Pages that link to "PNO-I-88-116, on 881108,voters Voted Down state-wide Referendum to Shutdown Plants in State of Ma If Nuclear Waste Produced in Process"
Jump to navigation
Jump to search
The following pages link to PNO-I-88-116, on 881108,voters Voted Down state-wide Referendum to Shutdown Plants in State of Ma If Nuclear Waste Produced in Process:
Displayed 50 items.
- IR 05000250/1986027 (← links)
- IR 05000335/1986013 (← links)
- PNO-I-97-026, on 970427,Yankee Atomic Electric Will Begin Shipment of Reactor Vessel for Disposal.First Phase of Shipment Will Involve Heavy Haul Truck from Rowe,Ma Site to Railway Approx Six Miles Away Near Hoosac Tunnel (← links)
- ML20137Z160 (← links)
- PNO-II-85-086, on 850826,Natl Weather Svc Upgraded Tropical Storm Elena to Hurricane.Utils Contacted Re Implementation of Hurricane Procedures (← links)
- ML20137K341 (← links)
- PNO-I-97-019, on 970401,declared Unusual Event at Pilgrim Nuclear Power Station,Due to Inability to Provide Offsite Electrical Power to Safety Related Electrical Busses.Loss of Offsite Electrical Power Resulted from Faults on Lines (← links)
- IR 05000264/1977002 (← links)
- ML20137G926 (← links)
- ML20137G908 (← links)
- IR 05000264/1975001 (← links)
- IR 05000264/1973001 (← links)
- ML20137G614 (← links)
- ML20137G478 (← links)
- ML20137G417 (← links)
- IR 05000272/1986099 (← links)
- ML20148F816 (← links)
- PNO-V-86-014, on 860331,earthquake W/Magnitude of 5.3 on Richter Scale Occurred Approx 10 Miles East of Fremont,Ca.No Damage Observed at Research Reactor Facilities.Rancho Seco Did Not Feel Effects of Earthquake (← links)
- IR 05000330/1977002 (← links)
- ML20140G343 (← links)
- ML20140G325 (← links)
- ML20140F593 (← links)
- ML20140E798 (← links)
- ML20140E617 (← links)
- IR 05000083/1982001 (← links)
- IR 05000124/1983001 (← links)
- IR 05000124/1984001 (← links)
- ML20140A871 (← links)
- IR 05000546/1982007 (← links)
- ML20134A975 (← links)
- PNO-II-85-092, on 850926,Hurricane Gloria Located About 240 Miles South of Cape Hatteras,Nc,Moving North Northwest at 15 to 20 Miles Per Hour.Brunswick Unit 1 in Refueling Shutdown,Unit 2 Shut Down & Surry 1 & 2 at Full Power (← links)
- ML20133A820 (← links)
- IR 05000269/1984031 (← links)
- ML20132E516 (← links)
- PNO-V-85-060, on 850919,NOAA Pacific Tsunami Warning Ctr Issued Tsunami Watch Bulletin.Caused by Earthquake Northwest of Acapulco,Mexico.Watch Terminated (← links)
- PNO-III-85-053, on 850625,utils Announced Signing of Agreement to Combine Under New Holding Company,Scheduled by End of 1985.Utils Will Retain Local Identity & Considerable Autonomy.Affiliation Will Increase Efficiency & Lower Costs (← links)
- IR 05000329/1982012 (← links)
- ML20127F105 (← links)
- PNO-I-80-002, on 800223,observed Two Individuals Climb Protected Area Barrier Fence on East Side of Site. Individuals Eluded Security Force Surveillance.All Onsite Personnel Identified (← links)
- PNO-I-80-024, on 800210,facility Lost Incoming 345 Kv Transmission Line.Caused by External Power Sys Problems.Core Defueled & Spent Fuel Pool Temp Remained Relatively Constant During Event (← links)
- ML20126B725 (← links)
- PNO-I-80-028, on 800214,during Plant Startup W/Turbine at Rated Speed But Not Tied to Grid,Loud Noise Was Heard in Low Pressure Turbine Accompainied by Excessive Vibration. Turbine Coasted to Stop & Could Not Be Rotated (← links)
- ML20125E317 (← links)
- PNO-I-86-026, on 860404,reactor Scrammed During Shutdown for Repair of Leaking RHR Valve.Caused by Unexpected Closing of MSIV Valves Due to Reactor Mode Switch Problem.Cooldown Effected by Releasing Steam Into HPCI Sys (← links)
- PNO-I-88-058, on 880527,util Mgt Halted Performance of General Maint at Facility.Licensee self-assessment Completed on 880526 Identified Maint Program Weaknesses.Addl Maint Tasks Being Reviewed on case-by-case Basis (← links)
- ML20154F156 (← links)
- ML20154F135 (← links)
- ML20154E977 (← links)
- ML20154E908 (← links)
- ML20154E871 (← links)