PN-75-032:on 750604,IE Was Informed That Due to Failure of Unit Start Up Transformer,Plant Was Performing Orderly Shutdown & Would Remain Shutdown Until Startup Transformer Which Failed,Could Be Functionally Replaced
ML20236U214
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 06/04/1975
From: Jennifer Davis, Dreher F, Thornburg H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
To:
References
PN-75-032, PN-75-32, NUDOCS 9807290387
Download: ML20236U214 (1)


Text

-v w wvw w

y~v a v-y --

l l

PRELIMINARY NOTIFICATION - NOT FOR PUBLIC DISCLOSURE I

f%

June 4, 1975 PRELIMINARY NOTIFICATION OF EVENT OR UNUSUAL OCCURRENCE

--PN-75-32

..?

This preliminary notification constitutes EARLY notice of events of l

POSSIBLE safety or public interest significance. The information presented is as initially received without verification or evaluation and is basically all that is known by OIE staff as of 4:45 p.m. on date of this notification.

IT SHOULD BE SPECIFICALLY NOTED THAT THIS

(

NOTIFICATION MAY CONTAIN INFORMATION THAT LATER MAY BE DETERMINED TO I

BE INACCURATE OR INCONSISTENT. AN OFFICE OF INSPECTION AND ENFORCEMENT NOTIFICATION OF AN INCIDENT OF OCCURRENCE (BLUE SHEET) SUBSEQUENTLY

  • * * ~ ' ' '

WILL BE ISSUED IF WARRANTED.

Facility: Vermont Yankee l

Vermont Yankee Nuclear Power Corporation l

Subject:

PLANT SHUTDOWN FOR POSSIBLE EXTENDED PERIOD DUS TO FAILURE OF l

START UP TRANSFORMER IE was informed on June 4, 1975 that due to the failure of the unit start up transformer, the plant was performing an orderly shutdown,,and would l

remain shutdown until the startup transformer which failed could be func-p l

-tionally replaced.

This transformer supplies power to the unit's cooling l

towers which are the only allowed heat sink. During the shutdown, the river was used as a cooling water heat sink.

The licensee is investigat-e l I ing this Environmental occurrence.

The extent of the shutdown depends on the availability of mobile transformers or a replacement transformer.

The latter action could result in a shutdown of several months.,

/

l Media interest is expected because of possibility of an extended 2) outage.

A l

CD l

The State of Vermont is being kept informed. A press release is not 7

planned.

Contact:

FADreher, IE x7261 HDThornburg, IE x7353 JGDavis, IE x7541 Distribution:

Chairman Anders Commissioner Mason S. J. Chilk, SECY j

Commission,e,r Gilinsky,,

Commissioner Rowden G. F. Murphy, JCAE Commissid'er Kennedy C. C. Kammerer, CA l

n L. V. Gossick, EDO D. F. Knuth, IE J. A. Harris, PA B. C. Rusche, NRR H. H. T3rown, ISP K. R. Chapman, NMSS H. K, Shapar, ELD Transmitted: P Bldg 9';rr A.; H St 9/-/r'h,; MD Bldg /d 'o rc,

-q PRELIMINARY NOTIFICATION - NOT FOR PUBLIC DISCLOSURE 9807290387 750604 PDR I&E PN-75-032 PDR l

-. - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -