- PNO-IV-85-052, on 851003,plant Outage Initiated from Hot Standby to Replace Failed Seal on Reactor Coolant Pump 2B. Cause Not Stated (← links)
- PNO-IV-85-062, on 851206,plant Offgas Sys Experienced Transient Upon Automatic Switchover from Dryer a to Dryer C. Caused by Failure of Discharge Valve on Dryer C to Open Resulting in Back Pressure Blowing Out Water Loop Seals (← links)
- PNO-IV-86-003, on 860107,fire Prevention Deluge Sys Inadvertently Actuated in Auxiliary Bldg,Wetting Nonvital 480-volt Ac Load Ctr.Unit May Remain Shut Down in Excess of 2 Days During Evaluation & Drying Out of Load Ctr (← links)
- PNO-IV-85-045, on 850829,unusual Event Declared Due to Hurricane Elena,w/75 Plus Mph Winds.Emergency Procedures Implemented & Site Prepared for Adverse Weather Conditions (← links)
- PNO-IV-88-006, on 880105,licensee Determined That Reactor Vessel Flange Inner O-ring Leaking.Inner Leakoff Monitor Tube Isolated to Contain Leakage.Outage of Approx 21 Days Expected in Order to Replace O-ring Seals (← links)
- ML20148G171 (← links)
- PNO-IV-88-020, on 880308,bag Containing Used anti-C Clothing Found to Contain Hot Particle in Shoulder Area of Garment. Mobile Particle Was Approx 725 Uci of Cobalt/Manganese Compound.Four Personnel Examined W/No Skin Irregularities (← links)
- PNO-IV-88-018, on 880301,local Business Agents for Const Electricians & Pipefitters Stopped Supervision of Field Work.Work Supervised by Nonmanual & Supervisory Personnel. Law Enforcement Authorities Notified Due to Fights (← links)
- PNO-IV-88-016, on 880228,reactor Trip Occurred W/Control Rods Positioned for Initial Criticality & Boron Dilution Was in Progress.Caused by Spurious Signal from Loop 3 lo-lo Temp Cold.Test Procedures Modified to Restart Testing (← links)
- ML20140G325 (← links)
- ML20140F593 (← links)
- PNO-IV-97-035, on 970611,licensee Issued Press Release That Stated That Current Anticipated Restart Date of Waterford 3 Will Be mid-July.Caused by Internal Fault in Startup Transformer.State of La Has Been Informed (← links)
- PNO-I-86-006, on 860123,facility Achieved Initial Criticality.Criticality Boron Concentration Was 1,591 Ppm, 32 Ppm Above Predicted Concentration & within Tech Spec Max Margin of 100 Ppm (← links)
- PNO-IV-85-055, on 851031,initial Criticality Achieved. Criticality Occurred at Predicted Point in Rod Withdrawal Sequence (← links)
- PNO-IV-85-063, on 851206,reactor Inadvertently Tripped.Caused by Operator Incorrectly Initiating Steps of Surveillance Tests on Control Element Assembly Calculators.Cold Shutdown Planned to Replace Reactor Coolant Pump Seals (← links)
- PNO-IV-97-015, on 970320,alert Declared at Waterford 3 Site as Result of Release of Gaseous Ammonia from Nearby Chemical Processing Plant.Licensee Notified Coast Guard of Event. State of La Informed (← links)
- PNO-IV-97-012, on 970222,licensee Transported Potentially Contaminated Individual to Matagorda General Hosp.Individual Received Laceration on Forehead & Another at Lips.State of Tx Will Be Informed (← links)
- PNO-IV-85-046, on 850829,util Received Low Power License. Fuel Load Will Not Start Until Potential for Heavy Weather from Hurricane Elena Resolved.Util Estimates Actual Fuel Movement Will Begin on 850830 (← links)
- ML20134A975 (← links)
- PNO-IV-97-006, on 970118,tanker Carrying Gasoline Spilled Portion of Cargo Into Mississippi River.State of Ms Has Been Informed (← links)
