09-02-2016 | The Unit 2 Turbine Driven Auxiliary Feedwater ( TDAFW) pump auto-started upon a planned Reactor Trip at 0154 Eastern Daylight Time (EDT) on May 28, 2016. At 0157 EDT the Reactor Operator noted that TDAFW forward flow to Steam Generators 1 and 3 were approximately 800 gallons per minute, and placed the associated Level Control Valves in the closed position. At approximately 0203 EDT the Main Control Room received Alarm Window 60-A, TDAFW Pump Electrical Overspeed Trip. Operators walked down the TDAFW pump and determined that the turbine had tripped, by confirming that the Trip and Throttle Valve was no longer latched, and declared the TDAFWP inoperable. The equipment was repaired, the TDAFWP was re-tested successfully and returned to service. Technical Specification (TS) Limiting Condition for Operation 3.7.5 was exited on May 30, 2016.
The plant conditions at the time of the event were Unit 2 in Mode 3 at Normal Operating Temperature/Normal Operating Pressure following manual reactor trip from Mode 1. The reactor trip was unrelated to this event.
On June 29 2016, a past operability evaluation concluded that the TDAFWP had been inoperable from March 30 through May 30, 2016. This is reportable as a condition prohibited by TS. |
---|
|
---|
Category:Letter
MONTHYEARML23319A2452024-01-29029 January 2024 Issuance of Amendment Nos. 366 and 360; 164 and 71 Regarding the Adoption of TSTF-567, Revision 1, Add Containment Sump TS to Address GSI-191 Issues ML24008A2462024-01-18018 January 2024 Revision to the Reactor Vessel Material Surveillance Capsule Withdrawal Schedule CNL-24-017, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions2024-01-17017 January 2024 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions CNL-24-016, Supplement to Application to Modify the Technical Specification Surveillance Requirement 3.9.5.1 (WBN-TS-21-14)2024-01-10010 January 2024 Supplement to Application to Modify the Technical Specification Surveillance Requirement 3.9.5.1 (WBN-TS-21-14) CNL-23-052, Application to Adopt TSTF-427-A, Revision 2, Allowance for Non-Technical Specification Barrier Degradation on Supported System Operability2024-01-0909 January 2024 Application to Adopt TSTF-427-A, Revision 2, Allowance for Non-Technical Specification Barrier Degradation on Supported System Operability CNL-23-062, Application to Revise the Technical Specifications Section 3.8.2, AC Sources-Shutdown, to Remove Reference to the C-S Diesel Generator (WBN-TS-23-018)2024-01-0808 January 2024 Application to Revise the Technical Specifications Section 3.8.2, AC Sources-Shutdown, to Remove Reference to the C-S Diesel Generator (WBN-TS-23-018) ML23346A1382024-01-0303 January 2024 Regulatory Audit Summary Related to Request to Increase the Number of Tritium Producing Burnable Absorber Rods CNL-23-069, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-21021 December 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation IR 05000390/20234412023-12-21021 December 2023 Plantfinal Significance Determination for a Security-Related Greater than Green Finding, Nov, and Assessment Follow-up, 05000390-2023441 and 05000391-2023441-Public CNL-23-036, Application to Revise Function 5 of Technical Specification Table 3.3.2-1, Engineered Safety Feature Actuation System Instrumentation, for the Sequoyah Nuclear Plant and Watts Bar Nuclear Plant (SQN-TS-23-02 and WBN-TS-23-08)2023-12-18018 December 2023 Application to Revise Function 5 of Technical Specification Table 3.3.2-1, Engineered Safety Feature Actuation System Instrumentation, for the Sequoyah Nuclear Plant and Watts Bar Nuclear Plant (SQN-TS-23-02 and WBN-TS-23-08) IR 05000390/20234042023-12-14014 December 2023 Security Baseline Inspection Report 05000390/2023404 and 05000391/2023404 CNL-23-001, Rebaseline of Sections 3.1 and 3.2 of the Technical Specifications (WBN-TS-23-01)2023-12-13013 December 2023 Rebaseline of Sections 3.1 and 3.2 of the Technical Specifications (WBN-TS-23-01) ML23293A0572023-12-0606 December 2023 Issuance of Amendment Nos. 163 and 70 Regarding Adoption of TSTF-501-A, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control IR 05000390/20230102023-11-30030 November 2023 RE-Issue Watts Bar Nuclear Plant - Biennial Problem Identification and Resolution Inspection Report 050000390/2023010 and 05000391/2023010 and Apparent Violation CNL-23-067, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2023-11-27027 November 2023 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions IR 05000390/20230032023-11-13013 November 2023 Integrated Inspection Report 05000390/2023003 and 05000391/2023003 and Apparent Violation ML23312A1432023-11-0808 November 2023 Submittal of Dual Unit Updated Final Safety Analysis Report (UFSAR) Amendment 5 CNL-23-059, Supplement to Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-2023-09-20020 September 2023 Supplement to Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-03 CNL-23-061, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revision2023-09-20020 September 2023 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revision ML23251A2002023-09-11011 September 2023 Request for Withholding Information from Public Disclosure for Watts Bar Nuclear Plant, Units 1 and 2 CNL-23-057, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions. Includes CECC-EPIP-1, Revision 76 and CECC-EPIP-9, Revision 642023-09-0505 September 2023 