Pages that link to "PNO-V-87-030A, on 870415,Region V Augmented Insp Team Commenced Insp Activities Re 870410 Loss of Suction to RHR While at Half Loop.Team Expects to Stay Onsite Through 870421.Summary of Sequence of Event Encl"
Jump to navigation
Jump to search
The following pages link to PNO-V-87-030A, on 870415,Region V Augmented Insp Team Commenced Insp Activities Re 870410 Loss of Suction to RHR While at Half Loop.Team Expects to Stay Onsite Through 870421.Summary of Sequence of Event Encl:
Displayed 50 items.
- PNO-V-85-081, on 851201,turbine & Reactor Trips Occurred. Caused by High Steam Generator Level Due to Sluggish Automatic Steam Generator Level Control Sys Response.No Safety Injection or ECCS Activated (← links)
- PNO-V-85-082, on 851202,low Tide Concurrent W/High Seas Caused Kelp to Be Injected Into Condenser Circulating Water Intake Structure.Control RPI Lost & Reactor Manually Tripped.Cause Under Investigation (← links)
- PNO-V-85-080, on 851128,oscillation of Steam Flow Resulted in Reactor Trip Due to Completion of Steam Generator Low Level Coincident W/Steam Flow/Feedwater Flow Mismatch Logic. Cause Will Be Determined Prior to Resuming Operations (← links)
- ML20137S735 (← links)
- PNO-V-85-079, on 851126,safety Injection Occurred on High Steam Flow Signal.Cause Under Investigation.Plant Stabilized & Maintaining Hot Standby Conditions.Licensee Plans to Evaluate Data & Make Appropriate Adjustments (← links)
- PNO-V-85-055, on 850820,initial Criticality Achieved W/Boron Concentration within Expected Acceptance Criteria for Estimated Critical Conditions.Low Power Physics Testing in Progress & Expected to Be Completed in 7 Days (← links)
- IR 05000275/1985023 (← links)
- PNO-V-86-001, on 860102,unusual Event Declared When Reactor Tripped on lo-lo Steam Generator Level Following Feedwater Pump Trip.Caused by Reactor Coolant Pumps Tripping on Undervoltage.Pumps Restarted in 3 to 5 Minutes (← links)
- PNO-V-85-056, on 850829,reactor Tripped from 4% Power.Caused by Low Steam Generator Level Concurrent W/Steam Flow/ Feedwater Flow Mismatch During Surveillance Testing. Licensee Investigating Potential Equipment Problems (← links)
- IR 05000275/1978007 (← links)
- PNO-V-86-010, on 860312,reactor Brought Critical Following Negative Rate Trip During Net Load Startup Test on 860311. Reactor Declared in Commercial Operation on 860313 (← links)
- PNO-V-85-038, on 850626,press Conference Held to Announce That Nine People Charged W/Felony Sale of Drugs Offsite as Result of 8 Months Undercover Drug Investigation.No Licensee Employees Charged (← links)
- IR 05000275/1985038 (← links)
- PNO-V-85-091, on 851225,during Full Load Rejection Test, Reactor Tripped on lo-lo Steam Generator Level & Coolant Pumps Tripped.Caused by over-responsive Turbine Control Sys & under-responsive Steam Dump Sys.Pumps Restarted (← links)
- PNO-V-85-074, on 851030,cold Shutdown Occurred.Caused by Condenser Tube Leak.Leak Location Not Determined.Plans to Drain & Refill Steam Generators Underway (← links)
- IR 05000275/1985032 (← links)
- IR 05000818/2009028 (← links)
- ML20138E194 (← links)
- ML20138D765 (← links)
- IR 05000275/1985024 (← links)
- PNO-V-85-053, on 850814,grass Fire Occurred,Burning Approx 80 Acres.Caused by Automobile Accident on Plant Access Road, Approx 2.5 Miles South of Plant.Licensee Requested Assistance from State of CA Div of Forestry (← links)
- PNO-V-85-051, on 850804,two Earthquakes Measuring 4.6 & 5.5 on Richter Scale Occurred 70 Miles from Facility.Primary Seismic Recording Equipment Failed to Trigger as Setpoint Higher than Acceleration Experienced at Site (← links)