- PNO-IV-85-038, on 850801,contractor Employee Attempted to Enter Protected Area W/Handgun in Purse.Employee Stated That Gun for Personal Protection Offsite.Site Access Denied & Contractor Employee Discharged (← links)
- PNO-IV-85-035, on 850718,high Vibration Detected in Main Turbine.Vibrations in Vicinity of Generator End of Low Pressure Turbine.Plant Shut Down to Inspect for Damage. Followup Rept Will Be Issued If Significant Damage Found (← links)
- PNO-IV-85-029, increase in Gaseous Activity in Accessible Radiological Control Areas,Including Auxiliary Bldg,Reported Since Reaching 100% Power.Probably Caused by Positive Displacement Charging Pump Gland Leak Off (← links)
- PNO-IV-85-024, on 850530,util Reported That Agreement Reached on Cash Settlement of Lawsuit Against Halliburton,Co,Parent Company of Brown & Root,Inc.City of Austin,One of Four Principal Owners,Still Considering Agreement (← links)
- PNO-IV-93-003, on 930203,Unit 2 Tripped from Full Power on low-low Steam Generator Level Resulting in turbine-driven Auxiliary Feedwater Pump 24 Trip on Mechanical Overspeed. Cause Not Determined.Reactor Stabilized in Mode 3 (← links)
- PNO-IV-93-001, on 930112,NOUE Declared as Result of Commencing Reactor Shutdown Due to TS 3.0.3 Requirements. Caused by Inoperable Compensated Low Steam Line Pressure. Licensee Issued Press Release.State of Tx Informed (← links)
- PNO-IV-80-007, section of Reactor Containment Bldg Steel Liner Was Inadvertently Bulged During Volumetric Determination Using Water Under Pressure.Cause Not Stated (← links)
- PNO-IV-92-042, on 921206,reactor Manually Scrammed to Complete Planned Shutdown.Indications of Degraded Inboard Seal Noted.Outage Scope May Be Increased to Include Recirculation Pump a Seal Package (← links)
- PNO-IV-88-048, on 880516,EBASCO Employee Working in Refueling Area Received Approx 22 Rem Dose to Skin of Whole Body. Caused by Lodging of Hot Particale (Fuel Flea) on Employee Thigh After Passing Through Protective Clothing (← links)
- PNO-IV-88-078, on 880923,util Plans to Begin Scheduled Outage to Inspect Bottom Mounted Instrument (Bmi) Tubes.On 880506, Util Reported That Review of Eddy Current Test Data on 58 Bmi Thimble Tubes Revealed Wear on 19 Thimble Tubes (← links)
- PNO-IV-88-046, on 880525,steam-driven Main Feedwater Pump Failed.Licensee Preparing to Inspect Main Condenser for Damage.Repairs Should Take Several Days.No One Injured from Flying Debris.Facility Will Remain Shutdown (← links)
- PNO-IV-88-045, on 880521,plant Startup Followed Extended Outage for Performance of Maint Work.Completion of Testing at 30% Plateau Scheduled for 880526.Upon Satisfactory testing,50% Plateau Will Commence on 880527 (← links)
- PNO-IV-88-044, on 880518,two Employees Received Radiological Overexposure Due to Hot Particle & Sliver of Metal on Respirator,Respectively.Licensee Upgraded One Area to Hot Particle Control Area & Tightened Hot Particle Controls (← links)
- PNO-IV-86-007, on 860301,reactor Tripped from 38% Power. Caused by Failure of Nonvital Electrical Transformer. Reactor Restarted.Resident Inspectors Monitoring Licensee Activities (← links)
- PNO-IV-88-039, on 880506,review of Eddy Current Test Data Revealed Wear on 19 Thimble Tubes.Caused by Flow Induced Vibrations.Util Expecting Recommendation for Corrective Action from Westinghouse (← links)
