- PNO-I-86-002, on 860109,fire Protection Deluge Sys for Auxiliary Transformer Manually Actuated by Unknown Person at Local Fire Box.Caused by Intentional Act of Tampering or Harassment.Addl Security Patrols Instituted (← links)
- PNO-I-85-056, on 850808,technician Experienced Radiation Exposure by Entering Traversing in-core Probe (TIP) Room. Technician Received 1.29 Rem Dose.Caused by TIP Probe Attaching Cable That Was Recently Stuck in-core (← links)
- PNO-I-98-048, on 981016,Vermont Yankee Commenced Normal Plant Shutdown,Due to Increasing Steam Leakage from Instrumentation Line on Main Steam High Pressure Drain Sys in Steam Tunnel.Outage Expected to Last Several Days (← links)
- PNO-I-86-014, on 860208,squib Valve a Failed to Open When Sys Actuated.Caused by Firing Circuit Being Miswired. Wiring Error Alo Exists in Squib B.Reactor Currently Defueled as Part of Extended Outage for Piping Replacement (← links)
- ML20151A808 (redirect page) (← links)
- PNO-I-88-039 (redirect page) (← links)
- PNO-I-88-102, on 880928,two Technicians Observed Attempting to Gain Entry Into Posted High Radiation Area Through Locked Door W/O Use of Key.Exams of Doors Identified 14 Indications of Past Attempts.Doors Modified & Util Task Force Formed (← links)
- PNO-I-88-061, on 880606,sewage Dumped on Whitaker Farm by Vynp Station & Contracted Hauler A-1 Sanitary.Agreement Made W/Contractor & Owners of Farm to Aid in Fertilization.In Jan 1986 Vynp Station Sewage Taken to Brattleboro,Vt (← links)
- ML20207G422 (← links)
- PNO-I-85-049, on 850712,seven Man Picket Line Was Set Up at Plant Main Entrance to Protest Use of non-union Contractor Employed at Site on 850708.Plant Security Declared Security Alert.Local Police Providing Support for Traffic Control (← links)
- PNO-I-87-116, on 871215,motor-operated Outboard Drywell Spray Discharge Isolation Valve RHR-26A Failed to Stoke & Valve Overload Alarm Received & Valve Breader Tripped.Standby Diesel Generator B Being Restored (← links)
- ML20249B150 (← links)
- ML20249B031 (← links)
- ML20249A954 (← links)
- ML20249A896 (← links)
- ML20249A125 (← links)
- PNO-I-98-021, on 980609,automatic Reactor Scram Occurred. Except for Single Control Rod Position Indication Problem, Initial Plant Response to Scram Expected.Licensee Initiated Investigation to Understand Causes of Event Complications (← links)
- ML20248L236 (← links)
- PNO-I-89-037, on 890517,determined That Eight Person Crew Socks Contaminated to 200 Counts Per Minute Over Background. Caused by Working on Refueling Floor.Licensee Surveyed Temporary Residences of Crew Members (← links)
- ML20236V362 (← links)
- ML20236U672 (← links)
- ML20236U413 (← links)
- ML20236U311 (← links)
- ML20236U214 (← links)
- ML20236F427 (← links)
- PNO-I-89-021, 890310,unusual Event Declared Due to Loss of Reactor Water Level Beginning on 890309.Caused When RHR Loop Pump Suction Valve a Stroked Open for Maint Testing.Level Returned to Normal Using CRD Sys Pump (← links)
- PNO-I-91-018, on 910225,requalification Exam Administered During Wk of 910225 Indicated That Requalification Program at Facility Unsatisfactory (← links)
- ML20216K117 (← links)
- PNO-I-86-085, on 861021,train Collided W/Propane Tank Truck Outside Site,Resulting in Minor Propane Leak.Plant Fire Brigade Commander Dispatched to Site.No Addl Action by Licensee Necessary (← links)
- PNO-I-97-053, on 970826,special Security Insp Will Be Performed,That Will Examine Security Activities at Vermont Yankee,Pilgrim & Indian Point 3.Team Will Include Security Specialists from Region I & NRR (← links)
- PNO-I-88-064A, on 880617,util Union Employees Voted to Ratify Amended Labor Contract.Union Employees Voted to Reject 880616 Proposal Not Implemented & Normal Plant Operations Not Impacted (← links)
- PNO-I-88-064, on 880616,util Union Employees Voted to Reject Proposed Labor Contract.Licensee Established Contigency Strike Plans to Ensure That Min Tech Spec,Emergency Plan & Administrative Procedures Staffing Levels Maintained (← links)