Pages that link to "PNO-I-97-071, on 971124,licensee Announced Some Senior Level Mgt Changes.Ns Carns Resigned as Chief Nuclear Officer of Northeast Nuclear Energy Co,Effective 971201.Press Release Was Issued"
Jump to navigation
Jump to search
The following pages link to PNO-I-97-071, on 971124,licensee Announced Some Senior Level Mgt Changes.Ns Carns Resigned as Chief Nuclear Officer of Northeast Nuclear Energy Co,Effective 971201.Press Release Was Issued:
Displayed 50 items.
- PNO-I-85-088, on 851121,normal 345 Kv Offsite Power Lost as Result of Personnel Error During Surveillance of Offsite Power Source Breakers.Emergency Gas Turbine Generator Failed to Start.Shutdown Capability Lost for 5 Minutes (← links)
- ML20138R079 (← links)
- PNO-I-85-058, on 850813,reactor Tripped & Main Steam Line Isolation Occurred Due to Indicated Steam Line Area High Radiation.Caused by Air Introduction Into Feedwater Sys While Placing Demineralizer in Svc (← links)
- PNO-I-85-073, on 851001,unit Placed in Cold Shutdown After Ground Fault Found in Reactor Coolant Pump Motor.Pump Motor Will Be Removed to Allow Util & GE to Determine Whether Fault Accessible (← links)
- PNO-I-85-050, on 850715,reactor Tripped from Full Power When Pressure Dropped to Thermal Margin/Low Pressure Setpoint of Approx 2,130 Psi.Caused by Failure of Both Pressurizer Spray Valves to Shut (← links)
- PNO-I-80-043, on 800318,one Truck Full of Chlorine Rail Tank Car Derailed at Broken Switch on Licensee Property.Car Presently Located Outside Protected Area,But Is Upright, Intact, & Stable.Formulating Plans to Replace Car on Rail (← links)
- PNO-I-80-001, on 800104,isolation Condenser Isolated.Addl Insps of Containment Wall in Progress.Power Operation Will Continue Per Tech Specs for 15 Days.Precedures Require Power Be Reduced to 40% 24-h After Removing Condenser from Svc (← links)
- PNO-I-88-049, on 880506,plant Shutdown Commenced to Locate Source of Boric Acid Buildup on Control Element Drive Mechanism Coolers & Ventilation Shroud & Unidentified Leakage.Util Plans to Replace Reactor Vessel Head O-rings (← links)
- ML20151X657 (← links)
- ML20151X599 (← links)
- ML20151X444 (← links)
- ML20151U881 (← links)
- ML20151U650 (← links)
- PNO-I-86-012, on 860206,during Routine Closure Surveillance, Inboard MSIV Failed to Close.Main Steam Lines Isolated.One Inboard MSIV Remains Open.Investigation & Repair of Valve Underway (← links)
- PNO-I-88-041, on 880414,unidentified Leak Exceeded 6 Gpm Limit.Leak Identified from PORV Block Valve Packing Leakoff Line.Manual Valve in Leakoff Line Shut Off.Checks for Leaks & High Temp Investigation Continuing (← links)
- PNO-I-88-101, on 881005,MSIV C Closed Fully During Partial Stoke Testing of Valve,Causing Water Level Decrease in Steam Generator C & Reactor Trip on lo-lo Steam Generator Level. Shutdown Extended to Perform Maint on Valve (← links)
- ML20199H216 (redirect page) (← links)
- PNO-I-97-071 (redirect page) (← links)
- PNO-I-99-004, on 990115,carbon Dioxide Was Inadvertently Discharged Into Unit 3 Cable Spreading Room,Containing Electrical Wiring.Ambulance Reported to Site as Precautionary Measure.Licensee Assembled Event Review (← links)
- PNO-I-99-001, on 981231,Millstone Unit 2 Began Reloading Fuel Into Reactor After Extended Shutdown.Millstone Unit 3 Went Critical on 981230,after Forced Outage Due to Inadvertent MSIV Closure During Surveillance Testing at Power (← links)
- PNO-I-88-060, on 880607,while at 100% Power,Cedm 23 Dropped Into Core.Licensee Investigation Found CEDM 23 Breaker Had Tripped on Overcurrent & Upper Gripper Coil Had Electrical Short.Plant Shut Down for Estimated 4 Days for Repair (← links)