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions. Includes CECC-EPIP-1, Revision 76 and CECC-EPIP-9, Revision 64 IR 05000390/20230052023-08-30030 August 2023 Updated Inspection Plan for Watts Bar Nuclear Plant, Units 1 and 2 - Report 05000390/2023005 and 05000391/2023005 ML23233A0042023-08-28028 August 2023 Proposed Alternative to the Requirements of the ASME Boiler and Pressure Vessel Code for Upper Head Injection Dissimilar Metal Butt Welds IR 05000390/20230022023-08-16016 August 2023 Reissue - Watts Bar Nuclear Plant - Integrated Inspection Report 05000390/2023002 and 05000391/2023002 ML23220A1582023-08-0909 August 2023 Integrated Inspection Report 05000390/2023002 and 05000391/2023002 CNL-23-045, License Amendment Request to Revise Technical Specification Table 1.1-1 Regarding the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Bolts (WBN-TS-23-010)2023-08-0707 August 2023 License Amendment Request to Revise Technical Specification Table 1.1-1 Regarding the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Bolts (WBN-TS-23-010) CNL-23-028, Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-03 and WBN-TS-23-06)2023-08-0202 August 2023 Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-03 and WBN-TS-23-06) ML23192A4472023-07-31031 July 2023 Staff Assessment of Updated Seismic Hazards at TVA Sites Following the NRC Process for the Ongoing Assessment of Natural Hazards Information CNL-23-055, Tennessee Valley Authority - Emergency Preparedness Department Procedure Revision. Includes EPDP-3, Revision 3, Emergency Plan Exercises and Preparedness Drills2023-07-25025 July 2023 Tennessee Valley Authority - Emergency Preparedness Department Procedure Revision. Includes EPDP-3, Revision 3, Emergency Plan Exercises and Preparedness Drills IR 05000390/20230112023-07-24024 July 2023 Quadrennial Focused Engineering Inspection (FEI) Commercial Grade Dedication Report 05000390 2023011 and 05000391 2023011 CNL-23-053, Tennessee Valley Authority - Radiological Emergency Plan Revisions2023-07-18018 July 2023 Tennessee Valley Authority - Radiological Emergency Plan Revisions CNL-23-020, Application to Revise Technical Specifications to Adopt TSTF-501-A, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control (WBN-TS-22-06)2023-06-28028 June 2023 Application to Revise Technical Specifications to Adopt TSTF-501-A, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control (WBN-TS-22-06) CNL-23-049, Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan .2023-06-26026 June 2023 Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan . ML23122A2322023-06-0707 June 2023 Issuance of Amendment Nos. 162 and 69 Regarding Change to Date in Footnotes for Technical Specification 3.7.11, Control Room Emergency Air Temperature Control System (Creatcs) CNL-23-044, Transmittal of Revision 3 to WCAP-18774-P and WCAP-18774-NP, Addendum to the Rotterdam Dockyard Company Final Stress Report for 173 P.W.R. Vessels TVA III & IV (Report No. 30749-B-030, Rev. 3) - Evaluation of One Closure Stud Out2023-06-0101 June 2023 Transmittal of Revision 3 to WCAP-18774-P and WCAP-18774-NP, Addendum to the Rotterdam Dockyard Company Final Stress Report for 173 P.W.R. Vessels TVA III & IV (Report No. 30749-B-030, Rev. 3) - Evaluation of One Closure Stud Out IR 05000390/20234032023-05-30030 May 2023 Cyber Security Inspection Report 05000390/2023403 and 05000391/2023403 ML23131A1812023-05-23023 May 2023 Correction to Amendment No. 161 to Facility Operating License No. NPF-90 CNL-23-042, Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2023-05-16016 May 2023 Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions IR 05000390/20220032023-05-0909 May 2023 Reissue Watts Bar Nuclear Plant - Integrated Inspection Report 05000390/2022003 and 05000391/2022003 ML23125A2202023-05-0505 May 2023 Issuance of Amendment No. 161 Regarding a Change to Footnotes for Technical Specification Table 1.1-1 Modes (Emergency Circumstances) IR 05000390/20230012023-05-0404 May 2023 Integrated Inspection Report 05000390/2023001 and 05000391/2023001 CNL-23-043, Emergency License Amendment Request to Relax the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs in Technical Specification Table 1.1-1, Modes (WBN-TS-23-09)2023-05-0404 May 2023 Emergency License Amendment Request to Relax the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs in Technical Specification Table 1.1-1, Modes (WBN-TS-23-09) CNL-23-032, Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 412023-04-27027 April 2023 Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 41 CNL-23-030, Tennessee Valley Authority - Hydrologic Engineering Center River Analysis System Project Milestone Status Update2023-04-27027 April 2023 Tennessee Valley Authority - Hydrologic Engineering Center River Analysis System Project Milestone Status Update CNL-23-033, Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revision2023-04-24024 April 2023 Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revision CNL-23-029, Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2023-04-11011 April 2023 Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions ML23072A0652023-04-0505 April 2023 Units 1 and 2 Issuance of Amendment Nos. 364 and 358; 160 and 68 Regarding a Revision to Technical Specification 3.4.12 ML23073A2762023-04-0303 April 2023 Individual Notice of Consideration of Issuance of Amendments to Facility Operating Licenses, Proposed No Significant Hazards Consideration Determination, and Opportunity for a Hearing (EPID L-2023-LLA-0029) (Letter) CNL-23-023, Annual Insurance Status Report2023-03-30030 March 2023 Annual Insurance Status Report CNL-23-024, TVA Guarantee of Payment of Deferred Premiums - 2022 Annual Report2023-03-29029 March 2023 TVA Guarantee of Payment of Deferred Premiums - 2022 Annual Report 2024-01-09
