolution (PI&R) | Significance Determination Process Maintenance Rule Program |
05000423/FIN-2014005-01 | Millstone | Dominion | 2014Q4 | Failure to Review Additional Failures Against the SLCRS (a)(1) Monitoring Plan | Green | IP 71111.12 | Significance Determination Process |
05000285/FIN-2014005-01 | Fort Calhoun | Omaha Public Power District | 2014Q4 | Failure to establish Appropriate Preventive Maintenance and Failure to Identify Raw Water SSC Maintenance Rule Performance Criteria Exceeded and thereby establish Monitoring Requirements for the SSC | Green | IP 71111.12 | Significance Determination Process Maintenance Rule Program |
05000317/FIN-2014005-01 | Calvert Cliffs | Constellation | 2014Q4 | Spent Fuel Pool Cask Handling Crane 10 CFR 50.65(a)(2) Performance Not Met | Green | IP 71111.12 | Significance Determination Process Fuel cladding |
05000445/FIN-2014004-01 | Comanche Peak | | 2014Q3 | Failure to Establish Goals and Monitor the Performance of the Uninterruptible Power Supply Air Conditioning System | Green | IP 71111.12 | |
05000458/FIN-2014004-03 | River Bend | Entergy | 2014Q3 | Licensee-Identified Violation | Green | | |
05000335/FIN-2014004-02 | Saint Lucie | NextEra Energy | 2014Q3 | Failure to Establish a Reasonable Maintenance Effectiveness Demonstration for the ECCS Floor Drain Valve System | Green | IP 71111.12 | Significance Determination Process |
05000237/FIN-2014003-01 | Dresden | Constellation | 2014Q2 | Failure to Take Appropriate Corrective Action When a Maintenance Rule Performance Goal for the Standby Coolant System was Not Met | Green | IP 71111.12 | Significance Determination Process Maintenance Rule Program |
05000341/FIN-2014002-01 | Fermi | DTE Energy | 2014Q1 | Failure to Perform Appropriate Preventive Maintenance on Reactor Building Heating, Ventilation, and Air Conditioning Components | Green | IP 71111.12 | |
05000313/FIN-2013012-03 | Arkansas Nuclear | Entergy | 2014Q1 | Failure to Scope Required Components in the Stations Maintenance Rule Monitoring Program | Green | IP 71153, Event Followup | Internal Flooding Significance Determination Process |
05000271/FIN-2014002-01 | Vermont Yankee | NorthStar Vermont Yankee | 2014Q1 | Failure to Monitor the Unavailability of the Fire Water to Service Water Crosstie | Green | IP 71111.12 | Significance Determination Process |
05000272/FIN-2014002-05 | Salem | | 2014Q1 | Failure to establish appropriate MR performance goals | Green | IP 71152, Problem Identification and Resolution (PI&R) | Safe Shutdown Significance Determination Process |
05000298/FIN-2013005-05 | Cooper | | 2013Q4 | Licensee-Identified Violation | Green | | Significance Determination Process |
05000261/FIN-2013004-01 | Robinson | Duke Energy | 2013Q3 | Lack of Preventive Maintenance Results in B EDG Recirculation Damper Failure | Green | IP 71111.12 | Maintenance Rule Program |
05000445/FIN-2013004-02 | Comanche Peak | | 2013Q3 | Failure to Establish Goals and Monitor the Performance of the Auxiliary Feedwater System | Green | IP 71111.12 | Significance Determination Process |
05000445/FIN-2013007-03 | Comanche Peak | | 2013Q2 | Failure To Establish 10 CFR 50.65(a)(1) Performance Goals for the APDGs | Green | IP 71111.21 | Significance Determination Process |
05000458/FIN-2013002-01 | River Bend | | 2013Q1 | Failure to Monitor the Performance of the Floor and Equipment Drains System | Green | IP 71111.12 | Significance Determination Process Maintenance Rule Program |