| Title | Failure to Evaluate Inverter Fault Interrupting Capability During Design Basis Loss of Offsite Power and Seismic Conditions |
| Description | The team identified a Green, non-cited violation of 10 CFR Part 50, Appendix B, Criterion III, Design Control, which states, in part, Measures shall be established to assure that applicable regulatory requirements and the design basis, for those structures, systems, and components to which this appendix applies are correctly translated into specifications, drawings, procedures, and instructions. The design control measures shall provide for verifying or checking the adequacy of design, such as by the performance of design reviews, by the use of alternate or simplified calculational methods, or by the performance of a suitable testing program. Specifically, prior to June 18, 2015, the licensee failed to check the adequacy of the design by performing an analysis or test that demonstrated that the Class 1E inverters would continue to operate reliably when subjected to the effects of electrical faults that could be postulated to occur at non-Class loads, due to a lack of seismic qualification of the loads, during and after a design basis loss-of-offsite power and seismic event. In response to this issue, the licensee performed an analysis of the condition and an operability determination, and concluded, upon their review of all non-1E loads connected to 1E inverters, that the load protective devices would actuate in time to prevent a loss of function to the 1E loads. This finding was entered into the licensees corrective action program as Condition Report CR-2015-005530. The team determined that the failure to evaluate the fault clearing capability of the Class 1E inverters was a performance deficiency. This finding was more than minor because it was associated with the equipment performance attribute of the Mitigating Systems cornerstone and adversely affected the cornerstone objective to ensure the availability, reliability, and capability of systems that respond to initiating events to prevent undesirable consequences. Specifically, the licensee failed to evaluate the fault clearing capability of the inverter during design basis loss of offsite power and seismic conditions which resulted in a reasonable doubt on the operability of the system. In accordance with Inspection Manual Chapter 0609, Appendix A, The Significance Determination Process (SDP) for Findings At-Power, dated June 19, 2012, Exhibit 2, Mitigating Systems Screening Questions, the issue screened as having very low safety significance (Green) because it was a design or qualification deficiency that did not result in the loss of operability or functionality, did not represent an actual loss of safety function of the system or train; did not result in the loss of one or more trains of nontechnical specification equipment; and did not screen as potentially risk significant due to seismic, flooding, or severe weather. The team determined that this finding did not have a cross-cutting aspect because the most significant contributor did not reflect current licensee performance. |
| Site: | Comanche Peak |
|---|---|
| Report | IR 05000445/2015007 Section 1R21 |
| Date counted | Sep 30, 2015 (2015Q3) |
| Type: | NCV: Green |
| cornerstone | Mitigating Systems |
| Identified by: | NRC identified |
| Inspection Procedure: | IP 71111.21 |
| Inspectors (proximate) | C Baron C Smith J Watkins R Kopriva S Kobylarz T Farnholtz T Palmer |
| Violation of: | 10 CFR 50 Appendix B Criterion III, Design Control |
| INPO aspect | |
| ' | |