- ML20198B483 (← links)
- ML20198B378 (← links)
- PNO-I-88-118, on 881113,licensee Shutdown Plant in Response to High Unidentified Leakage Into Primary Containment.Caused by Increase in Unidentified Drywell Leakage.Licensee Will Replace Topwork for Both D & E Safety Relief Valves (← links)
- PNO-I-86-020, on 860221,controlled Shutdown Occurred Due to Sulfate Concentrations Exceeding Owners Group Guideline of 20 Parts Per Billion.Caused by Condensate Demineralizer Resin Intrusion.Plans Made to Drain & Refill Generators (← links)
- PNO-I-88-111, on 881022,manual Reactor/Turbine Trip Was Initiated Due to Lowering Main Condenser Vacuum.High Suction Differential Pressure Conditions Caused by Seaweed Impingement.All MSIVs Were Closed (← links)
- PNO-I-99-016, on 990406,operators Initiated Plant Cooldown from Normal Operating Pressure & Temp in Mode 3,hot Standby. Cooldown Was Necessary to Minimize Further Degradation of Bonnet Pressure Seal for Valve 2-SI-652 & to Repair Valve (← links)
- PNO-I-86-064, on 860812,reactor Tripped Due to Low Pressure Output of Steam Generator Feedwater Pump gear-driven Pump. Investigation Underway (← links)
- PNO-I-99-006, on 990128,operators Inadvertently Reduced Spent Fuel Pool Water Level by Two Inches When Purification of Spent Fuel Pool Water Initiated.Operators Held Shift Briefing to Discuss Realigning Purification Sys (← links)
- PNO-I-86-056, on 860724 Plant Shut Down Due to Open let- Down Sys Relief Valve.While Shut Down,Reactor Tripped on Low Steam Generator Level.Caused by Level Swings Due to Malfunctioning Valve Operators (← links)
- ML20207H093 (← links)
- ML20207H074 (← links)
- ML20207G504 (← links)
- ML20207G460 (← links)
- ML20207G442 (← links)
- ML20207G408 (← links)
- PNO-I-98-025, on 980630,unit 3 Established Reactor Criticality,However Reactor Was Shut Down When Control Room Operator Noticed Spiking Intermediate Range Monitor.Licensee Troubleshooting (← links)
- PNO-I-98-062, on 981211,Millstone Unit 3 Tripped from 100% Reactor Power During MSIV Partial Stroke Testing.Solenoid Valve Integral to MSIV Failed to Reopen When Licensed Operator Released Test Switch (← links)
- PNO-I-99-022, on 990509,Millstone Unit 2 Established Reactor Criticality.Nrc Staff Providing Augmented Insp Coverage of Restart Activities,Including round-the-clock Observations of Licensee Activities During Key Operational Evolutions (← links)
- PNO-I-87-007, on 870129,licensee Began Normal Shutdown of Facility to Repair Leak in Steam Generator SG-1.Leak Caused by Tube Defect.Plant Will Remain Shut Down for 17 to 18 Days.State of CT Informed (← links)
- PNO-I-87-043, on 870514,during Reactor Trip Breaker Response Time Testing,Reactor Trip Occurred.Steam Generator Feedwater Isolation Pressure Transient Resulted in Failure of Two Lines to Thermal Relief Valves.Cause Under Investigation (← links)
- ML20213G472 (← links)
- ML20213D165 (← links)
- PNO-I-89-028, on 890411,shutdown Initiated from Full Power When RCS Unidentified Leak Rate Reached 1.5 Gpm.Charging Flow Control Valves Closed to Limit Amount of Boron Injected.Caused by Crack on Leakage Monitoring Valve (← links)
- ML20244A619 (← links)
- PNO-I-98-039, 980812,Millstone Unit 3 Was Shutdown to Repair Small Leak on Afws Discharge Noted.Current Leakage Does Not Exceed Regulatory Requirements & Shutdown Not Required by Tech Specs.Licensee Issued Press Release on 980811 (← links)
- ML20249B535 (← links)
- ML20249B494 (← links)
- ML20249B351 (← links)
- ML20249B332 (← links)