[Table view] Category:Licensee Event Report (LER)
MONTHYEAR05000391/LER-2017-0052018-01-25025 January 2018 Unplanned Emergency Core Cooling System Injection into the Reactor Coolant System due to Personnel Error, LER 17-005-00 for Watts Bar, Unit 2, Regarding Unplanned Emergency Core Cooling System Injection into the Reactor Coolant System due to Personnel Error 05000390/LER-2017-0152018-01-0808 January 2018 Failure to Enter Limiting Condition of Operation Action Statement Results in a Condition Prohibited by Technical Specifications, LER 17-015-00 for Watts Bar, Units 1 and 2, Regarding Failure to Enter Limiting Condition of Operation Action Statement Results in a Condition Prohibited by Technical Specifications 05000390/LER-2017-0142017-12-20020 December 2017 Main Control Room Boundary Door Left Open Leading to a Loss of Safety Function, LER 17-014-00 for Watts Bar, Unit 1, Regarding Main Control Room Boundary Door Left Open Leading to a Loss of Safety Function 05000390/LER-2017-0122017-10-23023 October 2017 Error in Plant Emergency Procedures Leads to a Condition Prohibited by the Technical Specifications, LER 17-012-00 for Watts Bar, Unit 1, Regarding Error in Plant Emergency Procedures Leads to a Condition Prohibited by the Technical Specifications 05000390/LER-2017-0112017-10-23023 October 2017 Failure to Enter Technical Specification 3.6.3 for Containment Isolation Valve, LER 17-011-00 for Watts Bar, Unit 1, Regarding Failure to Enter Technical Specification 3.6.3 for Containment lsolation Valve 05000390/LER-2017-0102017-10-10010 October 2017 Actuation of Turbine Driven Auxiliary Feedwater Pump Due to Loss of 6.9kV Shutdown Board, LER 17-010-00 for Watts Bar Nuclear Plant, Unit 1 Regarding Actuation of Turbine Driven Auxiliary Feedwater Pump Due to Loss of 6.9kV Shutdown Board 05000391/LER-2017-0042017-09-25025 September 2017 Manual Reactor Trip Due to Inoperable Rod Position Indication, LER 17-004-00 for Watts Bar Nuclear Plant, Unit 2 Regarding Manual Reactor Trip Due to Inoperable Rod Position Indication 05000390/LER-2017-0042017-08-31031 August 2017 Manual Reactor Trips Due to Failed Reactor Coolant Pump Power Transfer During Plant Startup, LER 17-004-01 for Watts Bar, Unit 1, Regarding Manual Reactor Trips Due to Failed Reactor Coolant Pump Power Transfer During Plant Startup 05000390/LER-2017-0082017-08-14014 August 2017 Shield Building Inoperability and Potential Loss of Safety Function Resulting from Spurious Equipment Operation, LER 17-008-00 for Watts Bar, Unit 1, Regarding Shield Building Inoperability and Potential Loss of Safety Function Resulting from Spurious Equipment Operation 05000390/LER-2017-0072017-08-0808 August 2017 Multiple Unreported Potential Loss of Safety Function Events Associated with Inoperable Single Train Systems Due to Misinterpretation of Reporting Guidance, LER 17-007-00 for Watts Bar, Unit 1, Regarding Multiple Unreported Potential Loss of Safety Function Events Associated with Inoperable Single Train Systems Due to Misinterpretation of Reporting Guidance 05000390/LER-2017-0062017-07-31031 July 2017 Structural Degradation of 161 kV Line Pole Leads to a Condition Prohibited by Technical Specifications, LER 17-006-00 for Watts Bar, Unit 1, Regarding Structural Degradation of 161 kV Line Pole Leads to a Condition Prohibited by Technical Specifications 05000390/LER-2017-0052017-07-10010 July 2017 Isolation of the 1 B-B Safety Injection Pump Leads to Condition Prohibited by Technical Specifications, LER 17-005-00 for Watts Bar re Isolation of the 1B-B Safety Injection Pump Leads to a Condition Prohibited by Technical Specifications 05000391/LER-2017-0032017-05-22022 May 2017 Automatic Start of Auxiliary Feedwater System Due to Main Condenser Failure, LER 17-003-00 for Watts Bar, Unit 2, Regarding Automatic Start of Auxiliary Feedwater System Due to Main Condenser Failure 05000391/LER-2017-0022017-05-12012 May 2017 Manual Reactor Trip as a Result of a Secondary Plant Transient, LER 17-002-00 for Watts Bar, Unit 2, Regarding Manual Reactor Trip as a Result of a Secondary Plant Transient 05000391/LER-2017-0012017-05-0303 May 2017 Containment Airlock Function Lost Due to Equalizing Valve Not Closing, LER 17-001-00 for Watts Bar, Unit 2, Regarding Containment Airlock Function Lost Due to Equalizing Valve Not Closing 05000390/LER-2017-0032017-03-0303 March 2017 Inadequate Operability Determination Leads to a Condition Prohibited by the Technical Specifications, LER 17-003-00 for Watts Bar, Unit 1, Regarding Inadequate Operability Determination Leads to a Condition Prohibited by the Technical Specifications 05000390/LER-2017-0022017-02-22022 February 2017 Incorrectly Hung Clearance Leads to a Condition Prohibited by the Technical Specifications, LER 17-002-00 for Watts Bar Nuclear Plant, Unit 1, Regarding: Incorrectly Hung Clearance Leads to a Condition Prohibited by the Technical Specifications 05000390/LER-2016-0112016-12-0909 December 2016 Loss of Centrifugal Charging Pump Due to Repeat Failure of Associated