- PNO-IV-88-041, on 880512,operators Noted Disagreement Between Tygon Tube Rv Level Indicator & New Indicator Just Installed.Cause Unknown at Present.Water Removed,Bringing Rv Level Indicator Into Relative Agreement (← links)
- PNO-IV-88-075, on 880906,reactor Scrammed from 100% Power. Caused by Main Generator Trip Due to Loss of Normal Station Transformer,Probably Caused by Cat Crawling Into Transformer.Noue Declared Because HPCS & RCIC Sys Initiated (← links)
- PNO-IV-88-037, on 880505,catalytic Cracking Unit at Shell Oil Co Refinery in Norco,La Exploded Into Flames.No Damage Found in Walkdown of Primary Coolant Boundaries.Second Refueling Outage Underway (← links)
- PNO-IV-98-045, on 980926,Unit 3 Declared Unusual Event of Hurricane Warning in St Charles Parish.River Bend Station Continued to Operate at Full Power Since Hurricane Force Winds Were Not Predicted in Vicinity of Site (← links)
- PNO-IV-88-036, util Begun 2 to 3-wk Maint Outage.Startup Testing Completed on 30% Power Testing Plateau.Licensee Also Plans to Replace Corroded Aluminum Bronze Fittings & Valves in Essential Cooling Water Sys.State of Tx Informed (← links)
- PNO-IV-88-072, on 880830,shutdown Began from Approx 45% Power to Repair Main Steam Vent Line Leak Coming from a Sock Weld. Licensee Will Insp Similar Socket Welds on Main Steam & Main Feed Lines Inside Containment During Shutdown (← links)
- PNO-IV-88-070, on 880825,reactor Scrammed Due Trip of Main Turbine After Brush Failure of Main Generator Exciter. Although Water Level Has Not Dropped to Level 2,HPCS Pump Did Start & May Have Injected.Power Restored to Div III Bus (← links)
- PNO-IV-88-069, on 880824,util 100 H NSSS Acceptance Test Completed.Upon Completion of Review of Startup Test Results by Plant Operations Review Committee,Util Will Be in Position to Begin Commercial Operation.State of Tx Informed (← links)
- PNO-IV-98-040, on 980917,licensee Commenced Shutdown of Reactor in Order to Replace Pressurizer Code Safety Valve That Had Been Experiencing Increased Leakage.Licensee Plans to Restart Facility on 980923 (← links)
- PNO-IV-88-032, on 880423,control Element Assembly (CEA) Inadvertently Withdrawn W/Upper Guide Structure During Refueling Outage.Cause Still Under Investigation.Replacement of CEA Gripper & Extension Under Consideration (← links)
- PNO-IV-88-066, on 880812,Region IV Notified of Truck Accident on Interstate 10,approx 30 Miles West of Baton Rouge.Truck Carrying Eight New Fuel Assemblies to Facility.Shipping Packages Undamaged.Packages Returned to State of Sc (← links)
- PNO-IV-88-030, on 880418,Train a Control Room Ventilation Makeup Supply Damper Failed to Close During Surveillance. Licensee Repaired Failed Damper & Plant Returned to Power Escalation from 13% Power (← links)
- PNO-IV-88-024, on 880330,reactor Trip & Safety Injection Occurred Due to Loss of Offsite Power.Caused by Troubleshooting Work on Main Generator Control Circuits to Determine Cause of Main Generator Output Breaker Trip (← links)
- PNO-V-88-044, on 880627,earthquake Occurred 5 Miles East of Santa Cruz,Ca.Seismic Instrumentation Not Triggered at Vallecitos,Aerotest Operations or at Univ of California at Berkeley (← links)
- PNO-IV-88-013, on 880219,reactor Circulation Pump Motor Tripped on over-current Condition.Caused by Low Megger Readings to Pump Motor.Orderly Plant Shutdown Continued W/ Plans to Go to Cold Shutdown for Necessary Repairs (← links)