Title | Failure to Barricade High Radiation Areas |
Description | The inspector identified a non-cited violation (NCV) of Technical Specification 5.7.1.a, with two examples, associated with not barricading High Radiation Areas (HRAs) with dose rates not exceeding 1.0 rem/hour at 30 centimeters from the radiation source. Specifically, access to the HRA containment trashracks and access to the HRA reactor cavity before flood up were not barricaded to prevent entry. The licensee took immediate corrective action to barricade the associated HRAs to restrict access and entered this issue into the corrective action program as CR-2015-009095 and CR-2015-009303. The failure to barricade high radiation areas in accordance with TS 5.7.1.a was a performance deficiency. The inspector determined that the performance deficiency was more than minor, and therefore a finding, because it impacted the program and process attribute of the Occupational Radiation Safety Cornerstone and adversely affected the cornerstone objective to ensure adequate protection of worker health and safety from exposure to radiation from radioactive material during routine civilian nuclear reactor operation. Specifically, not barricading HRAs could lead to inadvertent worker entry into high dose rate areas without knowledge of the radiological conditions. The finding was assessed using IMC 0609, Appendix C, Occupational Radiation Safety Significance Determination Process, dated August 19, 2008, and was determined to be of very low safety significance (Green) because the problem was not an ALARA planning issue; there was no overexposure, nor substantial potential for an overexposure; and the licensees ability to assess dose was not compromised. The finding was associated with a crosscutting aspect of Resolution in Problem Identification and Resolution area. Specifically, the organizations corrective actions to address HRA issues raised by Nuclear Oversight, the NRC and independent assessments in a timely manner commensurate with their safety significance have not been effective [P.3]. |
Site: | Comanche Peak |
---|---|
Report | IR 05000445/2015005 Section 2RS1 |
Date counted | Dec 31, 2015 (2015Q4) |
Type: | NCV: Green |
cornerstone | Or Safety |
Identified by: | NRC identified |
Inspection Procedure: | IP 71124.01 |
Inspectors (proximate) | G George G Guerra J Choate J Groom J Josey J Tice J Watkins M Chambers P Hernandez R Kumana |
Violation of: | Technical Specification |
CCA | P.3, Resolution |
INPO aspect | PI.3 |
' | |
Finding - Comanche Peak - IR 05000445/2015005 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Finding List (Comanche Peak) @ 2015Q4