- PNO-V-85-047, on 850721-22,interference Problem W/Upper Lateral Support Bumper Block Assemblies on Steam Generators Identified.Originally Discovered During Hot Functional Testing in Late 1984.Bumper Installation Modified (← links)
- PNO-V-85-040, on 850708,licensee Informed Region That Site Unaffected by Current Brush Fires.On 850707,fire Caused 45 Minute Outage to Emergency Notification Sys (← links)
- PNO-V-85-029, on 850518 & 20,reactor Trip & Safety Injection Occurred Due to Loss of Vital Instrument Ac Power.Caused by Failure of Transformer in Vital Instrument Ac Inverter IY-13 & IY-12 Output Breaker Tripping Open (← links)
- ML20127M820 (← links)
- PNO-V-86-013, on 860330,while Reducing Power Due to Indications of Condenser Tube Rupture,Operator Initiated Manual Unit Trip Resulting in Safety Injection on High Steam Flow & lo-lo Tavg.Caused by Switch Problem & Stuck Valve (← links)
- PNO-V-86-011, on 860314,during Main Turbine Testing,Safety Injection & Reactor Trip Occurred from High Steam Flow Signal.Plant Stabilized.Licensee Will Resume Operations Once Event Evaluated & Excess Boron Removed (← links)
- PNO-V-86-008, on 860219,unusual Event Declared & Hot Shutdown Initiated After Boron Sample Exceeded 2,200 Ppm.Unusual Event Terminated When Primary Std for Boron Analysis Determined to Be Faulty (← links)
- ML20151P309 (← links)
- IR 05000275/1984005 (← links)
- PNO-V-88-048, on 880717,unit Manually Tripped & Natural Cooldown Commenced as Result of Ground Fault in 12 Kv non- Vital Buses.Event Investigation Team Formed to Determine Location & Cause of Ground Fault (← links)
- IR 05000275/1994027 (← links)
- ML20196D615 (← links)
- IR 05000275/1998016 (← links)
- IR 05000275/1970001 (← links)
- IR 05000275/1998003 (← links)
- PNO-V-84-017, on 840331-0401,licensee Discussed Main Steam Safety Valve Failure,Inoperable Radwaste Valve & Loss of Control Room Annunciation (← links)
- PNO-V-84-023, on 840422,seal Water Leak Developed Past Mechanical Seal in Reactor Coolant Pump 14.Cause Unknown.Rcs Cooled.Problem Will Be Corrected Prior to Proceeding Further Toward Initial Criticality (← links)
- PNO-V-83-028, on 830718,licensee Representative Called Region V Office to Report That PG&E Determined That Less than Min Wall Thickness Existed in RCS at Location of Gouges Previously Identified on 830419 (← links)
- IR 05000275/1986014 (← links)
- ML20198J129 (← links)
- IR 05000275/1986015 (← links)
- PNO-V-87-028, on 870403,reactor Tripped from 12% Power During Shut Down for First Refueling Outage.Caused by Flicker of High Steam Flow Bistables Coincident w/lo-lo T Average.Investigation Continuing (← links)
- PNO-V-87-025, on 870321,facility Experienced Safety Injection,Reactor Trip & Unit Trip.Caused by Coincidence of High Steam Flow & Low Steam Generator Pressure Signals Due to Closure of MSIV FCV 41.Piping & Valve Switches Inspected (← links)
- IR 05000275/1987009 (← links)
- IR 05000275/1985014 (← links)
- IR 05000275/1986033 (← links)
- PNO-V-86-027, on 860505,diesel Generator Unexpectedly Started & Loaded on Vital Bus G Undervoltage Condition.Auxiliary Feeder Breaker Tripped on Overcurrent & Startup Power Feeder Breaker Did Not Close In.Investigation Underway (← links)
- PNO-V-86-067, on 861001,fuel Assembly in Vessel Found W/ 10-degree Tilt & Resting Askew Against Core Baffle Plate. Cause Under Investigation.Program & Special Tools Prepared to Return Assembly to Vertical Position (← links)