Room Cooler, LER 16-011-01 for Watts Bar Nuclear Plant, Unit 1 Regarding Loss of Centrifugal Charging Pump Due to Repeat Failure of Associated Room Cooler 05000391/LER-2016-0082016-10-28028 October 2016 Reactor Trip Resulting from Failure of 2B Main Bank Transformer, LER 16-008-00 for Watts Bar, Unit 2, Regarding Reactor Trip Resulting from Failure of 2B Main Bank Transformer 05000391/LER-2016-0052016-08-19019 August 2016 Main Feedwater Pump Trip on Loss of Condenser Vacuum Leads to Turbine Trip and Reactor Trip, LER 16-005-00 for Watts Bar, Unit 2, Regarding Main Feedwater Pump Trip on Loss of Condenser Vacuum Leads to Turbine Trip and Reactor Trip 05000390/LER-2016-0102016-08-0808 August 2016 Emergency Diesel Generator Crankcase Pressure Switches Not Analyzed to Withstand the Effects of a Tornado, LER-16-010-00 for Watts Bar Nuclear Plant, Units 1 and 2 Regarding Emergency Diesel Generator Crankcase Pressure Switches Not Analyzed to Withstand the Effects of a Tornado 05000391/LER-2016-0042016-08-0404 August 2016 Reactor Trip and Safety Injection Actuation Caused by Turbine Governor Valve Failure, LER 16-004-00 for Watts Bar, Unit 2, Regarding Reactor Trip and Safety Injection Actuation Caused by Turbine Governor Valve Failure 05000391/LER-2016-0032016-07-27027 July 2016 Turbine Driven Auxiliary Feedwater Pump Inoperable for Longer than Allowable Outage Time due to Governor Valve Spring Over-Tensioning, LER 16-003-00 for Watts Bar, Unit 2, Regarding Turbine Driven Auxiliary Feedwater Pump lnoperable for Longer Than Allowable Outage Time Due to Governor Valve Spring Over-Tensioning 05000390/LER-2016-0082016-07-15015 July 2016 Emergency Diesel Generator Manual Start Due to Loss of Voltage on the 6.9kV Shutdown Board 1B-B, LER 16-008-00 for Watts Bar, Unit 1, Regarding Emergency Diesel Generator Manual Start Due to Loss of Voltage on the 6.9kV Shutdown Board 1B-B 05000390/LER-2016-0092016-07-15015 July 2016 Failure to Complete Surveillance Requirements Causes a Condition Prohibited by the Technical Specifications, LER 16-009-00 for Watts Bar, Unit 1, Regarding Failure to Complete Surveillance Requirements Causes Conditions Prohibited by the Technical Specifications 05000391/LER-2016-0022016-07-11011 July 2016 Turbine Driven Auxiliary Feedwater Pump Inoperable for Longer than Allowable Outage Time due to Turbine Speed Control Failure, LER 16-002-00 for Watts Bar, Unit 2, Regarding Turbine Driven Auxiliary Feedwater Pump Inoperable for Longer Than Allowable Outage Time Due to Turbine Speed Control Failure 05000390/LER-2016-0062016-06-30030 June 2016 Undersized Room Cooler Fan Shaft Results in Loss of Centrifugal Charging Pump, LER 16-006-00 for Watts Bar, Unit 1, Regarding Undersized Room Cooler Fan Shaft Results in Loss of Centrifugal Charging Pump 05000390/LER-2016-0072016-06-20020 June 2016 Technical Specification Action Not Met for Rod Position Indication, LER 16-007-00 for Watts Bar Nuclear Plant, Unit 1 Regarding Technical Specification Action Not Met for Rod Position Indication 05000391/LER-2016-0012016-06-13013 June 2016 Loss of Automatic Containment Isolation for the Steam Generator Blowdown Sampling Lines, LER 16-001-00 for Watts Bar, Unit 2, Regarding Loss of Automatic Containment Isolation for the Steam Generator Blowdown Sampling Lines 05000390/LER-2016-0042016-05-23023 May 2016 Automatic Reactor Trip Due to Actuation of Over Temperature Delta Temperature Bistables, LER 16-004-00 for Watts Bar, Unit 1, Regarding Automatic Reactor Trip Due to Actuation of Over Temperature Delta Temperature Bistables 05000390/LER-2016-0052016-05-13013 May 2016 Both Trains of Unit 1 Emergency Gas Treatment System Inoperable During Unit 2 Testing, LER 16-005-00 for Watts Bar, Unit 1, Regarding Both Trains of Unit 1, Emergency Gas Treatment System Inoperable During Unit 2, Testing 05000390/LER-2016-0032016-05-10010 May 2016 Technical Specification Surveillance Requirement Not Met During Emergency Core Cooling System Venting, LER 16-003-00 for Watts Bar, Unit 1, Regarding Technical Specification Surveillance Requirement Not Met During Emergency Core Cooling System Venting 05000390/LER-2016-0022016-05-0404 May 2016 Technical Specification Action Not Met for Inoperable Containment Isolation Valve, LER 16-002-00 for Watts Bar, Unit 1, Regarding Technical Specification Action Not Met for Inoperable Containment Isolation Valve 05000390/LER-2016-0012016-03-0909 March 2016 Channel Mode Switch in Incorrect Position Renders Lower Containment Atmosphere Particulate Radiation Monitor Inoperable, LER 16-001-00 for Watts Bar, Unit 1, Regarding Channel Mode Switch in Incorrect Position Renders Lower Containment Atmosphere Particulate Radiation Monitor Inoperable ML1134703432011-12-13013 December 2011 Withdrawal of License Event Report 390/2011-003, Mode Change Without Meeting Limiting Condition for Operation (LCO) 3.7.5 2018-01-08
[Table view] |
comments regarding burden estimate to the FOIA, Privacy and Information Collections Branch (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by internet e-mail to used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.
3. LER NUMBER
2016 - 01
I. PLANT OPERATING CONDITIONS BEFORE THE EVENT
Watts Bar Nuclear Plant (WBN) Unit 2 was in Mode 3 at Normal Operating Temperature/Normal Operating Pressure (NOP/NOT) following a planned manual reactor trip from Mode 1. The reactor trip was unrelated to this event.
