05000390/LER-2017-015

From kanterella
Jump to navigation Jump to search
LER-2017-005, Failure to Enter Limiting Condition of Operation Action Statement Results in a Condition Prohibited by Technical Specifications
Watts Bar Nuclear Plant, Unit 1
Event date: 11-09-2017
Report date: 1-08-2018
Reporting criterion: 10 CFR 50.73(a)(2)(i)(B), Prohibited by Technical Specifications
3902017005R00 - NRC Website
LER 17-015-00 for Watts Bar, Units 1 and 2, Regarding Failure to Enter Limiting Condition of Operation Action Statement Results in a Condition Prohibited by Technical Specifications
ML18008A215
Person / Time
Site: Watts Bar  Tennessee Valley Authority icon.png
Issue date: 01/08/2018
From: Simmons P
Tennessee Valley Authority
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
LER 17-015-00
Download: ML18008A215 (7)


Estnated border: per rer.po

  • se to comply with Inis mandatory collection 'equest 80 hours9.259259e-4 days <br />0.0222 hours <br />1.322751e-4 weeks <br />3.044e-5 months <br /> Re ruled :essons learned are incorporated into the !ic.er34,,: process and 'ed back to .rdustry. Send commcnts buraer estirna'.e to the Irformation Sery ces Branca (T-2 p43). US. P.ucen Regulatory Commissicr. Washingto- DC 20555-0001. o' by e-mail 10 -focollects.Resc:urco@nrc.gcv. and to tho Des, OVicer. Office of Informat on arid Regulatory Afairs.

NEOR 10202. (:5' 50 0104). Office c' Management and Budge:. Washington. DC 20503. If a ;rears Lsec to irp.ce an informa:ion collection cues nom display a current y vafic OMB cont.-0: rumber-. :!.he NRC.; may rot conduct or Sp::nSC:r. ard a person is rot ..eq,yed tc respo:'d to the i!'o-rnation collestior.

3. LER NUMBER

2017 - 00 015

I. PLANT OPERATING CONDITIONS BEFORE THE EVENT

Watts Bar Nuclear Plant (WBN) Unit 1 was in Mode 1 at 100 percent rated thermal power (RTP) WBN Unit 2 was defueled (No Mode).

II. DESCRIPTION OF EVENT

A. Event Summary On November 9, 2017, an issue was identified where Technical Specification (TS) Limiting Conditions of Operation (LCOs) were not entered when non-TS Engineered Safety Feature (ESF) area coolers {EIIS:CLR} were removed from service for maintenance. The Watts Bar Nuclear Plant (WBN) had been performing maintenance on ESF coolers serving Auxiliary Building ventilation {EIIS:VF} areas without entering the TS LCO Action Statements associated with equipment present in those areas. Specific areas of concern identified were the general areas of the 713 foot and 737 foot elevations of the Auxiliary Building. These coolers were taken out of service for time periods longer than allowed for ESF equipment (typically 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />).

This event is being reported to the Nuclear Regulatory Commission (NRC) under 10 CFR 50.73(a)(2)(i)(B) as a condition prohibited by Technical Specifications.

B. Inoperable Structures, Components, or Systems that Contributed to the Event No inoperable equipment contributed to this event.

C. Dates and Approximate Times of Occurrences Date Event 4/5/2002 NRC issues letter to Perry plant related to application of Generic Letter 80- 30 guidance to an inoperable non-technical specification support subsystem.

4/5/2010 WBN adopts the Perry guidance into plant documents via an engineering change.

11/9/2017 CR 1357258 generated questioning the need for TS LCO Action Statement entry requirements for removing a redundant, non-TS ESF cooler from service.

D. Manufacturer and Model Number of Components that Failed During the Event There were no failed components that contributed to this event.

E. Other Systems or Secondary Functions Affected

No other systems or secondary functions were affected.

F. Method of discovery of each Component or System Failure or Procedural Error comments regarding burden estimate to the Information Services Branch (T-2 F43). U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001. or by e-mail to NEOB-10202. (3150-0104). Office of Management and Budget. Washington, DC 20503. If a means used to impose an information collection does not display a currently valid OMB control number. the NRC may not conduct or sponsor. and a person is not required to respond to, the information collection.

The issue was identified by an NRC resident inspector.