II. DESCRIPTION OF EVENT
A. Event
The Unit 2 Turbine Driven Auxiliary Feedwater pump (TDAFWP) {EIIS:P} auto-started upon a planned Reactor Trip at 0154 hours0.00178 days <br />0.0428 hours <br />2.546296e-4 weeks <br />5.8597e-5 months <br /> EDT on May 28, 2016. At 0157 hours0.00182 days <br />0.0436 hours <br />2.595899e-4 weeks <br />5.97385e-5 months <br /> EDT the Reactor Operator noted that TDAFWP forward flow to Steam Generators (SGs) 1 and 3 were approximately 800 gallons per minute (gpm). To preclude the potential for SG overfill, the Reactor Operator placed the associated Level Control Valves (LCVs) {EIIS:LCV} in the closed position. At approximately 0203 EDT the Main Control Room (MCR) received Alarm Window 60-A, TDAFWP Electrical Overspeed Trip. Auxiliary Unit Operators (AU0s) walked down the TDAFWP and determined that the turbine had tripped, by confirming that the Trip and Throttle Valve (TN) {EIIS:V} was no longer latched. No other anomalies were identified.
Troubleshooting conducted on May 28, 2016 and May 29, 2016 identified that the Governor Valve (2-FCV-001-0052) stem spring {EIIS:SCV} was over tensioned. The Maintenance Instruction for tensioning the valve stem spring directs the technician to adjust spring compression with the valve fully closed to establish a gap of approximately 1/32 inch (0.031 inches) between coils to ensure coils do not bind. The as-found gap between the coils with the governor valve closed was 0.005 inches or essentially coil bound. This led to the Terry Turbine {EIIS:TRB} controls not being able to respond to the sudden reduction in forward flow to the SGs, resulting in an electrical overspeed trip at 110 percent rated speed.
B. Inoperable Structures, Components, or Systems that Contributed to the Event There were no additional structures, components or systems that contributed to this event.
C. Dates and Approximate Times of Occurrences Date Time (EDT) Event 03/30/16 2314 Entered Mode 3 with INOPERABLE TDAFWP 04/02/16 0629 Entered Mode 4 04/08/16 1244 Re-entered Mode 3 with INOPERABLE TDAFWP 04/17/16 0338 Entered Mode 4 for repairs to TDAFWP - steam leaks 05/01/16 1736 Re-entered Mode 3 with INOPERABLE TDAFWP 05/18/16 2358 Entered Mode 4 05/20/16 0415 Entered Mode 3 with INOPERABLE TDAFWP 05/23/16 0104 Entered Mode 2, WBN 2 Initial Critical 05/28/16 0154 Manual Reactor Trip due to steam leak 05/28/16 0154 TDAFWP auto start 05/28/16 —0203 TDAFWP trips on spurious overspeed when forward flow was comments regarding burden estimate to the FOIA, Privacy and Information Collections Branch (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by internet e-mail to used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.
3. LER NUMBER
2016 - 01 Date Time (EDT) Event terminated 05/30/16 0334 TDAFWP Surveillance completed successfully 06/29/16 Past OPERABILITY Evaluation determined TDAFWP was
INOPERABLE
D. Manufacturer and Model Number of Components that Failed The component failure was due to maintenance practices when the governor valve spring was over-tensioned.
E. Other Systems or Secondary Functions Affected
No other systems or functions were affected.
F. Method of discovery of each Component or System Failure or Procedural Error On May 28, 2016, at 0203 EDT the MCR received the TDAFWP Electrical Overspeed Trip alarm.
A subsequent walkdown by AUOs determined that the TDAFWP had tripped, by confirming that the TTV was no longer latched.
G. Failure Mode and Effect of Each Failed Component As noted in the Description of Event, an over-tensioned governor valve stem spring was discovered during troubleshooting following the overspeed trip of the TDAFWP. A review of Operations procedures did not reveal precautions or warnings to prevent Operators from placing the level control valves in the closed position to prevent potential SG overfill during a safety system actuation. As a result, the over tensioning of the Governor Valve stem spring would lead to the overspeed trip of the Terry Turbine anytime a sudden reduction in forward flow to the SGs were to occur. In accordance with the WBN Unit 2 Final Safety Analysis Report, failure of the TDAFWP from a mechanical failure or spurious control signal would be addressed through the operation of the 2A-A and 2B-B Motor Driven Auxiliary Feedwater Pump (MDAFWP) that provide auxiliary feedwater flow to all 4 Steam Generators.
H. Operator Actions
Due to the overspeed trip of TDAFWP the operators entered Technical Specification (TS) Limiting Condition for Operation (LCO) 3.7.5, Condition B, "One AFW train INOPERABLE in MODE 1, 2, or 3 for reasons other than Condition A.
I. Automatically and Manually Initiated Safety System Responses The condition described in this report did not result in any automatic or manual safety systems activation.
comments regarding burden estimate to the FOIA, Privacy and Information Collections Branch (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by internet e-mail to Infocollects:Resource@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs:
used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.
3. LER NUMBER
2016 - 01
III. CAUSE OF THE EVENT
A. The cause of each component or system failure or personnel error, if known.
The inability of the TDAFWP to continue operating following closure of the level control valves and subsequent electrical overspeed trip was the result of maintenance practices that incorrectly set the TDAFWP governor valve stem spring. A review of the governor valve work order history determined that the stem spring had likely been incorrectly set in November 2015.
B. The cause(s) and circumstances for each human performance related root cause.
Troubleshooting conducted on May 28, 2016 and May 29, 2016 identified that the governor valve stem spring was over tensioned. The Maintenance Instruction for tensioning the valve stem spring directs the technician to adjust spring compression with the valve fully closed to establish a gap of approximately 1/32 inch (0.031 inches) between coils to ensure coils do not bind. The as-found gap between the coils with the governor valve closed was 0.005 inches or essentially coil bound.
This led to the Terry Turbine controls not being able to respond to the sudden reduction in forward flow to the SGs, resulting in an electrical overspeed trip at 110 percent rated speed.
The procedure should have more clearly indicated the required "set up" of the spring and document an as left measurement for the spring. More detailed instructions were needed for setting the gap and an actual step recording the as-left gap measurement should have been incorporated.
IV. ANALYSIS OF THE EVENT
The Auxiliary Feedwater (AFW) system's {EllS:BA} function is to supply, in the event of a loss of the main feedwater supply, sufficient feedwater to the steam generators to remove primary system residual heat and core decay heat. It may also be required in some other circumstances such as the evacuation of the MCR, cooldown after a Loss of Coolant Accident (LOCA) for a small break, maintaining a water head in the steam generators following a LOCA, a flood above plant grade, Anticipated Transient Without Scram (ATWS) event, 10 CFR 50, Appendix R, Fires and to support normal cooldown.
The TDAFWP assembly along with the MDAFWP assemblies provide the motive pressure to ensure adequate flow gets to the steam generators for decay heat removal.
The Design Basis Events that establish AFW system safety function requirements are:
Loss of Normal Main Feedwater (LONF) (including Loss of Offsite Power) Main Feedline or Main Steamline Breaks (MFLB or MSLB) Loss of offsite power (LOOP) Large Break Loss of Coolant Accident (LOCA) Small Break Loss of Coolant Accident (SBLOCA) comments regarding burden estimate to the FOIA, Privacy and Information Collections Branch (7-5 F53), U S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by internet e-mail to used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.
3. LER NUMBER
2016 - 01 003 Technical Specification 3.7.5, AFW System requires all three trains of AFW to be OPERABLE in Modes 1, 2, and 3. Additionally, one train of AFW is required OPERABLE in Mode 4 when the Steam Generators are used for Heat Removal. With one of the required AFW trains (pump or flow path) INOPERABLE in MODE 1, 2, or 3 for reasons other than Condition A, action must be taken to restore to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />. This Condition includes the loss of two steam supply lines to the turbine driven AFW pump. The 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> Completion Time is reasonable, based on redundant capabilities afforded by the AFW System, time needed for repairs, and the low probability of a Design Basis Accident (DBA) occurring during this time period.
During the timeframe that the TDAFWP was INOPERABLE while in Modes 1, 2 and 3, both MDAFWPs were considered OPERABLE and capable of performing their design function. As a result, sufficient AFW system capability was available. Additionally, both MDAFWPs were in-service in Mode 3, during the time that the TDAFWP was INOPERABLE.
The MDAFWPs were considered OPERABLE and were in operation during the timeframe discussed above.
A re-evaluation of the 2A-A MDAFWP operability determination found no evidence to change the conclusion that the pump was OPERABLE.
V. ASSESSMENT OF SAFETY CONSEQUENCES
A. Availability of systems or components that could have performed the same function as the components and systems that failed during the event.
As discussed previously, during the timeframe that the TDAFWP was INOPERABLE while in Modes 1, 2 and 3, both MDAFWPs were OPERABLE and capable of performing their design function. As a result, sufficient AFW system capability was available. Both MDAFWPs were in- service in Mode 3, during the time that the TDAFWP was INOPERABLE.
B. For events that occurred when the reactor was shut down, availability of systems or components needed to shutdown the reactor and maintain safe shutdown conditions, remove residual heat, control the release of radioactive material, or mitigate the consequences of an accident Prior to 0104 EDT on May 23, 2016, Watts Bar Unit 2 had not achieved initial criticality. With the MDAFWPs in service and no decay heat on Unit 2, the ability to shut down the reactor and maintain a safe shutdown condition was not impacted. With no core decay heat, removal of residual heat is not an issue. With no irradiated fuel in the Unit 2 core, an uncontrolled release of radioactive material is not credible, The inoperability of the TDAFWP would not have adversely impacted the ability to mitigate the consequences of an accident.
A risk evaluation was performed for the period from initial criticality to the TDAFWP electrical overspeed trip. The evaluation conservatively used full power thermal-hydraulic analyses, as opposed to the actual residual heat estimate of 19 Megawatt Thermal provided by Nuclear Fuels group. The risk review showed that with an unavailability of seven days, the core damage frequency associated with the TDAFWP remained below 1E-6.
During the initiating event the turbine started, came to rated speed, and flowed forward to maintain SG levels. The electrical overspeed did not occur until the Operators closed the level control valves to SGs 1 and 3. If needed, the Trip and Throttle Valve (2-FCV-001-0051) could have been comments regarding burden estimate to the FOIA, Privacy and Information Collections Branch (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by internet e-mail to used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.
3. LER NUMBER
2016 - 01 003 reset from the MCR and the turbine restarted to maintain SG levels in accordance with the Feedwater and Main Steam Annunciator Response Instruction.
C. For failure that rendered a train of a safety system INOPERABLE, an estimate of the elapsed time from the discovery of the failure until the train was returned to service.
The following provides the window of TDAFWP unavailability for the timeframe Unit 2 was in Mode 3.