G. Failure Mode and Effect of Each Failed Component There was no equipment failure associated with this event.

H. Operator Actions

Upon identification of the issue, non-TS ESF coolers were not removed from service without either entering a TS LCO Action Statement or having an engineering evaluation performed to demonstrate that with the cooler removed from service and a failure of the opposite train (including associated train coolers), no loss of safety function would occur if an accident were to occur and thereby not necessitating a TS LCO Action Statement entry.

I. Automatically and Manually Initiated Safety System Responses None.

III. CAUSE OF THE EVENT

A. The cause of each component or system failure or personnel error, if known.

The cause of this issue is under investigation.

B. The cause(s) and circumstances for each human performance related root cause.

The cause of this issue is under investigation.

IV. ANALYSIS OF THE EVENT

NRC Generic Letter 80-30 identifies requirements related to the operability of plant equipment including support systems. The definition of operability includes "cooling" which would be inferred to mean ventilation and heat exchangers. A specific subset of Watts Bar equipment to which the above statement applies would be the non-TS ESF area coolers In 2002, the Perry nuclear plant was issued a clarification letter for the intended treatment of an "unusual" support system arrangement in which a non-TS support system has two redundant 100% capacity subsystems, each capable of supporting both trains of TS equipment. In this letter, it was clarified that the loss of one support subsystem does not result in a loss of support for either train of TS equipment, and both TS trains would remain operable despite a loss of support function redundancy, because the TS definition of operability does not require a TS subsystem's necessary support function to meet the single failure design criterion. The risk of operating in a non-single failure proof configuration could be assessed and managed by 10 CFR 50.65(a)(4), i.e., the Maintenance Rule. This guidance was defined in its own cover letter as a "clarification of existing generic guidance developed by the TS Section of the Office of Nuclear Reactor Regulation," and appeared to be generic in intent and application. The Perry guidance was adopted by WBN in 2010.

comments regarding burden estimate to the Information Services Branch (T-2 F43). U.S. Nuclear Regulatory Commission, Washington. DC 20555-0001. or by e-mail to Infocollects.Resource@nrc.gov. and to the Desk Officer. Office of Information and Regulatory Affairs.

NEOB-10202. (3150-0104). Office of Management and Budget: Washington, DC 20503. If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to. the information collection.

3. LER NUMBER

2017 - 00 015 NRC position on this issue may have changed and is documented in a number of violations at other stations starting in the late 2000's and 2010 time period. These issues were identified and are the source of CR 1357258.

V. ASSESSMENT OF SAFETY CONSEQUENCES

Engineering evaluations pertaining to the safety consequences of this issue are in progress; however, at this time, a number of auxiliary building areas have been evaluated assuming one cooler out of service, coincident with an accident and single failure resulting in the loss of the opposite train of ESF equipment (including coolers). These preliminary reviews have demonstrated that the safety function for the equipment served by the applicable coolers would have been met, and the need to enter TS LCOs as supporting equipment was not required.

A. Availability of systems or components that could have performed the same function as the components and systems that failed during the event The impact of this issue is under investigation.

B. For events that occurred when the reactor was shut down, availability of systems or components needed to shutdown the reactor and maintain safe shutdown conditions, remove residual heat, control the release of radioactive material, or mitigate the consequences of an accident The impact of this issue is under investigation.

C. For failure that rendered a train of a safety system inoperable, an estimate of the elapsed time from the discovery of the failure until the train was returned to service The impact of this issue is under investigation.

VI. CORRECTIVE ACTIONS

This event was entered into the Tennessee Valley Authority (TVA) Corrective Action Program and is being tracked under Condition Report (CR) 1357258.

A. Immediate Corrective Actions

Upon identification of the issue, Non-TS ESF area coolers were not removed from service without either entering a TS LCO or having an evaluation performed to demonstrate that with the cooler removed from service and a failure of the opposite train (including associated train coolers), no loss of safety function would occur.

B. Corrective Actions to Prevent Recurrence or to Reduce Probability of Similar Events Occurring in the Future Actions to prevent recurrence will be provided in a supplement to this report.

comments regarding burden estimate to the Information Services Branch (T-2 F43). U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001. or by e-mail to Infocollects.Resource@nrc.gov. and to the Desk Officer. Office of Information and Regulatory Affairs.

NEOB-10202. (3150-0104). Office of Management and Budget. Washington, DC 20503. If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor. and a person is not required to respond to. the information collection.

VII. PREVIOUS SIMILAR EVENTS AT THE SAME SITE

This will be provided in a supplement to this report.

VIII. ADDITIONAL INFORMATION

None.

IX. COMMITMENTS

None.