From March 30, 2016 through April 17, 2016. There were two windows of unavailability during this timeframe, one was 2 days, 7 hours8.101852e-5 days <br />0.00194 hours <br />1.157407e-5 weeks <br />2.6635e-6 months <br /> and 15 minutes and the second was 7 days, 14 hours1.62037e-4 days <br />0.00389 hours <br />2.314815e-5 weeks <br />5.327e-6 months <br /> and 54 minutes respectively for a total exposure time 9 days, 22 hours2.546296e-4 days <br />0.00611 hours <br />3.637566e-5 weeks <br />8.371e-6 months <br /> and 9 minutes. The unavailability window was exited on April 17, 2016, after successful completion of the TDAFWP surveillance test. Surveillance testing did not uncover the governor stem valve spring tension issue.
On May 1, 2016, at 1736 EDT Watts Bar Unit 2 again entered Mode 3. While not recognized, the TDAFWP was not OPERABLE at this time. On May 18, 2016 at 2358 EDT, Unit 2 was moved back to Mode 4. The time in Mode 3 for this window was 17 days, 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and 22 minutes.
Subsequently, on May 20, 2016 at 0415 EDT, Unit 2 reentered Mode 3 and remained there until entry into Mode 2 at 0104 EDT on May 23, 2016. This Mode 3 window lasted 2 days, 20 hours2.314815e-4 days <br />0.00556 hours <br />3.306878e-5 weeks <br />7.61e-6 months <br /> and 49 minutes.
As a result, the total TDAFWP unavailability time with Unit 2 in Mode 3 and prior to initial criticality was 30 days, 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> and 20 minutes.
Watts Bar Unit 2 entered Mode 2 (initial criticality) at 0104 EDT on May 23, 2016. Unit 2 remained critical until a manual reactor trip was initiated at 0154 EDT on May 28, 2016. The TDAFWP was restored to OPERABLE status at 0334 EDT on May 30, 2016. Based on the above, with the reactor critical the unavailability window was 7 days and 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> and 30 minutes.
VI. CORRECTIVE ACTIONS
This event was entered into the Tennessee Valley Authority Corrective Action Program and is being tracked under condition report (CR) 1175968.
A. Immediate Corrective Actions
The TDAFWP governor valve stem spring was reset to the appropriate acceptance criteria on May 29, 2016. The TDAFWP successfully completed TS surveillance requirements at 0334 EDT on May 30, 2016.
B. Corrective Actions to Prevent Recurrence
Revised the Maintenance Instruction to provide more detailed guidance for adjusting spring compression of governor valves and add blank to record the gap as-left measurement setting.
comments regarding burden estimate to the FOIA, Privacy and Information Collections Branch (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by internet e-mail to used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.
3. LER NUMBER
2016 - 01
VII. ADDITIONAL INFORMATION
A. Previous similar events at the same plant
On April 14, 2016, during performance of Surveillance Requirement (SR) 3.7.5.2, the TDAFWP failed to achieve required rated speed of 3950 rpm ± 25 rpm due to an equipment failure. The TDAFWP was declared inoperable, and TS LCO 3.7.5, Condition B, was entered. The equipment was repaired, the TDAFWP was re-tested successfully and returned to service. TS LCO 3.7.5 was exited on May 4, 2016.
This event, while similar, was the result of a loose wire and not the over tensioning of the governor valve.
B. Additional Information
None.
C. Safety System Functional Failure Consideration
This condition did not represent a safety system functional failure. During the initiating event the turbine started, came to rated speed, and flowed forward to maintain SG levels. Based on the as-found condition of the governor valve stem spring, the Terry Turbine would have tripped on overspeed anytime a sudden reduction in forward flow to the SGs were to occur. If needed, the Trip and Throttle Valve (2-FCV-001-0051) could have been reset from the Main Control Room and the turbine restarted to maintain SG levels in accordance with the Feedwater and Main Steam Annunciator Response Instruction.
Additionally, during the timeframe that the TDAFWP was INOPERABLE while in Modes 1, 2 and 3, based on the initial conclusion that the 2A-A MDAFWP could perform it design basis function, this condition did not result in a safety system functional failure because two MDAFWPs were capable of supplying AFW to all four steam generators. Additional evaluation found no evidence to change the original conclusion that the 2A-A MDAFWP was OPERABLE.
D. Scrams with Complications Consideration There was no scram associated with this event.
VIII. COMMITMENTS
None.
|
---|
|
|
| | Reporting criterion |
---|
05000390/LER-2016-010 | Emergency Diesel Generator Crankcase Pressure Switches Not Analyzed to Withstand the Effects of a Tornado LER-16-010-00 for Watts Bar Nuclear Plant, Units 1 and 2 Regarding Emergency Diesel Generator Crankcase Pressure Switches Not Analyzed to Withstand the Effects of a Tornado | 10 CFR 50.73(a)(2)(ii)(B), Unanalyzed Condition | 05000390/LER-2016-001 | Channel Mode Switch in Incorrect Position Renders Lower Containment Atmosphere Particulate Radiation Monitor Inoperable LER 16-001-00 for Watts Bar, Unit 1, Regarding Channel Mode Switch in Incorrect Position Renders Lower Containment Atmosphere Particulate Radiation Monitor Inoperable | 10 CFR 50.73(a)(2)(i)(B), Prohibited by Technical Specifications | 05000390/LER-2016-011 | Loss of Centrifugal Charging Pump Due to Repeat Failure of Associated Room Cooler LER 16-011-01 for Watts Bar Nuclear Plant, Unit 1 Regarding Loss of Centrifugal Charging Pump Due to Repeat Failure of Associated Room Cooler | 10 CFR 50.73(a)(2)(i)(B), Prohibited by Technical Specifications | 05000391/LER-2016-001 | Loss of Automatic Containment Isolation for the Steam Generator Blowdown Sampling Lines LER 16-001-00 for Watts Bar, Unit 2, Regarding Loss of Automatic Containment Isolation for the Steam Generator Blowdown Sampling Lines | 10 CFR 50.73(a)(2)(vii), Common Cause Inoperability 10 CFR 50.73(a)(2)(i)(B), Prohibited by Technical Specifications | 05000391/LER-2016-002 | Turbine Driven Auxiliary Feedwater Pump Inoperable for Longer than Allowable Outage Time due to Turbine Speed Control Failure LER 16-002-00 for Watts Bar, Unit 2, Regarding Turbine Driven Auxiliary Feedwater Pump Inoperable for Longer Than Allowable Outage Time Due to Turbine Speed Control Failure | 10 CFR 50.73(a)(2)(i)(B), Prohibited by Technical Specifications | 05000390/LER-2016-002 | Technical Specification Action Not Met for Inoperable Containment Isolation Valve LER 16-002-00 for Watts Bar, Unit 1, Regarding Technical Specification Action Not Met for Inoperable Containment Isolation Valve | 10 CFR 50.73(a)(2)(i)(B), Prohibited by Technical Specifications | 05000391/LER-2016-003 | Turbine Driven Auxiliary Feedwater Pump Inoperable for Longer than Allowable Outage Time due to Governor Valve Spring Over-Tensioning LER 16-003-00 for Watts Bar, Unit 2, Regarding Turbine Driven Auxiliary Feedwater Pump lnoperable for Longer Than Allowable Outage Time Due to Governor Valve Spring Over-Tensioning | 10 CFR 50.73(a)(2)(i)(B), Prohibited by Technical Specifications | 05000390/LER-2016-003 | Technical Specification Surveillance Requirement Not Met During Emergency Core Cooling System Venting LER 16-003-00 for Watts Bar, Unit 1, Regarding Technical Specification Surveillance Requirement Not Met During Emergency Core Cooling System Venting | 10 CFR 50.73(a)(2)(i)(B), Prohibited by Technical Specifications | 05000391/LER-2016-004 | Reactor Trip and Safety Injection Actuation Caused by Turbine Governor Valve Failure LER 16-004-00 for Watts Bar, Unit 2, Regarding Reactor Trip and Safety Injection Actuation Caused by Turbine Governor Valve Failure | 10 CFR 50.73(a)(2)(iv)(A), System Actuation | 05000390/LER-2016-004 | Automatic Reactor Trip Due to Actuation of Over Temperature Delta Temperature Bistables LER 16-004-00 for Watts Bar, Unit 1, Regarding Automatic Reactor Trip Due to Actuation of Over Temperature Delta Temperature Bistables | 10 CFR 50.73(a)(2)(iv)(A), System Actuation | 05000391/LER-2016-005 | Main Feedwater Pump Trip on Loss of Condenser Vacuum Leads to Turbine Trip and Reactor Trip LER 16-005-00 for Watts Bar, Unit 2, Regarding Main Feedwater Pump Trip on Loss of Condenser Vacuum Leads to Turbine Trip and Reactor Trip | 10 CFR 50.73(a)(2)(iv)(A), System Actuation | 05000390/LER-2016-005 | Both Trains of Unit 1 Emergency Gas Treatment System Inoperable During Unit 2 Testing LER 16-005-00 for Watts Bar, Unit 1, Regarding Both Trains of Unit 1, Emergency Gas Treatment System Inoperable During Unit 2, Testing | 10 CFR 50.73(a)(2)(v)(C), Loss of Safety Function - Release of Radioactive Material 10 CFR 50.73(a)(2)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident | 05000391/LER-2016-006 | Turbine Driven Auxiliary Feedwater Pump Auto Start on Lo-Lo Steam Generator Level Following Planned Unit Trip | 10 CFR 50.73(a)(2)(iv)(A), System Actuation | 05000390/LER-2016-006 | Undersized Room Cooler Fan Shaft Results in Loss of Centrifugal Charging Pump LER 16-006-00 for Watts Bar, Unit 1, Regarding Undersized Room Cooler Fan Shaft Results in Loss of Centrifugal Charging Pump | 10 CFR 50.73(a)(2)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident 10 CFR 50.73(a)(2)(i)(B), Prohibited by Technical Specifications | 05000391/LER-2016-007 | Manual Reactor Trip Due to Loss of Main Feedwater | 10 CFR 50.73(a)(2)(iv)(A), System Actuation | 05000390/LER-2016-007 | Technical Specification Action Not Met for Rod Position Indication LER 16-007-00 for Watts Bar Nuclear Plant, Unit 1 Regarding Technical Specification Action Not Met for Rod Position Indication | 10 CFR 50.73(a)(2)(i)(B), Prohibited by Technical Specifications | 05000390/LER-2016-008 | Emergency Diesel Generator Manual Start Due to Loss of Voltage on the 6.9kV Shutdown Board 1B-B LER 16-008-00 for Watts Bar, Unit 1, Regarding Emergency Diesel Generator Manual Start Due to Loss of Voltage on the 6.9kV Shutdown Board 1B-B | 10 CFR 50.73(a)(2)(iv)(A), System Actuation | 05000391/LER-2016-008 | Reactor Trip Resulting from Failure of 2B Main Bank Transformer LER 16-008-00 for Watts Bar, Unit 2, Regarding Reactor Trip Resulting from Failure of 2B Main Bank Transformer | 10 CFR 50.73(a)(2)(iv)(A), System Actuation | 05000390/LER-2016-009 | Failure to Complete Surveillance Requirements Causes a Condition Prohibited by the Technical Specifications LER 16-009-00 for Watts Bar, Unit 1, Regarding Failure to Complete Surveillance Requirements Causes Conditions Prohibited by the Technical Specifications | 10 CFR 50.73(a)(2)(i)(B), Prohibited by Technical Specifications |
|